Upload Button Icon Add office photos

Filter interviews by

Metal Tech Constructions Interview Questions and Answers

Updated 17 Jun 2022

Metal Tech Constructions Interview Experiences

1 interview found

steel structural detailler Interview Questions & Answers

user image Anonymous

posted on 17 Jun 2022

I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Structural Detailing & fabrication

Interview Preparation Tips

Topics to prepare for Metal Tech Constructions steel structural detailler interview:
  • Construction
Interview preparation tips for other job seekers - Metal Tech construction. Company is Best company

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Why you are applying for this job?
  • Ans. 

    I am applying for this job because of my passion for managing civil projects and my proven track record of successful project completions.

    • Passion for managing civil projects

    • Proven track record of successful project completions

    • Excited about the opportunity to contribute to impactful infrastructure projects

  • Answered by AI
  • Q2. Why you requested for salary hike?
  • Ans. 

    I requested a salary hike due to increased responsibilities, achievements, and market value.

    • Increased responsibilities in current role

    • Achievements such as successful completion of projects or exceeding targets

    • Market value based on industry standards and experience

    • Cost of living increase or inflation affecting expenses

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Explain about the various stages of construction of the foundation of building.
  • Ans. 

    The various stages of construction of the foundation of a building include site preparation, excavation, foundation design, footing construction, and foundation pouring.

    • Site preparation involves clearing the area and leveling the ground for construction.

    • Excavation is the process of digging a hole in the ground to create space for the foundation.

    • Foundation design is crucial to ensure the building's stability and load-be...

  • Answered by AI
  • Q2. What will be the Design mix for Concrete .
  • Ans. 

    The design mix for concrete is the proportion of various ingredients like cement, sand, aggregates, and water to achieve the desired strength and durability.

    • Design mix is determined based on the required strength and durability of the concrete

    • It involves selecting the right proportions of cement, sand, aggregates, and water

    • Various factors like type of construction, exposure conditions, and desired workability influence...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Very nicely & strictly selected

Round 2 - One-on-one 

(2 Questions)

  • Q1. About my job professiinal
  • Q2. Details about work profile
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Automation related questions basic of PLC like AB and Siemens make plc,encoder,pannel min earthing voltage, scada,starter software
  • Q2. Electrical maintenance related questions basics
  • Q3. What Is MTTR and MTBF
  • Ans. 

    MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.

    • MTTR is the average time taken to repair a failed component or system.

    • MTBF is the average time between failures of a component or system.

    • MTTR is calculated as total downtime divided by the number of failures.

    • MTBF is calculated as total uptime divided by the number of failures.

    • For example, if a system has an MTTR of 2 hours and an MTBF of...

  • Answered by AI
  • Q4. Substation related questions basics
  • Q5. What is data type,string in plc
  • Ans. 

    Data type string in PLC is used to store alphanumeric characters or text data.

    • String data type is used to store text data in PLC programming.

    • Strings can be used to store alphanumeric characters, words, sentences, etc.

    • Example: STRING name := 'John Smith';

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Tell mi about your self
  • Q2. Technical questions
  • Q3. General knowledge questions

Yes Interview Questions & Answers

Hindustan Gold Industries user image Anonymous

posted on 24 May 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website

Round 1 - Technical 

(1 Question)

  • Q1. The lawyer opened with a legal arguement over a technically
  • Ans. The lawyer opened with a legal arguement over a technical point
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Hindustan Gold Industries Yes interview:
  • Electronics
Interview preparation tips for other job seekers - Controlling all activities pertaining to Production in Shop Floor.
Controlling and handling lean manufacturing process like 5s,
kaizen, POKA YOKE, KPI, Root Cause Analysis and OEE.
Overall responsible for Production Planning & Manpower planning
and Audits.
Communication with PPC team with respect to Production order
and RM.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Sahre your views on job.
  • Q2. Technical knowledge about mineral plants
  • Q3. Legal subjects and authority handling

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Operation excellence.
2. Legal.
3. Maintenance knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

2 hours of psychometric test including English test

Round 2 - Technical 

(2 Questions)

  • Q1. Scenario based interview
  • Q2. Asked about codes, standards
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. My self Navdeep Chahal. I'm working in Oswal castings pvt. Ltd as a engineer in business excellence. My responsibility to manage company all over safety, 5S, improvement through kaizen. Provide training to...
  • Ans. Better results related to safety management.
  • Answered Anonymously
Round 2 - Assignment 

Creating and updating of safety manuals, SOPs, WIs, OPLs, records for effective awareness in shop floor Safety

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. What's your experience

Metal Tech Constructions Interview FAQs

How many rounds are there in Metal Tech Constructions interview?
Metal Tech Constructions interview process usually has 2 rounds. The most common rounds in the Metal Tech Constructions interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

People are getting interviews through

based on 1 Metal Tech Constructions interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Nava Limited Interview Questions
3.8
 • 18 Interviews
NLMK India Interview Questions
3.6
 • 16 Interviews
Imerys Interview Questions
4.0
 • 9 Interviews
Nagata India Interview Questions
4.1
 • 9 Interviews
View all

Metal Tech Constructions Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Compare Metal Tech Constructions with

African Industries

4.1
Compare

Nava Limited

3.8
Compare

Nagata India

4.1
Compare

Knest Manufacturers

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview