Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
Organisations should offer competitive packages and clear expectations to attract and retain top talent.
Competitive salary and benefits packages are important to attract and retain top talent.
Clear expectations and goals should be communicated to employees to ensure they understand their role and responsibilities.
Opportunities for growth and development should be provided to encourage employees to stay with the organis...
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 2 interview rounds.
Forging, CNC, and VMC processes are undergoing new developments.
New technologies are being introduced to improve efficiency and precision.
Advanced software is being used to optimize the processes.
Automation is being implemented to reduce manual labor and increase productivity.
Examples include the use of 3D printing in forging and the integration of AI in CNC and VMC processes.
posted on 11 Nov 2024
I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
Questions on JD and education
I have used various types of forging techniques in my career as a Senior Manager.
I have experience with open die forging, where the metal is heated and shaped between flat dies.
I have also worked with closed die forging, which involves shaping the metal within a set of dies to achieve the desired form.
I am familiar with impression die forging, where the metal is shaped by the use of dies that contain the desired shape ...
posted on 12 Jan 2023
I applied via Naukri.com and was interviewed before Jan 2022. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The critical process in connecting rod is the assembly and alignment of the rod and cap.
The connecting rod is a crucial component in an engine that connects the piston to the crankshaft.
The critical process involves ensuring proper alignment and fitment of the rod and cap to prevent any misalignment or failure.
This process typically includes checking for proper torque specifications, aligning the bearing surfaces, and ...
5S is a workplace organization method and OEE is a measure of manufacturing productivity.
5S is a systematic approach to organizing and maintaining a clean, efficient, and safe workplace.
It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.
5S helps improve productivity, safety, and quality by eliminating waste and creating a more organized work environment.
OEE (Overall Equipment Efficiency) is a m...
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 3 interview rounds.
based on 2 reviews
Rating in categories
Quality Engineer
17
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Production Supervisor
14
salaries
| ₹2.9 L/yr - ₹4.1 L/yr |
Design Engineer
12
salaries
| ₹2.3 L/yr - ₹4.5 L/yr |
Supervisor
11
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Deputy Manager
9
salaries
| ₹6 L/yr - ₹10.1 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
Victora Auto Private Limited