I applied via Referral and was interviewed in Jun 2021. There was 1 interview round.
DI pipe end is the point where the ductile iron pipe terminates.
DI pipe end refers to the termination point of a ductile iron pipe.
It is typically a circular opening or a flanged connection.
DI pipe ends are designed to facilitate the connection of pipes or fittings.
They can be threaded, grooved, or have a plain end for different types of connections.
Examples of DI pipe ends include socket ends, spigot ends, and flanged
The fitting used in i/c oh 900×700mm DI pipe line depends on the specific requirements of the project.
The type of fluid being transported through the pipeline
The pressure and temperature of the fluid
The location and accessibility of the pipeline
The budget and timeline of the project
Common fittings used in DI pipelines include flanges, couplings, and valves
Top trending discussions
I appeared for an interview before Feb 2024.
I have 5 years of experience working as a mechanical engineer in the automotive industry.
Worked on designing and testing automotive components
Managed projects from concept to production
Collaborated with cross-functional teams to solve engineering challenges
I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.
MCQ based 50 marks 50 questions test.
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 3 interview rounds.
Unit testing for adding two numbers
Create a test case with two numbers and expected sum
Call the function that adds two numbers
Assert that the result matches the expected sum
posted on 10 Dec 2022
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
Detailed information about the previous company where i worked.Discussed with project manager regarding my roles and assignments i had taken on work location.Along with that we discussed about my academic projects and skills that i had mastered in my career
Interviewers gave me the task to elaborate the design of pollution control equipments and assessments
I have worked for ABC Construction Company for 3 years as a Site Engineer.
Worked at ABC Construction Company for 3 years
Managed construction projects on site
Ensured adherence to safety regulations
I have worked on various pipeline projects including water supply, sewerage, and gas pipelines.
Water supply pipeline installation and maintenance
Sewerage pipeline construction and repair
Gas pipeline inspection and testing
I applied via Campus Placement and was interviewed before Dec 2020. There were 5 interview rounds.
I applied via Referral and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
based on 1 review
Rating in categories
Assistant Engineer
7
salaries
| ₹2.7 L/yr - ₹4.5 L/yr |
Assistant Manager
6
salaries
| ₹4.5 L/yr - ₹7.5 L/yr |
Senior Engineer
6
salaries
| ₹7 L/yr - ₹8 L/yr |
Site Engineer
6
salaries
| ₹2.8 L/yr - ₹3.9 L/yr |
MIS Executive
5
salaries
| ₹2.6 L/yr - ₹3.1 L/yr |
Re Sustainability Limited
DuPont
WM Universal Solutions Private Limited
Clean Harbors