Filter interviews by
Top trending discussions
posted on 27 May 2022
I applied via Newspaper Ad and was interviewed before May 2021. There was 1 interview round.
posted on 5 Jul 2021
I applied via Campus Placement and was interviewed in Jan 2021. There were 5 interview rounds.
posted on 29 Jun 2017
I appeared for an interview in Apr 2017.
I am a recent graduate with a degree in Mechanical Engineering, passionate about problem-solving and eager to learn and grow in the field.
Recent graduate with a degree in Mechanical Engineering
Passionate about problem-solving
Eager to learn and grow in the field
posted on 19 Aug 2015
A transformer diagram can be drawn from both primary and secondary ends.
Draw two parallel lines representing the core of the transformer
Draw two coils around the core, one for primary and one for secondary
Connect the coils with a dotted line to represent the magnetic field
Label the primary and secondary coils and indicate the direction of current flow
Include any additional components such as taps or shields
Crona is not a known term in the context of substations. Please provide more information.
Crona is not a known term in the context of substations
It is important to use correct terminology when discussing technical topics
Preventing issues in substations involves proper maintenance and monitoring
Examples of issues that can occur in substations include equipment failure and power outages
The efficiency of a power plant is the ratio of output power to input power.
Efficiency is affected by factors such as fuel type, technology used, and maintenance.
Higher efficiency means less fuel is needed to produce the same amount of power.
Efficiency can be improved through upgrades and modifications to the plant.
Efficiency can be calculated using the formula: Efficiency = (Output Power / Input Power) x 100%
For examp...
Efficiency of transformer is the ratio of output power to input power.
Efficiency is an important parameter for transformers.
It is calculated as the ratio of output power to input power.
Efficiency is always less than 100% due to losses in the transformer.
Transformers with higher efficiency are preferred as they waste less energy.
Efficiency can be improved by using better materials and design.
For example, a transformer w...
Different types of transmission wires are used in transmission made of different metals for their specific properties.
Copper wires are commonly used for their high conductivity.
Aluminum wires are used for long-distance transmission due to their lightweight.
Steel-cored aluminum wires are used for their strength and conductivity.
Aerial bundled cables are used for their insulation properties.
Different metals are used base...
The height of a tower carrying 132kv depends on various factors such as terrain, weather, and distance between towers.
The height of the tower is determined by the voltage it carries and the distance between towers.
The terrain and weather conditions also play a role in determining the height of the tower.
The height of the tower can range from 15 meters to over 50 meters depending on the above factors.
For example, in hil...
CT and PT can be differentiated visually in substation by their size, shape, and labeling.
CTs are typically larger and cylindrical in shape, while PTs are smaller and more rectangular.
CTs are often labeled with a ratio, such as 100:5, while PTs are labeled with a voltage rating.
CTs are usually located on the high voltage side of the substation, while PTs are on the low voltage side.
CTs are used to measure current, whil
Single phase induction motor works on the principle of electromagnetic induction.
It has a stator and a rotor.
The stator has a single phase winding which produces a magnetic field.
The rotor is either squirrel cage or wound type.
When AC supply is given to the stator winding, it produces a magnetic field which induces a current in the rotor.
This current produces a magnetic field in the rotor which interacts with the stato...
Yes, I organized a technical fest in college as the head coordinator.
Planned and executed the entire event with a team of 20 members
Managed a budget of INR 5 lakhs and ensured timely payments to vendors
Coordinated with sponsors and invited industry experts as guest speakers
Handled logistics, marketing, and publicity of the event
Received positive feedback from participants and faculty members
ISTE is a national professional society for educators and students in engineering and technology fields.
ISTE stands for Indian Society for Technical Education
It is a non-profit organization that aims to improve technical education in India
As the chairman of Durgapur Chapter, I organized various workshops and seminars for students and faculty members
I also encouraged students to participate in technical competitions and...
I would approach the workman and explain the importance of safety rules and PPE, and offer assistance if needed.
Approach the workman in a calm and respectful manner
Explain the safety rules and the importance of following them
Demonstrate the proper use of PPE and offer assistance if needed
Provide incentives for compliance, such as rewards or recognition
Document any incidents or non-compliance for future reference
No, I am open to working in remote locations in India.
I am willing to explore new places and cultures.
I understand that remote locations may offer unique challenges, but I am up for the task.
I am excited about the opportunity to contribute to the company's growth and success, regardless of the location.
I am adaptable and can adjust to new environments quickly.
I believe that working in a remote location will provide me ...
posted on 18 Jan 2015
I am a graduate engineer with a passion for problem-solving. My family is supportive and has always encouraged me to pursue my dreams.
I graduated with a degree in engineering from XYZ University
I have completed internships at ABC Company and DEF Inc.
My family consists of my parents and two siblings
My parents have always been supportive of my career aspirations
My siblings are also pursuing careers in STEM fields
My internship at Schlumberger was a great learning experience.
I worked on a project related to well logging and data analysis.
I enjoyed the hands-on experience of working with the equipment and software.
I disliked the long hours and tight deadlines.
I learned a lot about the oil and gas industry and gained valuable skills.
I appreciated the supportive and collaborative work environment.
Overall, it was a challenging but r
My experience at Schlumberger would help me perform well at Rio Tinto by providing me with relevant technical skills and a strong work ethic.
Schlumberger and Rio Tinto are both global companies with a focus on innovation and technology
My experience at Schlumberger has given me a strong foundation in technical skills such as data analysis and problem-solving
Working at Schlumberger has also taught me the importance of te...
I have not worked with the control group in Norway.
I have not had the opportunity to work with the control group in Norway.
My experience and expertise lie in other areas of engineering.
However, I am always eager to learn and expand my knowledge in different fields.
I have been actively involved in various leadership roles at IITK.
Served as the President of the Robotics Club, leading a team of 20+ members to organize various events and workshops.
Organized a national level technical symposium, managing a team of 50+ volunteers and coordinating with sponsors and speakers.
Mentored junior students as a Teaching Assistant for a course on Robotics and Control Systems.
Led a team of 5 stu...
I introduced a mentorship program and organized more industry visits for the B-club.
Introduced a mentorship program to help members gain practical experience.
Organized more industry visits to expose members to real-world engineering practices.
Encouraged members to participate in more technical competitions to improve their skills.
Improved communication and collaboration among team members.
Implemented a feedback system ...
I worked in a team to develop a software application for a client.
Collaborated with team members to gather client requirements
Assigned tasks to team members based on their strengths
Held regular meetings to discuss progress and address any issues
Tested and reviewed each other's work to ensure quality
Delivered the project on time and within budget
posted on 29 Mar 2015
posted on 15 Jan 2015
posted on 15 Jan 2015
posted on 8 Jan 2015
based on 1 interview
Interview experience
Deputy Manager
37
salaries
| ₹13 L/yr - ₹28 L/yr |
Assistant Manager
31
salaries
| ₹11 L/yr - ₹24 L/yr |
Manager
16
salaries
| ₹19 L/yr - ₹30 L/yr |
Senior Manager
11
salaries
| ₹29 L/yr - ₹40 L/yr |
Assistant General Manager
9
salaries
| ₹27 L/yr - ₹42 L/yr |
Hindalco Industries
Hindustan Zinc
Vedanta Aluminium
Vedanta Resources