I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
Top trending discussions
posted on 7 Jan 2025
Pneumatic systems use compressed air to transmit power for various applications.
Compressed air is stored in a tank and released through valves to actuate cylinders or motors.
Pneumatic systems are commonly used in industries for automation, such as in manufacturing processes.
Examples include pneumatic drills, robotic arms, and air brakes in vehicles.
Sensors are devices that detect and respond to physical input from the environment.
Temperature sensors - detect changes in temperature
Pressure sensors - measure pressure changes
Motion sensors - detect movement
Proximity sensors - detect nearby objects
Light sensors - measure light intensity
MTTR stands for Mean Time To Repair, the average time taken to repair a failed component. MTBF stands for Mean Time Between Failures, the average time between failures of a component.
MTTR is the average time taken to repair a failed component.
MTBF is the average time between failures of a component.
MTTR = Total downtime / Number of failures
MTBF = Total uptime / Number of failures
Power factor is a measure of how effectively electrical power is being used in a circuit.
Power factor is the ratio of real power to apparent power in an electrical system.
It is important for efficient power transmission and distribution.
Power factor is maintained by using power factor correction devices like capacitors.
A power factor of 1 indicates all power is being used effectively, while a lower power factor means s...
posted on 27 Apr 2023
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I worked on a project to develop a mobile application for a local restaurant.
The project involved designing the user interface and user experience of the app.
I collaborated with a team of developers to build the app using React Native.
We integrated features such as online ordering, menu browsing, and push notifications.
I also conducted user testing and made improvements based on feedback.
The project was completed withi
Job performances are evaluated based on the quality and quantity of work done, adherence to deadlines, teamwork, and communication skills.
Quality and quantity of work done
Adherence to deadlines
Teamwork
Communication skills
I applied via Newspaper Ad and was interviewed in Jun 2023. There were 2 interview rounds.
To reduce resistance in a transformer, one can use low resistance materials, increase the cross-sectional area of the winding, and minimize the length of the winding.
Use low resistance materials for the transformer windings
Increase the cross-sectional area of the winding to reduce resistance
Minimize the length of the winding to reduce resistance
Ensure proper insulation to avoid any short circuits
Maintain proper cooling
Testing of energy meters, CTs and PTs involves verifying their accuracy and functionality.
Energy meters are tested to ensure they measure energy consumption accurately.
CTs (Current Transformers) are tested to verify their current ratio and accuracy.
PTs (Potential Transformers) are tested to verify their voltage ratio and accuracy.
Testing may involve simulating different load conditions and measuring the output.
Calibrat...
Energy meter can be tested on line mode at site using a portable test equipment.
Use a portable test equipment to simulate the load and measure the output of the energy meter.
Ensure that the test equipment is calibrated and accurate.
Perform the test during normal operating conditions to get accurate results.
Compare the readings with the manufacturer's specifications to determine if the energy meter is functioning proper...
CT can be tested at site with load condition using a test kit and a load bank.
Use a test kit to measure the CT ratio and polarity
Connect the CT to a load bank to simulate load conditions
Measure the output voltage and current of the CT under load
Compare the measured values with the CT specifications
Repeat the test for different load conditions
Ensure safety precautions are taken during the test
PT can be tested at load condition by applying the load and measuring the voltage and current.
Apply the load to the PT
Measure the voltage and current using appropriate instruments
Calculate the power factor and accuracy of the PT
Ensure that the PT is within the acceptable limits of error
Repeat the test at different load conditions to ensure accuracy
Over current relay is set based on the load current and time characteristics.
Determine the maximum load current and time characteristics
Select the appropriate over current relay type and current rating
Calculate the relay settings based on the load current and time characteristics
Adjust the settings to ensure proper coordination with other protective devices
Test the relay to ensure proper operation
posted on 13 Sep 2024
Manpower can be effectively handled by proper planning, communication, training, and motivation.
Develop a clear plan for manpower allocation and scheduling.
Communicate effectively with the team to ensure everyone is on the same page.
Provide necessary training and resources to enhance skills and productivity.
Motivate the team through recognition, rewards, and a positive work environment.
posted on 17 Sep 2023
I applied via Campus Placement and was interviewed in Aug 2023. There were 3 interview rounds.
Simple 20 question online test
posted on 27 Apr 2023
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I worked on a project to develop a mobile application for a local restaurant.
The project involved designing the user interface and user experience of the app.
I collaborated with a team of developers to build the app using React Native.
We integrated features such as online ordering, menu browsing, and push notifications.
I also conducted user testing and made improvements based on feedback.
The project was completed withi
Job performances are evaluated based on the quality and quantity of work done, adherence to deadlines, teamwork, and communication skills.
Quality and quantity of work done
Adherence to deadlines
Teamwork
Communication skills
posted on 27 Dec 2024
I applied via Campus Placement
Polymorphism is the ability of a single function or method to operate on different types of data.
Polymorphism allows objects of different classes to be treated as objects of a common superclass.
There are two types of polymorphism: compile-time (method overloading) and runtime (method overriding).
Example: Inheritance in object-oriented programming languages like Java allows for polymorphism.
Example: Function overloading
A 3-bit up/down counter can be designed using flip-flops and logic gates.
Use 3 D flip-flops to store the count value.
Connect the Q output of each flip-flop to the D input of the next flip-flop.
Use logic gates to control the direction of counting (up or down).
Testing of energy meters, CTs and PTs involves verifying their accuracy and functionality.
Energy meters are tested to ensure they measure energy consumption accurately.
CTs (Current Transformers) are tested to verify their current ratio and accuracy.
PTs (Potential Transformers) are tested to verify their voltage ratio and accuracy.
Testing may involve simulating different load conditions and measuring the output.
Calibrat...
Energy meter can be tested on line mode at site using a portable test equipment.
Use a portable test equipment to simulate the load and measure the output of the energy meter.
Ensure that the test equipment is calibrated and accurate.
Perform the test during normal operating conditions to get accurate results.
Compare the readings with the manufacturer's specifications to determine if the energy meter is functioning proper...
CT can be tested at site with load condition using a test kit and a load bank.
Use a test kit to measure the CT ratio and polarity
Connect the CT to a load bank to simulate load conditions
Measure the output voltage and current of the CT under load
Compare the measured values with the CT specifications
Repeat the test for different load conditions
Ensure safety precautions are taken during the test
PT can be tested at load condition by applying the load and measuring the voltage and current.
Apply the load to the PT
Measure the voltage and current using appropriate instruments
Calculate the power factor and accuracy of the PT
Ensure that the PT is within the acceptable limits of error
Repeat the test at different load conditions to ensure accuracy
Over current relay is set based on the load current and time characteristics.
Determine the maximum load current and time characteristics
Select the appropriate over current relay type and current rating
Calculate the relay settings based on the load current and time characteristics
Adjust the settings to ensure proper coordination with other protective devices
Test the relay to ensure proper operation
based on 3 reviews
Rating in categories
Junior Engineer
7
salaries
| ₹3 L/yr - ₹3.8 L/yr |
Technician
5
salaries
| ₹2.3 L/yr - ₹2.7 L/yr |
Deputy Engineer
5
salaries
| ₹3.8 L/yr - ₹4.5 L/yr |
Senior Manager Sales & Marketing
5
salaries
| ₹21 L/yr - ₹26 L/yr |
Quality Engineer
5
salaries
| ₹5 L/yr - ₹10 L/yr |
BHEL
Tata Power
Siemens
Larsen & Toubro Limited