I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
Production refers to the process of creating goods or services through various stages of manufacturing or assembly.
Production involves transforming raw materials or components into finished products.
It includes activities such as planning, sourcing, manufacturing, quality control, and distribution.
Production chemists play a crucial role in developing and optimizing chemical processes for manufacturing pharmaceuticals, ...
BMS stands for Batch Manufacturing Record and BPR stands for Batch Production Record.
BMS is a document that contains detailed instructions for the production of a specific batch of a product.
It includes information about the raw materials, equipment, manufacturing steps, and quality control tests.
BPR is a record that documents the actual production data and results obtained during the manufacturing process.
It provides ...
Caps and change control are processes used in production to ensure quality and consistency.
Caps refers to the specifications and limitations placed on a product or process.
Change control is a system for managing and documenting changes to a product or process.
Caps and change control help maintain quality, regulatory compliance, and consistency in production.
Examples of caps include maximum allowable impurity levels in ...
posted on 14 Mar 2025
I appeared for an interview in Feb 2025, where I was asked the following questions.
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There were 4 interview rounds.
One success story involves a company increasing sales by 50% through targeted marketing strategies.
Company implemented personalized email campaigns based on customer preferences
Utilized social media advertising to reach new audiences
Offered exclusive promotions to loyal customers
Resulted in a 50% increase in sales within 6 months
I applied via Naukri.com and was interviewed in Nov 2024. There were 3 interview rounds.
Neuland Laboratories interview questions for popular designations
I appeared for an interview before Apr 2024, where I was asked the following questions.
Get interview-ready with Top Neuland Laboratories Interview Questions
I appeared for an interview in Jan 2025.
LinkedIn is a professional networking platform, while Naukri is a job portal. They serve different purposes.
LinkedIn is primarily used for professional networking and building connections.
Naukri is a job portal where individuals can search for job opportunities and apply for them.
The two platforms cater to different needs and audiences, so they may not be directly linked.
Employers may use LinkedIn to showcase their com...
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
Transformer standards refer to the set of guidelines and specifications that transformers must meet to ensure safety and efficiency.
Transformer standards are established by organizations such as IEEE, IEC, and NEMA.
These standards cover aspects like design, testing, installation, and maintenance of transformers.
Examples of transformer standards include IEEE C57.12.00 for liquid-immersed transformers and IEC 60076 for p
Lock out tag out can be ensured by implementing proper procedures, training employees, using lockout devices, and conducting regular audits.
Develop and implement a comprehensive lockout tagout program
Provide thorough training to all employees on lockout tagout procedures
Use lockout devices such as locks and tags to physically prevent equipment from being energized
Conduct regular audits and inspections to ensure complia...
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
Transformers must meet specific standards to ensure safety, efficiency, and reliability.
Transformers must comply with industry standards such as IEEE, ANSI, and IEC.
Standards cover aspects like design, construction, testing, and performance.
Examples of standards include IEEE C57.12.00 for liquid-immersed transformers and ANSI C57.12.10 for dry-type transformers.
A 33kV line diagram shows the layout and connections of a high voltage electrical transmission line.
A 33kV line diagram typically includes components such as transformers, circuit breakers, isolators, and conductors.
It shows the flow of electricity from the power source to the load.
The diagram may also indicate the locations of substations and switching stations along the line.
It helps in understanding the overall stru...
To ensure proper lockout/tagout (LOTO) procedure, follow these steps
Train employees on LOTO procedures
Use lockout devices to secure energy sources
Tag equipment with information about who is authorized to work on it
Verify energy isolation before starting work
Regularly review and update LOTO procedures
Conduct periodic audits to ensure compliance
I appeared for an interview in Sep 2024, where I was asked the following questions.
A reaction scheme outlines the steps and intermediates in a chemical reaction, illustrating reactants to products.
A reaction scheme typically includes reactants, products, and intermediates.
It may depict reaction conditions like temperature and catalysts.
Example: The synthesis of aspirin from salicylic acid and acetic anhydride.
Mechanistic details can be included, showing electron movement.
Reaction schemes can be repre...
Top trending discussions
The duration of Neuland Laboratories interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 44 interviews
Interview experience
based on 588 reviews
Rating in categories
Chemist
256
salaries
| ₹1.8 L/yr - ₹4.9 L/yr |
Officer
217
salaries
| ₹3 L/yr - ₹6.1 L/yr |
Assistant Manager
157
salaries
| ₹5.5 L/yr - ₹12 L/yr |
Executive
153
salaries
| ₹3.7 L/yr - ₹7.4 L/yr |
Research Associate
93
salaries
| ₹3 L/yr - ₹6 L/yr |
Abbott
Granules India
Sanofi
Unichem Laboratories