I applied via Approached by Company and was interviewed in Mar 2024. There were 5 interview rounds.
Managed multiple projects in construction industry, including commercial buildings and infrastructure projects.
Led a team of engineers and contractors to successfully complete a commercial building project within budget and timeline
Managed the construction of a new road infrastructure project, coordinating with various stakeholders and ensuring compliance with regulations
Implemented innovative solutions to overcome cha...
I was interviewed in Jan 2024.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 3 interview rounds.
Multitex Filtration Engineers interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Oct 2022. There were 3 interview rounds.
An inspection test plan is a document outlining the procedures and criteria for inspecting and testing products or processes.
An inspection test plan includes details on what will be inspected, how it will be inspected, and the acceptance criteria.
It helps ensure that products meet quality standards and specifications.
Examples of items in an inspection test plan include inspection checklists, testing methods, and sampli
Top trending discussions
I was interviewed in Nov 2024.
The procedure for wind calculation as per IS code involves determining the design wind speed, selecting the appropriate terrain category, and calculating the wind pressure.
Determine the design wind speed based on the location and height of the structure.
Select the appropriate terrain category (rural, urban, etc.) as per IS code guidelines.
Calculate the wind pressure using the formula provided in the IS code.
Consider fa...
A STAAD model for a fixed pole is a structural analysis and design model used to determine the stability and strength of a pole that is fixed in place.
In a STAAD model for a fixed pole, the pole is typically modeled as a vertical member with fixed supports at the base.
The model considers factors such as wind loads, dead loads, and any other relevant loads that may act on the pole.
The analysis helps in determining the s...
Key considerations in designing a square base plate
Ensure the base plate is large enough to support the load without excessive deflection
Select appropriate material and thickness to meet structural requirements
Consider the connection details for attaching the base plate to the structure
Account for any potential corrosion or environmental factors that may affect the base plate
Include provisions for anchor bolts or other...
I applied via Referral and was interviewed in Dec 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
CPK is a statistical measure used to assess the capability of a process to produce output within specification limits.
CPK is calculated using the formula: CPK = (USL - LSL) / (6 * standard deviation)
A CPK value greater than 1 indicates that the process is capable of producing within specification limits
A CPK value less than 1 indicates that the process may not be capable of consistently producing within specification l
Ra in roughness tester is the average roughness value of the surface profile within a specified sampling length.
Ra is a parameter used to quantify the roughness of a surface.
It is calculated as the arithmetic average of the absolute values of the profile heights over the evaluation length.
Ra provides a measure of the deviation of the surface profile from the mean line.
It is commonly used in industries such as manufactu...
7QC tools are a set of quality control tools used for process improvement and problem-solving in quality management.
Check sheets: Used to collect and analyze data in a systematic way.
Histograms: Used to show frequency distribution of a process.
Pareto charts: Helps identify the most significant factors contributing to a problem.
Cause-and-effect diagrams: Used to identify and analyze potential causes of a problem.
Scatter...
The 8D methodology is a problem-solving approach used in quality management to identify, correct, and prevent recurring problems.
The 8D methodology consists of 8 steps: D0 - Plan, D1 - Team Formation, D2 - Problem Description, D3 - Interim Containment Action, D4 - Root Cause Analysis, D5 - Permanent Corrective Action, D6 - Prevent Recurrence, D7 - Recognize Team Effort, D8 - Closure and Team Disbandment
It is commonly u...
posted on 11 Jan 2025
Interview experience
based on 98 reviews
Rating in categories
Production Engineer
20
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Senior Engineer
14
salaries
| ₹5 L/yr - ₹16.9 L/yr |
Draughtsman Mechanical
13
salaries
| ₹3.6 L/yr - ₹6.3 L/yr |
Assistant Engineer
13
salaries
| ₹1.6 L/yr - ₹3.2 L/yr |
Assistant Manager
12
salaries
| ₹5.5 L/yr - ₹10.8 L/yr |
Thermax Limited
Forbes Marshall
Kirloskar Brothers
Praj Industries