Filter interviews by
Top trending discussions
posted on 20 Dec 2024
posted on 20 Jul 2023
I applied via Walk-in and was interviewed before Jul 2022. There were 4 interview rounds.
Mechanical or previous company
posted on 23 Jul 2024
Reasoning and assertive queries
I applied via Campus Placement and was interviewed before Aug 2022. There were 3 interview rounds.
If you are fresher then it will take Aptitude test
posted on 19 Jan 2018
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 3 interview rounds.
MHr stands for Man-Hour. Costing is done by calculating the total number of man-hours required for a task and multiplying it by the cost per hour.
MHr stands for Man-Hour, which is a unit of measurement for the amount of work performed by an individual in one hour.
Costing is done by determining the total number of man-hours required for a specific task or project.
The cost per hour is then multiplied by the total number ...
I do not have the current pricing information for ADC 12 & plastic resins.
I apologize, but I do not have the current pricing information for ADC 12 & plastic resins.
I would need to conduct research or consult with a colleague who has access to this information.
Pricing for these materials can fluctuate frequently based on market demand and other factors.
Costing of plastic and casting parts involves analyzing material costs, production processes, and overhead expenses.
Analyze the material costs by considering the type and quantity of plastic or casting material required.
Evaluate the production processes involved in manufacturing the parts, including molding or casting techniques.
Consider the labor costs, machine costs, and energy costs associated with the production pr...
To determine the machine and tool cost for a plastic part.
Analyze the dimensions and material of the plastic part
Identify the required tolerances and surface finish
Consider the production volume and lead time
Research the available machines and their capabilities
Calculate the tooling cost based on the chosen machine
Consider the maintenance and operating costs of the machine
I applied via Approached by Company and was interviewed in Feb 2024. There were 4 interview rounds.
I have 5 years of experience in retail management, including overseeing staff, inventory management, and customer service.
Managed a team of 15 employees in a retail store
Implemented inventory control measures to reduce shrinkage by 10%
Improved customer satisfaction ratings by 15% through training and development programs
My salary expectations are based on my experience, qualifications, and the responsibilities of the role.
Research the average salary range for Assistant Managers in the industry and location
Consider your own experience, skills, and qualifications
Factor in the responsibilities and expectations of the specific role
Be prepared to negotiate based on the overall compensation package offered
TPM knowledge refers to understanding and implementing Total Productive Maintenance practices to improve equipment reliability and efficiency.
TPM involves proactive maintenance to prevent breakdowns and improve overall equipment effectiveness
It focuses on empowering operators to take ownership of equipment maintenance
Examples include implementing autonomous maintenance tasks and conducting regular equipment inspections
System knowledge is essential for an Assistant Manager to effectively navigate and utilize various tools and technologies within the organization.
Understanding of the company's internal systems and processes
Proficiency in using software and tools relevant to the role (e.g. CRM, ERP)
Ability to troubleshoot technical issues and provide support to team members
Knowledge of data security protocols and best practices
Experien...
I have 5 years of experience as an Assistant Manager at XYZ Company, where I successfully led a team of 10 employees.
Led a team of 10 employees
Implemented new strategies to increase productivity
Managed daily operations and ensured smooth workflow
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
220
salaries
| ₹3 L/yr - ₹8.5 L/yr |
Diploma Engineer
197
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Production Engineer
112
salaries
| ₹1.5 L/yr - ₹6.5 L/yr |
Diploma Mechanical Engineer
106
salaries
| ₹1.6 L/yr - ₹4.2 L/yr |
Associate Manager
101
salaries
| ₹4.8 L/yr - ₹14 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda