Upload Button Icon Add office photos

Filter interviews by

N B Constructions Interview Questions, Process, and Tips

Updated 11 Dec 2024

Top N B Constructions Interview Questions and Answers

View all 12 questions

N B Constructions Interview Experiences

Popular Designations

4 interviews found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 14 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(5 Questions)

  • Q1. How do make BBS?
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in construction.

    • Calculate the quantity of steel required based on structural drawings

    • Prepare a detailed list of reinforcement bars with sizes, shapes, and quantities

    • Include information on cutting length, bending shape, and placement of bars

    • Ensure accuracy and compliance with structural design requirements

    • Use software tools li

  • Answered by AI
  • Q2. Types of drawing
  • Ans. 

    Types of drawing include architectural drawings, engineering drawings, and technical drawings.

    • Architectural drawings: Plans, elevations, sections, and details of buildings and structures.

    • Engineering drawings: Mechanical, electrical, civil, and structural drawings for construction and manufacturing.

    • Technical drawings: Diagrams, schematics, and blueprints used for technical documentation and communication.

  • Answered by AI
  • Q3. Types of bars and their characteristics
  • Ans. 

    Types of bars include reinforcement bars, tension bars, compression bars, and stirrups.

    • Reinforcement bars are used to strengthen concrete structures.

    • Tension bars are used to resist tension forces in structures.

    • Compression bars are used to resist compression forces in structures.

    • Stirrups are used to provide lateral support to reinforcement bars in beams and columns.

  • Answered by AI
  • Q4. What is the different types of mix
  • Ans. 

    Different types of mix include concrete mix, mortar mix, and asphalt mix.

    • Concrete mix: used for construction projects, typically made of cement, sand, and gravel

    • Mortar mix: used for masonry work, made of cement, sand, and water

    • Asphalt mix: used for road construction, made of asphalt cement, aggregates, and filler materials

  • Answered by AI
  • Q5. What is the different type of cement
  • Ans. 

    Different types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.

    • Portland cement is the most common type used in construction.

    • White cement is used for architectural purposes and to create colored concrete.

    • Rapid hardening cement sets quickly and is used in projects with tight deadlines.

    • Low heat cement generates less heat during hydration and is used in large concrete structure

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honesy

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(6 Questions)

  • Q1. What is the CAR policy
  • Ans. 

    The CAR policy refers to the policy regarding the use of company-owned vehicles.

    • CAR stands for Company Automobile Reimbursement

    • The policy outlines guidelines for the use of company vehicles, including maintenance, insurance, and reporting procedures

    • Employees may be required to follow specific rules such as keeping mileage logs or obtaining approval for personal use of company vehicles

  • Answered by AI
  • Q2. What is the NP2 pipe
  • Ans. 

    An NP2 pipe is a type of reinforced concrete pipe commonly used in drainage systems.

    • NP2 pipes are made of reinforced concrete, making them strong and durable.

    • They are commonly used in drainage systems to transport water and sewage.

    • NP2 pipes come in various sizes and lengths to accommodate different project needs.

  • Answered by AI
  • Q3. What is the shuttering factor of per sft total build up area in residential building
  • Ans. 

    The shuttering factor is the percentage of total build up area that is covered by formwork during construction.

    • Shuttering factor is typically around 0.05 to 0.1 for residential buildings.

    • It is used to calculate the quantity of formwork needed for construction.

    • For example, if the total build up area is 1000 sqft and the shuttering factor is 0.1, then 100 sqft of formwork will be required.

  • Answered by AI
  • Q4. What is the BOCW act
  • Ans. 

    The BOCW Act stands for Building and Other Construction Workers Act, which aims to regulate the employment and working conditions of construction workers in India.

    • The BOCW Act was enacted in 1996 to ensure the welfare of construction workers and regulate their working conditions.

    • It requires employers to register construction workers, provide them with safety equipment, and ensure timely payment of wages.

    • The Act also ma...

  • Answered by AI
  • Q5. How much maximum quantity of flyash mix in M25 concrete
  • Ans. 

    The maximum quantity of fly ash in M25 concrete is typically around 25% of the total cementitious material content.

    • Fly ash is commonly used as a partial replacement for cement in concrete mixes to improve workability, durability, and reduce environmental impact.

    • In M25 concrete, the maximum recommended percentage of fly ash is usually around 25% of the total cementitious material content.

    • Using fly ash in concrete mixes ...

  • Answered by AI
  • Q6. What is the difference of pop and gypsum plaster
  • Ans. 

    Pop and gypsum plaster are both types of plaster used in construction, but they have different compositions and properties.

    • Pop (plaster of Paris) is made from gypsum, while gypsum plaster is made from calcium sulfate dihydrate.

    • Pop sets quickly and is commonly used for small repairs and crafts, while gypsum plaster sets more slowly and is used for larger construction projects.

    • Gypsum plaster is more durable and has bette...

  • Answered by AI

Top N B Constructions Contracts Billing Manager Interview Questions and Answers

Q1. what is the shuttering factor of per sft total build up area in residential building
View answer (2)

Contracts Billing Manager Interview Questions asked at other Companies

Q1. what is the shuttering factor of per sft total build up area in residential building
View answer (2)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Maths , econ and construction

Blood Bank Technician Interview Questions asked at other Companies

Q1. What is transfusion medicine?
View answer (1)
Round 1 - One-on-one 

(2 Questions)

  • Q1. What are responsibilities of safety officer
  • Ans. 

    Safety officers are responsible for ensuring the safety of employees and the workplace.

    • Develop and implement safety policies and procedures

    • Conduct safety inspections and audits

    • Train employees on safety practices and procedures

    • Investigate accidents and incidents

    • Maintain safety records and reports

    • Ensure compliance with safety regulations and standards

  • Answered by AI
  • Q2. Height work , hot work

Interview Preparation Tips

Interview preparation tips for other job seekers - Provide best opportunity for freshers & Company economy is very good

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (18)

N B Constructions interview questions for popular designations

 Contracts Billing Manager

 (1)

 Blood Bank Technician

 (1)

 Safety Officer

 (1)

 Site Engineer

 (1)

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All the questions were relevant to my domain knowledge.

Interview Preparation Tips

Interview preparation tips for other job seekers - Gather some good knowledge about the company before appearing for the interview and answer confidently whatever is known.
The rest is in the hands of the interviewer.

I applied via Referral and was interviewed in Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. MPLS, OSPF, BGP, ISIS

Interview Preparation Tips

Interview preparation tips for other job seekers - Never fake

I applied via Naukri.com and was interviewed in Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How to integrate the sites or the integration steps?
  • Ans. 

    Integration of sites involves identifying the systems to be integrated, defining the data flow, and implementing the integration process.

    • Identify the systems to be integrated

    • Define the data flow between the systems

    • Choose the appropriate integration method (API, ETL, etc.)

    • Develop and test the integration process

    • Deploy the integration process and monitor for errors

    • Ensure data security and compliance

    • Provide ongoing suppor

  • Answered by AI
  • Q2. What vlan?
  • Ans. 

    VLAN stands for Virtual Local Area Network and is used to logically separate a network into smaller segments.

    • VLANs are used to improve network performance and security.

    • They allow for better network management and easier troubleshooting.

    • VLANs can be configured on switches and routers.

    • Examples of VLANs include separating guest and employee networks or separating different departments within a company.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Listen carefully to interviwer & tell the answers with confidently.

Skills evaluated in this interview

Interview Preparation Tips

Round: Test
Experience: CAT-type data interpretation test.30 questions in 35 minutes.Fast graph interpretation and quick calculations.
Tips: CAT preparation will help.
Duration: 35 minutes
Total Questions: 30

Round: Case Study Interview
Experience: A simple case, based on the credit card industry or any other field, is given. Cases lay more focus on quantitative skills apart from the focus on asking the right questions.There is a shortlist made after each case round.
Tips:  Fast calculation and insight into what data may be required to solve the case are essential.Practice the cases given on their website and at www.beprepared.in.

Round: Behavorial Interview
Experience: Questions are asked based on incidents- give examples of instances when you led a team successfully or when you had to go against your team, etc.
Tips:  Practice HR questions from HLPQ.

General Tips: Positions Of Responsibility (PORs) are required but not mandatory. They are of secondary importance if one has scored well in the exam. A good CV with good internships/projects will help one to get shortlisted.
Skill Tips: "Student needs to be quick with simple percentage calculations."
Skills: Basic Quantitative skills
College Name: IIT Kharagpur

Interview Preparation Tips

Round: Test
Experience: Written Test ( DI questions, each involving 2-3 plots)

Round: Interview
Experience: Started with a “Tell me something about your-self question”. I believe it was just to set the ball rolling and was not evaluated. The interviewer then gave me a case question wherein I had to make a choice between a diesel and a petrol car. There were 3 parts to the question (some candidates were asked 1 / 2 as well). The first dealt with finding the breakeven point given the basic set of cost, fuel price and fuel consumption data. Next was to find breakeven considering the money was acquired at a certain rate of interest (bond/loan). Both these results involved basic calculation and I was comfortable with them. The final part was about calculating the breakeven, again, but this time considering depreciation. This is where I was caught off guard and though I did turn up with a figure, the interviewer was not completely satisfied.

General Tips: Do get a basic background of the firm and also about terms in the related field.
Skill Tips: I was not hesitant and was reasonably confident while answering. What went wrong was perhaps the fact that I was caught unaware of how depreciation works and how it had to be included in the equation. I fumbled a lot with the equation and puzzled as to where to include terms for depreciation etc.
College Name: IIT KANPUR

Interview Preparation Tips

Round: Test
Experience: There was test which was purely data analysis and calculator was allowed. So the procedure that they follow is that first they shortlist 50 people and a small case interview is followed. The case I was asked was to calculate the change in the cost of a grocery store if it has changed its model from cash on delivery with a physical store to an online portal which has cash on delivery option. As I had practiced it already I took some time to give structure and then gave 3-4 reasons for change in cost and then he gave me some numbers based on which I had to calculate the break even time period or amount . But I think he expected a little bit different approach or was searching for a different solution as I wasn't selected for the final interview sessions. I think 22 people were selected for the final interview session out of which 2 people were finally selected in Cap One.

College Name: IIT KANPUR

N B Constructions Interview FAQs

How many rounds are there in N B Constructions interview?
N B Constructions interview process usually has 1 rounds. The most common rounds in the N B Constructions interview process are One-on-one Round and Aptitude Test.
What are the top questions asked in N B Constructions interview?

Some of the top questions asked at the N B Constructions interview -

  1. what is the shuttering factor of per sft total build up area in residential bui...read more
  2. how much maximum quantity of flyash mix in M25 concr...read more
  3. What are responsibilities of safety offi...read more

Tell us how to improve this page.

N B Constructions Interview Process

based on 9 interviews

Interview experience

4.1
  
Good
View more

Interview Questions from Similar Companies

AmbitionBox Interview Questions
4.9
 • 153 Interviews
Webdew Interview Questions
4.4
 • 106 Interviews
Data Entry Interview Questions
4.1
 • 98 Interviews
HyScaler Interview Questions
4.5
 • 92 Interviews
CapitalOne Interview Questions
3.7
 • 79 Interviews
3 Minds Digital Interview Questions
4.4
 • 70 Interviews
View all

N B Constructions Reviews and Ratings

based on 26 reviews

3.7/5

Rating in categories

3.1

Skill development

3.5

Work-life balance

3.6

Salary

3.6

Job security

3.2

Company culture

3.3

Promotions

3.2

Work satisfaction

Explore 26 Reviews and Ratings
Site Engineer
7 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Billing Manager
7 salaries
unlock blur

₹7.2 L/yr - ₹11.1 L/yr

Safety Officer
6 salaries
unlock blur

₹2 L/yr - ₹4.8 L/yr

Senior Engineer
5 salaries
unlock blur

₹4.3 L/yr - ₹6.1 L/yr

Civil Site Engineer
5 salaries
unlock blur

₹2 L/yr - ₹4.4 L/yr

Explore more salaries
Compare N B Constructions with

Huawei Technologies

4.0
Compare

Z X Learning

4.4
Compare

Evision Technoserve

4.7
Compare

Cogoport

2.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview