Upload Button Icon Add office photos

Micron Electricals

Compare button icon Compare button icon Compare

Filter interviews by

Micron Electricals Sr.Electrical Project Engineer Interview Questions and Answers

Updated 17 Sep 2024

Micron Electricals Sr.Electrical Project Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

Project planning, Safety precaution in Site. Organization of Daily & weekly Meeting with Clients.

Round 2 - HR 

(6 Questions)

  • Q1. Work Performance , Technical , Knowledge of work experience,
  • Q2. Electrical Projects Related Working Refer to As Built Drawings for Final approval,BOQ materials, arrange the Manpower, Group Discussion with Client & Contractors, Quantity Servay, Billing process, Running...
  • Q3. 25 KVA To 200KVA Transfer Yard Installation work Experience.
  • Ans. 

    I have extensive experience in the installation of transfer yards ranging from 25 KVA to 200KVA.

    • Managed the installation of transfer yards for various projects, ensuring proper sizing and configuration of equipment

    • Coordinated with vendors and contractors to procure necessary materials and ensure timely completion of the project

    • Performed site inspections and quality checks to ensure compliance with safety standards and ...

  • Answered by AI
  • Q4. HT & LT Cable Laying, Testing & Commissioning Working for Trunch, Tunnel, Substation & Transformer Yard Work.
  • Q5. 25 KVA To 200KVA Transformer Yard Installation & Testing , Commissioning work.
  • Q6. HT & LY Cable Laying for Substitution to Trunch, Tunnel, Transformer yard work.

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear/ Madam.
This is my Eighteen Years Experience of Working Knowledge Electrical Project Work.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What is the Steel margin
  • Ans. 

    Steel margin refers to the difference between the cost of producing steel and the selling price.

    • Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.

    • It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.

    • Factors that can impact the steel margin include fluctuations in ...

  • Answered by AI
  • Q2. What is the persentage of Aggregate in Gradiation test
  • Ans. 

    The percentage of aggregate in gradation test varies depending on the specific requirements of the project.

    • The percentage of aggregate in gradation test is typically determined by the specifications provided for the project

    • It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix

    • For example, in a concrete mix design, the percentage of coarse aggregate ma...

  • Answered by AI
  • Q3. Project manager role at site
  • Ans. 

    The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.

    • Responsible for planning, organizing, and directing project activities

    • Ensuring project goals are met within budget and timeline

    • Managing resources and stakeholders effectively

    • Problem-solving and decision-making skills are essential

    • Strong communication and leadership skills are necessary

  • Answered by AI
  • Q4. What is the overall cost in project in role of RCC
  • Ans. 

    The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.

    • Calculate the cost of materials such as cement, aggregates, and reinforcement bars.

    • Consider the cost of labor for construction and installation of RCC components.

    • Include any additional costs such as equipment rental, transportation, and overhead expenses.

    • Factor in the cost of quality control me...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Mot Satisfaction job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of W. T. P
  • Ans. 

    The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.

    • 1. Coagulation: Adding chemicals to water to make particles clump together.

    • 2. Sedimentation: Allowing the clumped particles to settle at the bottom.

    • 3. Filtration: Passing water through filters to remove remaining particles.

    • 4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.

    • 5. Distribution: ...

  • Answered by AI
  • Q2. About safety precautions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is SFRA test on power transformer?
  • Ans. 

    SFRA test is a diagnostic test performed on power transformers to assess their mechanical and electrical integrity.

    • SFRA stands for Sweep Frequency Response Analysis.

    • It is a non-intrusive test that measures the frequency response of a transformer to a swept sinusoidal input signal.

    • The test helps in identifying mechanical and electrical faults in the transformer windings.

    • SFRA test results can be compared with baseline me...

  • Answered by AI
Round 1 - Technical 

(2 Questions)

  • Q1. Which grade of concrete normal use for rcc
  • Ans. 

    The grade of concrete normally used for RCC is M20.

    • The grade of concrete for RCC (Reinforced Cement Concrete) is determined based on the design requirements and structural considerations.

    • The most commonly used grade of concrete for RCC is M20, which means the concrete mix has a compressive strength of 20 megapascals (MPa) after 28 days of curing.

    • Other grades of concrete like M25, M30, M35, etc., can also be used depend...

  • Answered by AI
  • Q2. What are the pre initiative action for start pilling
  • Ans. 

    Pre-initiative actions for start piling

    • Conduct a geotechnical investigation to assess soil conditions

    • Obtain necessary permits and approvals from local authorities

    • Develop a detailed piling plan and schedule

    • Procure required piling equipment and materials

    • Ensure safety measures are in place for workers and surrounding areas

    • Prepare the site by clearing any obstacles or debris

    • Establish proper communication channels with stak...

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. What is the duration for deshuttering a beam of span 4 mtr
  • Ans. 

    The duration for deshuttering a beam of span 4 mtr depends on various factors.

    • The type of formwork used for shuttering the beam

    • The strength of the concrete used

    • The ambient temperature and humidity

    • The curing process followed

    • The complexity of the beam design

    • The availability of manpower and equipment

    • Typically, deshuttering can take anywhere from 7 to 21 days for a beam of span 4 mtr

  • Answered by AI
  • Q2. What is the procedure to define one way and two way slab.How you will fix the reinforcement for two way slab
  • Ans. 

    To define one way and two way slab, we follow different procedures. For two way slab, reinforcement is fixed in both directions.

    • One way slab is defined as the slab in which the ratio of longer span to shorter span is greater than or equal to 2.

    • Two way slab is defined as the slab in which the ratio of longer span to shorter span is less than 2.

    • For two way slab, reinforcement is fixed in both directions to distribute the...

  • Answered by AI
  • Q3. Longer span/ shorter span less than or equal to 2 is called one way slab,more than 2 is called two way slab.In one way slab main bar placeing should be shorter detection & two way slab main bar should be...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.listen all the question carefully before you give the answer.If you don't know the exact answer say sorry.

I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Sewerage System - Design Standards
  • Ans. 

    Design standards for sewerage system

    • Design standards vary based on location and regulations

    • Consideration should be given to factors such as population density, topography, and soil type

    • Standards may include minimum pipe diameter, slope, and depth

    • Examples of design standards include ASCE 15 and EPA guidelines

  • Answered by AI
  • Q2. Load distribution method

Interview Preparation Tips

Interview preparation tips for other job seekers - Hydraulic Design of sewerage & drainage system.
Longitudinal section of Hydraulic line
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About the Projects
  • Q2. Project Planning

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Hi this sudhir here a diploma holder in civil high rise building construction .I know the grade of concrete for building construction and finishing work knowledge also I have.

Round 3 - Technical 

(2 Questions)

  • Q1. Why we mix addmixture in concrete
  • Ans. 

    Admixtures are added to concrete to improve its properties and performance.

    • Admixtures enhance the workability and durability of concrete.

    • They can reduce the water content required for a given slump, making the concrete more cohesive.

    • Admixtures can accelerate or retard the setting time of concrete.

    • They improve the strength, durability, and resistance to chemical attack of concrete.

    • Examples of admixtures include water re...

  • Answered by AI
  • Q2. What is M25 cube strangth
  • Ans. 

    M25 cube strength refers to the compressive strength of concrete with a mix ratio of 1:1:2.

    • M25 cube strength is a measure of the ability of concrete to withstand compression.

    • It is denoted by the characteristic strength of a concrete cube tested at 28 days.

    • M25 grade concrete has a mix ratio of 1:1:2 (cement:sand:aggregate).

    • The cube strength of M25 concrete is typically around 25 MPa or 3625 psi.

