Upload Button Icon Add office photos

Filter interviews by

Nalco water General Operator Interview Questions and Answers

Updated 8 Dec 2020

Nalco water General Operator Interview Experiences

1 interview found

I applied via Recruitment Consultant and was interviewed before Dec 2019. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Previous company experience related question and all the safety related question.

Interview Preparation Tips

Interview preparation tips for other job seekers - Very happy.Thanks to naukri team to find a better job like this.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Water treatment
  • Q2. Instrumentation
Round 2 - HR 

(2 Questions)

  • Q1. Confidence building
  • Q2. Team building capability

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.

I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Pumps, Motors & Aerators
  • Q2. Working principle of pumps and Aerators
  • Ans. 

    Pumps and aerators are used to move fluids and gases respectively.

    • Pumps work by creating a pressure difference to move fluids from one place to another.

    • Aerators introduce air into liquids to increase oxygen levels and promote biological processes.

    • Types of pumps include centrifugal, positive displacement, and jet pumps.

    • Types of aerators include surface aerators, diffused aerators, and mechanical aerators.

  • Answered by AI
  • Q3. Pump calculation

Interview Preparation Tips

Interview preparation tips for other job seekers - Need more dedication and avoid unnecessary talks while answering important questions

I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Network, STP, Wet well, Pumping Station related.
  • Q2. TECHNICAL STP & WET WELL RELATED

Interview Preparation Tips

Interview preparation tips for other job seekers - Deep knowledge about planning, schedule & Execution .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Basics of Water Treatment
  • Q2. Working Principle of DM Plant
  • Ans. 

    DM Plant removes impurities like salts and minerals from water using ion exchange process.

    • DM Plant stands for Demineralization Plant.

    • It uses ion exchange process to remove impurities like salts and minerals from water.

    • It consists of cation exchange resin and anion exchange resin columns.

    • Cations and anions in water are exchanged with hydrogen and hydroxyl ions in the resins.

    • The treated water is then passed through mixed...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Ion Exchange India Senior Engineer interview:
  • Water Treatment
  • Waste Water Treatment
Interview preparation tips for other job seekers - Study Basics of Water Treatment

I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Concrete structure and water supply related
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Where do you see yourself in 5 years?

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good response by HR team and managment

I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Detailed information about the previous company where i worked.Discussed with project manager regarding my roles and assignments i had taken on work location.Along with that we discussed about my academic projects and skills that i had mastered in my career

Round 3 - Assignment 

Interviewers gave me the task to elaborate the design of pollution control equipments and assessments

Interview Questionnaire 

6 Questions

  • Q1. Drum level transmitter
  • Q2. Boiler interlocking
  • Q3. Vibration sensors
  • Q4. Turbine parameters and interlocking
  • Q5. DCS tag assigning process
  • Ans. 

    DCS tag assigning process involves assigning unique names to process variables for monitoring and control.

    • DCS tag assigning process is crucial for efficient process control and monitoring.

    • Each tag represents a process variable and is assigned a unique name for easy identification.

    • Tags can be assigned manually or automatically based on the process requirements.

    • Tag naming conventions should be consistent and follow indus...

  • Answered by AI
  • Q6. Smart positioners like Simens Sipart 02

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident don't nervous

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Which are the equipment used in steam turbine? And their principal and working and troubleshooting?
  • Ans. 

    Equipment used in steam turbine include turbine blades, nozzles, casing, rotor, bearings, and governor.

    • Turbine blades: convert steam energy into mechanical energy

    • Nozzles: control the flow of steam into the turbine

    • Casing: contains and directs the steam flow through the turbine

    • Rotor: connected to the turbine blades and rotates to generate power

    • Bearings: support the rotor and reduce friction

    • Governor: regulates the speed o

  • Answered by AI
  • Q2. Tell us about the Woodward 505 ?
  • Ans. 

    Woodward 505 is a versatile control system used in industrial applications.

    • The Woodward 505 is a widely used control system in industries such as power generation, oil and gas, and marine.

    • It offers advanced features like PID control, sequencing, and communication capabilities.

    • The Woodward 505 is known for its reliability and robustness in harsh operating environments.

    • It can be easily integrated with various types of se

  • Answered by AI
  • Q3. Explain the structure of the Honeywell DCS ?
  • Ans. 

    The Honeywell DCS (Distributed Control System) is a modular system consisting of controllers, I/O modules, and operator stations.

    • Consists of controllers, I/O modules, and operator stations

    • Uses a network to communicate between components

    • Allows for centralized control and monitoring of processes

    • Supports various communication protocols such as Modbus, OPC, etc.

    • Example: Honeywell Experion PKS

  • Answered by AI
  • Q4. What is PID and How does it work ?
  • Ans. 

    PID stands for Proportional-Integral-Derivative, a control loop feedback mechanism used in engineering.

    • PID is a control algorithm that calculates an error value as the difference between a desired setpoint and a measured process variable.

    • Proportional (P) control responds to the current error value.

    • Integral (I) control accumulates past errors to correct the present error.

    • Derivative (D) control predicts future errors bas...

  • Answered by AI
  • Q5. How to assign new chennal in Honeywell DCS ?
  • Ans. 

    To assign a new channel in Honeywell DCS, you need to access the configuration software and follow the steps to add the channel.

    • Access the Honeywell DCS configuration software

    • Navigate to the channel configuration section

    • Add a new channel by specifying the channel number, type, and other relevant parameters

    • Save the changes and verify the new channel is successfully assigned

  • Answered by AI
  • Q6. Tell the interlock and permissive of boiler and turbine?
  • Ans. 

    Interlocks and permissives are safety mechanisms in place to prevent unsafe operation of boiler and turbine systems.

    • Interlocks prevent certain actions from taking place unless specific conditions are met

    • Permissives allow certain actions to take place only if specific conditions are met

    • Example of interlock: Boiler feed pump interlock prevents the boiler from starting unless the feed pump is running

    • Example of permissive:...

  • Answered by AI

Skills evaluated in this interview

Tell us how to improve this page.

Nalco water General Operator Salary
based on 8 salaries
₹2.4 L/yr - ₹6 L/yr
5% more than the average General Operator Salary in India
View more details

Nalco water General Operator Reviews and Ratings

based on 3 reviews

4.6/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 3 Reviews and Ratings
Applications Engineer
41 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Technical Engineer
34 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Chemist
22 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Territory Manager
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Incharge
17 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Nalco water with

Thermax Limited

4.1
Compare

Ion Exchange India

3.7
Compare

Ecolab

3.7
Compare

Veolia

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview