i
Nevon Solutions
Filter interviews by
Be the first one to contribute and help others!
posted on 8 Nov 2022
I applied via Company Website and was interviewed in Oct 2022. There were 2 interview rounds.
AC is used in long transmission due to its ability to be easily stepped up or down in voltage.
AC can be easily transformed to higher or lower voltages using transformers
AC has less power loss over long distances compared to DC
AC generators are more efficient and cost-effective than DC generators for power generation
posted on 20 Jul 2022
Cycle time is the time it takes to complete one cycle of a process, while takt time is the rate at which a product must be produced to meet customer demand.
Cycle time is the total time it takes to complete a process, from start to finish.
Takt time is the maximum amount of time allowed to produce one unit of a product in order to meet customer demand.
Cycle time can be used to identify bottlenecks and inefficiencies in a...
Productivity refers to the efficiency and effectiveness of completing tasks and achieving goals.
Productivity is a measure of output per unit of input.
It involves maximizing the use of resources to achieve desired outcomes.
Examples of productivity measures include revenue per employee, units produced per hour, and customer satisfaction ratings.
Improving productivity can lead to increased profitability, competitiveness,
posted on 11 Apr 2022
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Really good
posted on 8 May 2021
I applied via LinkedIn and was interviewed in Nov 2020. There was 1 interview round.
PPM stands for parts per million and is a measure of defects or errors in a process in six sigma methodology.
PPM is a unit of measure used to quantify the number of defects or errors in a process.
In six sigma methodology, the goal is to have no more than 3.4 defects per million opportunities (DPMO).
PPM is calculated by dividing the number of defects by the total number of opportunities and multiplying by one million.
PP...
posted on 8 Nov 2022
I applied via Company Website and was interviewed in Oct 2022. There were 2 interview rounds.
AC is used in long transmission due to its ability to be easily stepped up or down in voltage.
AC can be easily transformed to higher or lower voltages using transformers
AC has less power loss over long distances compared to DC
AC generators are more efficient and cost-effective than DC generators for power generation
posted on 20 Jul 2022
Cycle time is the time it takes to complete one cycle of a process, while takt time is the rate at which a product must be produced to meet customer demand.
Cycle time is the total time it takes to complete a process, from start to finish.
Takt time is the maximum amount of time allowed to produce one unit of a product in order to meet customer demand.
Cycle time can be used to identify bottlenecks and inefficiencies in a...
Productivity refers to the efficiency and effectiveness of completing tasks and achieving goals.
Productivity is a measure of output per unit of input.
It involves maximizing the use of resources to achieve desired outcomes.
Examples of productivity measures include revenue per employee, units produced per hour, and customer satisfaction ratings.
Improving productivity can lead to increased profitability, competitiveness,
posted on 22 Jul 2022
I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.
Number systems and matches
Hr routes for self introduction, semester programme
I applied via Campus Placement and was interviewed in Mar 2024. There were 2 interview rounds.
Topics for GD round has already been provided 2hrs prior to the commencement of GD round, Mr. Rohit patil the head of HR will conduct the first round that will be the GD.
My favorite subject is Mechanical Engineering because I enjoy designing and analyzing systems and structures.
I enjoy learning about thermodynamics, fluid mechanics, and materials science
I like applying theoretical knowledge to practical projects
I find the process of optimizing designs and solving complex problems rewarding
posted on 11 Apr 2022
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
Really good
posted on 8 May 2021
I applied via LinkedIn and was interviewed in Nov 2020. There was 1 interview round.
PPM stands for parts per million and is a measure of defects or errors in a process in six sigma methodology.
PPM is a unit of measure used to quantify the number of defects or errors in a process.
In six sigma methodology, the goal is to have no more than 3.4 defects per million opportunities (DPMO).
PPM is calculated by dividing the number of defects by the total number of opportunities and multiplying by one million.
PP...
Embedded Developer
7
salaries
| ₹1.5 L/yr - ₹2.8 L/yr |
HR Generalist
7
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Technical Sales Engineer
6
salaries
| ₹2.5 L/yr - ₹3.6 L/yr |
Software Sales Engineer
5
salaries
| ₹3 L/yr - ₹3.5 L/yr |
Software Developer
5
salaries
| ₹1.8 L/yr - ₹2.6 L/yr |
TCS
Infosys
Wipro
HCLTech