Filter interviews by
Top trending discussions
I applied via Campus Placement and was interviewed in Feb 2024. There was 1 interview round.
Short term goals are achievable within a few months to a year, while long term goals take several years to accomplish.
Short term goals are specific, measurable, achievable, relevant, and time-bound (SMART).
Long term goals are broader and more visionary, often requiring multiple steps to achieve.
Short term goals can include completing a project, gaining a new skill, or securing a promotion.
Long term goals may involve ca...
I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
Shree Cement is a leading cement manufacturer known for its innovation, sustainability, and strong financial performance.
Shree Cement has a reputation for innovation in the cement industry, constantly investing in new technologies and processes.
The company is committed to sustainability, with a focus on reducing its carbon footprint and promoting environmental conservation.
Shree Cement has a track record of strong fina...
Shree Cement is a leading cement manufacturer known for its innovation, sustainability, and strong financial performance.
Shree Cement has a reputation for innovation in the cement industry, constantly investing in new technologies and processes.
The company is committed to sustainability, with a focus on reducing carbon emissions and promoting eco-friendly practices.
Shree Cement has a strong financial performance, consi...
Nice, but I given less efforts for that
Cement process involves mixing raw materials, heating them to a high temperature, and grinding the resulting clinker into a fine powder.
Raw materials such as limestone, clay, and sand are crushed and blended in proper proportions.
The mixture is heated in a rotary kiln at high temperatures to form clinker.
The clinker is then ground with a small amount of gypsum to produce cement.
The cement is packed in bags or shipped i
I applied via LinkedIn and was interviewed before Oct 2023. There were 2 interview rounds.
Asked the subject related questions
I am impressed by your company's innovative approach and strong reputation in the industry.
I admire the company's commitment to innovation and cutting-edge technology.
I am drawn to the company's strong reputation in the industry and its track record of success.
I believe that the company's values align with my own professional goals and aspirations.
I have 2 years of experience in marketing and 1 year in customer service.
2 years in marketing
1 year in customer service
I applied via Referral and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Apr 2021. There were 2 interview rounds.
Technical round regarding ur subject
posted on 3 Jul 2023
I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.
posted on 22 Dec 2024
I applied via Campus Placement and was interviewed in Nov 2024. There were 2 interview rounds.
Raw material is the basic material used in the production of goods.
Raw material is the primary substance or component used to manufacture products.
It can be natural resources like wood, metal, or minerals.
It can also be processed materials like chemicals or plastics.
Raw materials are transformed into finished products through manufacturing processes.
Clinker is a nodular material produced during the cement manufacturing process.
Clinker is a key ingredient in the production of cement.
It is formed by heating limestone, clay, and other materials in a kiln.
The cooled clinker is then ground into a fine powder to produce cement.
The quality of clinker greatly affects the quality of the final cement product.
Packing plant capacity refers to the maximum amount of products that can be processed and packaged in a plant within a specific time frame.
Packing plant capacity is usually measured in units per hour or units per day.
It is important for production engineers to optimize the packing plant capacity to meet demand and maximize efficiency.
Factors that can affect packing plant capacity include equipment efficiency, productio
Coal mill capacity refers to the maximum amount of coal that can be processed by the mill in a given time period.
Coal mill capacity is typically measured in tons per hour or tons per day.
It is important for production engineers to optimize coal mill capacity to meet production demands.
Factors affecting coal mill capacity include the type of coal, moisture content, and mill design.
Increasing coal mill capacity can invol...
A ball mill is a type of grinder used to grind and blend materials for use in mineral dressing processes, paints, pyrotechnics, ceramics, and selective laser sintering.
Consists of a hollow cylindrical shell rotating about its axis
The axis of the shell may be horizontal or at a small angle to the horizontal
The grinding media is the balls, which may be made of steel, stainless steel, ceramic, or rubber
The inner surface o...
Raw mill is a machine used in cement production to grind raw materials into a fine powder before being used in the kiln.
Raw mill is used in the cement industry to grind raw materials like limestone, clay, and iron ore into a fine powder.
The powdered raw materials are then blended and heated in a kiln to form clinker, which is the intermediate product in cement production.
Common types of raw mills include ball mills, ro...
posted on 13 Nov 2023
I was interviewed in Oct 2023.
I am currently operating various equipment in the plant including boilers, turbines, pumps, and control systems.
Boilers
Turbines
Pumps
Control systems
The main parameter of roller press is the gap between the rollers.
The main parameter of roller press is the gap between the rollers, which determines the size of the material particles after compression.
The gap between the rollers can be adjusted to control the pressure and throughput of the roller press.
Maintaining the optimal gap between the rollers is crucial for efficient operation and desired product quality.
Skew can be controlled by proper alignment of reinforcement bars and using shear reinforcement.
Ensure proper alignment of reinforcement bars during construction.
Use shear reinforcement like stirrups or inclined bars to control skew.
Properly design and detail the structural elements to resist skew forces.
Regular inspection and maintenance to prevent skew from occurring.
Yes, I have operated VRM in previous projects.
Yes, I have experience operating VRM in previous projects.
I am familiar with the functions and capabilities of VRM.
I have successfully utilized VRM to achieve project goals and objectives.
based on 1 interview
Interview experience
Assistant Engineer
74
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Engineer Trainee (Get)
38
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Electrical Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
ACC
UltraTech Cement
Ambuja Cements
Shree Cement