posted on 25 Oct 2017
I appeared for an interview before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
posted on 15 Nov 2020
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
The duration and machinery requirement for dumping and compacting one lakh cum of soil.
The duration depends on the capacity of the machinery and the number of machines used.
The type of soil and the site conditions also affect the duration.
On average, it takes around 30-45 days to complete the task.
The machinery required includes excavators, bulldozers, dump trucks, and compactors.
Minor bridges are usually shorter and have a lower weight capacity than major bridges.
Major bridges are typically longer and have a higher weight capacity than minor bridges.
Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.
Major bridges may require more maintenance and have a higher construction cost than minor bridges.
Examples of major bridges i...
I applied via Naukri.com and was interviewed in Dec 2018. There were 3 interview rounds.
I have 5 years of experience in retail management, overseeing daily operations and leading a team of 15 employees.
Managed daily operations of a retail store
Led a team of 15 employees, providing training and guidance
Implemented strategies to increase sales and improve customer satisfaction
Handled inventory management and merchandising
Responsible for scheduling and performance evaluations
I am drawn to the company's commitment to employee development and growth opportunities.
I appreciate the company's focus on continuous learning and development
I value the opportunities for advancement within the organization
I admire the company culture and values that align with my own
I have had positive experiences with the company's products/services
I managed a project to implement a new customer relationship management system.
Led a team of 10 employees to successfully implement the CRM system
Created project timelines and milestones to ensure timely completion
Collaborated with IT department to customize the system to meet company's needs
My final year project was a research study on the impact of social media on consumer behavior.
Researched various social media platforms and their influence on consumer decision-making
Conducted surveys and interviews to gather data on consumer preferences and behaviors
Analyzed the data using statistical tools and presented findings in a comprehensive report
Suggested recommendations for businesses to leverage social medi
I applied via Referral and was interviewed before Jan 2021. There were 4 interview rounds.
I have given aptitude test which has 30 questions
I applied via Approached by Company and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
3 tests are conducted
DCS is used for continuous processes while PLC is used for discrete processes.
DCS stands for Distributed Control System and is used for continuous processes like oil refining, power generation, etc.
PLC stands for Programmable Logic Controller and is used for discrete processes like assembly lines, packaging machines, etc.
DCS is designed to handle large amounts of data from multiple sources and control multiple processe...
Control valves regulate fluid flow by adjusting the size of the valve opening.
Control valves are used in various industries such as oil and gas, chemical, and power generation.
They work by adjusting the size of the valve opening to regulate the flow of fluid.
The valve opening is controlled by a signal from a controller, which can be manual or automated.
Control valves can be classified into different types such as globe...
A pressure switch is a device that monitors pressure levels and triggers an action when a certain pressure is reached.
Pressure switch consists of a sensing element, switch mechanism, and a pressure port.
When the pressure reaches a certain level, the sensing element triggers the switch mechanism to open or close an electrical circuit.
Pressure switches are used in various applications such as HVAC systems, water pumps, a
posted on 13 Mar 2024
My personal Profile, working knowledge,
My nature, behavior, honesty, simplicity, connecting people, positive attitude, relationship with other, communications, adjustment, negotiation, working Exposure,time management.
based on 1 interview
Interview experience
based on 21 reviews
Rating in categories
Civil Site Engineer
18
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
Senior Engineer
7
salaries
| ₹4.2 L/yr - ₹8.1 L/yr |
Site Engineer
6
salaries
| ₹2.8 L/yr - ₹3 L/yr |
Surveyor
5
salaries
| ₹3.6 L/yr - ₹4.2 L/yr |
Project Manager
4
salaries
| ₹24 L/yr - ₹24 L/yr |
GMR Group
Adani Infra
Reliance Infrastructure
Tata Projects