Filter interviews by
I applied via Walk-in and was interviewed in Sep 2021. There were 3 interview rounds.
The amount of cement required for M25 grade of concrete depends on the mix ratio and the volume of concrete needed.
The mix ratio for M25 grade of concrete is 1:1:2 (cement:sand:aggregate)
The volume of concrete needed must be determined first
Assuming a volume of 1 cubic meter, the amount of cement required would be approximately 6-7 bags (depending on the brand and type of cement)
It is important to factor in wastage and...
12.75 square feet is equivalent to 1.18 square meters.
To convert square feet to square meters, divide the area in square feet by 10.764.
12.75 square feet / 10.764 = 1.18 square meters.
Top trending discussions
based on 1 review
Rating in categories
Site Engineer
9
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Engineer
7
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Senior Engineer
7
salaries
| ₹3 L/yr - ₹5.8 L/yr |
Assistant Engineer
4
salaries
| ₹2.3 L/yr - ₹3 L/yr |
Marketing Executive
4
salaries
| ₹2.3 L/yr - ₹2.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd