I applied via Referral and was interviewed in May 2022. There were 4 interview rounds.
I applied via Job Portal and was interviewed before Jun 2022. There were 4 interview rounds.
They conduct the test 2type of Category papers .One is Basic Aptitude Questions.Next paper is They given some critical Scenario type , How to you handle that Situation .
They given any topic on the spot . You will ready to spoke about that topic.
I applied via Company Website and was interviewed in Aug 2021. There were 4 interview rounds.
I applied via Referral and was interviewed before Nov 2020. There were 4 interview rounds.
posted on 19 Apr 2024
Don't join in this group
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
posted on 10 Jun 2024
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality produ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining th...
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross-trai...
posted on 10 Apr 2024
Assistant Engineer
906
salaries
| ₹1.1 L/yr - ₹5.5 L/yr |
Engineer
671
salaries
| ₹1.5 L/yr - ₹7 L/yr |
Assistant Manager
597
salaries
| ₹4 L/yr - ₹13.2 L/yr |
Senior Engineer
544
salaries
| ₹2.4 L/yr - ₹9.5 L/yr |
Production Engineer
501
salaries
| ₹1 L/yr - ₹6 L/yr |
Bharat Forge
Tata Motors
Mahindra & Mahindra
TVS Motor