Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
Organisations should offer competitive packages and clear expectations to attract and retain top talent.
Competitive salary and benefits packages are important to attract and retain top talent.
Clear expectations and goals should be communicated to employees to ensure they understand their role and responsibilities.
Opportunities for growth and development should be provided to encourage employees to stay with the organis...
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 2 interview rounds.
Forging, CNC, and VMC processes are undergoing new developments.
New technologies are being introduced to improve efficiency and precision.
Advanced software is being used to optimize the processes.
Automation is being implemented to reduce manual labor and increase productivity.
Examples include the use of 3D printing in forging and the integration of AI in CNC and VMC processes.
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
Questions on JD and education
posted on 11 Nov 2024
I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.
I have used various types of forging techniques in my career as a Senior Manager.
I have experience with open die forging, where the metal is heated and shaped between flat dies.
I have also worked with closed die forging, which involves shaping the metal within a set of dies to achieve the desired form.
I am familiar with impression die forging, where the metal is shaped by the use of dies that contain the desired shape ...
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The critical process in connecting rod is the assembly and alignment of the rod and cap.
The connecting rod is a crucial component in an engine that connects the piston to the crankshaft.
The critical process involves ensuring proper alignment and fitment of the rod and cap to prevent any misalignment or failure.
This process typically includes checking for proper torque specifications, aligning the bearing surfaces, and ...
5S is a workplace organization method and OEE is a measure of manufacturing productivity.
5S is a systematic approach to organizing and maintaining a clean, efficient, and safe workplace.
It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.
5S helps improve productivity, safety, and quality by eliminating waste and creating a more organized work environment.
OEE (Overall Equipment Efficiency) is a m...
posted on 12 Jan 2023
I applied via Naukri.com and was interviewed before Jan 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
based on 2 reviews
Rating in categories
Quality Engineer
17
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Production Supervisor
14
salaries
| ₹2.9 L/yr - ₹4.1 L/yr |
Design Engineer
12
salaries
| ₹2.3 L/yr - ₹4.5 L/yr |
Supervisor
11
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Deputy Manager
9
salaries
| ₹6 L/yr - ₹10.1 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
Victora Auto Private Limited