    • It is important for struc...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work hard.complete. the projects as per company requirements and also give the positive input to the company .minimum loss for company complete the projects

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

11 Questions

  • Q1. How many years of experience?
  • Q2. Total experience about Water Supply Project out of 13years
  • Q3. Do you work in Consultancy firm & ask about of company ?
  • Ans. Yes, like Wapcos Ltd, LN Malviya infra & and described my roll
  • Answered Anonymously
  • Q4. Asked about inspection that how to check quality of work ?
  • Ans. During inspection of work check quality of material like cement, sand, aggregate, bricks, tmt steel bar, etc. as per IS codes/spec. Quality in Struct
  • Answered Anonymously
  • Q5. If contractors not compliance spec. Then what do you want or take action against.
  • Ans. 

    Take appropriate action against contractors not complying with specifications.

    • Identify the specific non-compliance issues

    • Communicate the non-compliance to the contractors

    • Request corrective actions or modifications to meet the specifications

    • Monitor and document the progress of corrective actions

    • Consider penalties or contract termination if non-compliance persists

  • Answered by AI
  • Q6. Asked about NCR full form
  • Ans. Non conformance Report or Non conformity reports
  • Answered Anonymously
  • Q7. Asked describe about NCR
  • Ans. A non-conformance report, non-conformity report or NCR, is a design and construction-related document that addresses issues where there has been a deviation from the project specification or where work fails to meet agreed quality standards
  • Answered Anonymously
  • Q8. Asked about preparation of financial & physical progress
  • Ans. Financial progress is certified amount which is taken from certified RA Bills . Physical progress is in ongoing progress of the project work which is taken from certified RA Bills qty. & running or ongoing qty.
  • Answered Anonymously
  • Q9. What is your CURRENT CTC & expected? Asked by HR.
  • Ans. Replied my ctc & want 30%hike
  • Answered Anonymously
  • Q10. Asked about working location
  • Q11. Asked about corrent CTC & expected
  • Ans. CTC +30%hike.then finally I have selected.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain about really experience which you have got & study about relevant IS codes & technical specifications.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Say about your any great achievement during your previous constitution professional experience & what was affort made by you?
  • Q2. Why you think that you are suitable for this position?
  • Q3. Your further most carrier goals?
  • Ans. 

    My further most career goal is to become a director of project management.

    • To gain experience in managing large-scale projects

    • To develop leadership and communication skills

    • To build a strong network of industry professionals

    • To continuously learn and stay updated with industry trends

    • To achieve PMP certification

    • To work towards becoming a subject matter expert in project management

    • To mentor and train junior project managers

    • ...

  • Answered by AI

Micron Electricals Interview FAQs

How many rounds are there in Micron Electricals Sr.Electrical Project Engineer interview?
Micron Electricals interview process usually has 2 rounds. The most common rounds in the Micron Electricals interview process are Assignment and HR.
What are the top questions asked in Micron Electricals Sr.Electrical Project Engineer interview?

Some of the top questions asked at the Micron Electricals Sr.Electrical Project Engineer interview -

  1. 25 KVA To 200KVA Transfer Yard Installation work Experien...read more
  2. Electrical Projects Related Working Refer to As Built Drawings for Final appro...read more
  3. HT & LT Cable Laying, Testing & Commissioning Working for Trunch, Tunnel, Subst...read more

Tell us how to improve this page.

Micron Electricals Sr.Electrical Project Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 429 Interviews
ABB Interview Questions
4.1
 • 231 Interviews
Havells Interview Questions
4.0
 • 208 Interviews
Bajaj Electricals Interview Questions
4.0
 • 123 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
Bechtel Interview Questions
4.0
 • 69 Interviews
View all
Micron Electricals Sr.Electrical Project Engineer Salary
based on 5 salaries
₹4.8 L/yr - ₹12.8 L/yr
At par with the average Sr.Electrical Project Engineer Salary in India
View more details
Assistant Engineer
127 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Project Engineer
95 salaries
unlock blur

₹2 L/yr - ₹6.6 L/yr

Electrical Engineer
95 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Electrical Site Engineer
91 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Site Engineer
85 salaries
unlock blur

₹1.8 L/yr - ₹5 L/yr

Explore more salaries
Compare Micron Electricals with

Siemens

4.1
Compare

ABB

4.1
Compare

Schneider Electric

4.1
Compare

Havells

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview