Filter interviews by
A GAS Utility Project involves the planning, construction, and maintenance of gas distribution systems for residential and commercial use.
Involves pipeline installation for natural gas distribution.
Includes safety measures like pressure testing and leak detection.
Requires coordination with local governments for permits.
Example: Upgrading old pipelines to improve safety and efficiency.
Involves GIS technology for ma...
Integrating data from different servers into GIS involves various techniques for data harmonization and interoperability.
Use of APIs to fetch data from remote servers, e.g., RESTful services for real-time data.
Data transformation using ETL (Extract, Transform, Load) processes to standardize formats.
Utilizing GIS software capabilities like ArcGIS or QGIS to merge datasets from different sources.
Implementing spatial...
Branch Version refers to a specific iteration of software or data in GIS, allowing for parallel development and testing.
Branch Versioning allows multiple teams to work on different features simultaneously without conflicts.
For example, in a GIS project, one team can work on updating the road network while another focuses on land use changes.
Branching helps in maintaining a stable main version while new features ar...
Standards for city gas distribution include codes and regulations set by local authorities and industry organizations.
Standards are set by local authorities such as city councils or municipal governments
Industry organizations like the American Gas Association (AGA) also establish guidelines for gas distribution
Codes and regulations cover aspects such as pipeline construction, maintenance, safety measures, and emer...
Laying activity in PE involves the process of laying down pipes or cables in a designated area.
Laying activity requires careful planning and coordination to ensure proper alignment and depth of the pipes or cables.
It involves digging trenches, placing the pipes or cables in the trenches, and covering them with soil or other materials.
Quality control measures such as pressure testing may be conducted to ensure the ...
Compressor is used to increase the pressure of gas while booster is used to increase the pressure of already compressed gas.
Compressor is used to compress gas from low pressure to high pressure.
Booster is used to increase the pressure of already compressed gas.
Compressor is used in various applications like air conditioning, refrigeration, and gas turbines.
Booster is used in applications like pipeline transportati...
Power consumption can be calculated using the formula P = VI, where P is power, V is voltage and I is current.
Determine the voltage and current of the device or system
Multiply the voltage and current to get the power consumption
Consider any efficiency losses in the calculation
Use appropriate units such as watts or kilowatts
Example: A device with a voltage of 120V and current of 2A has a power consumption of 240W
Fire extinguishing methods include water, foam, CO2, dry chemical, and fire blankets. Safety sign boards use color codes like red for fire hazards and yellow for caution.
Fire extinguishing methods: water, foam, CO2, dry chemical, fire blankets
Color codes of Safety sign boards: red for fire hazards, yellow for caution
Lockout/tagout (LOTO) is a safety procedure used to ensure that dangerous machines are properly shut off and not able to be started up again prior to the completion of maintenance or servicing work.
Notify all affected employees that a lockout/tagout system is going to be utilized.
Shut down the equipment using normal stopping procedures.
Isolate the equipment from its energy source(s).
Apply the lockout/tagout device...
My current CTC is $100,000 and my expected CTC is $120,000.
Current CTC: $100,000
Expected CTC: $120,000
posted on 16 Feb 2025
I appeared for an interview in Jan 2025.
I am a Senior Engineer with 10+ years of experience in designing and implementing complex systems.
10+ years of experience in engineering
Expertise in designing and implementing complex systems
Strong problem-solving skills
Leadership experience in guiding and mentoring junior engineers
I appeared for an interview before May 2024, where I was asked the following questions.
A GAS Utility Project involves the planning, construction, and maintenance of gas distribution systems for residential and commercial use.
Involves pipeline installation for natural gas distribution.
Includes safety measures like pressure testing and leak detection.
Requires coordination with local governments for permits.
Example: Upgrading old pipelines to improve safety and efficiency.
Involves GIS technology for mapping...
Integrating data from different servers into GIS involves various techniques for data harmonization and interoperability.
Use of APIs to fetch data from remote servers, e.g., RESTful services for real-time data.
Data transformation using ETL (Extract, Transform, Load) processes to standardize formats.
Utilizing GIS software capabilities like ArcGIS or QGIS to merge datasets from different sources.
Implementing spatial data...
I have completed various GIS development projects, focusing on spatial analysis, data visualization, and application development.
Developed a web-based GIS application for urban planning, integrating real-time data layers.
Created custom geospatial tools using Python and ArcGIS for environmental impact assessments.
Implemented a mobile GIS solution for field data collection, improving data accuracy and efficiency.
Conducte...
Branch Version refers to a specific iteration of software or data in GIS, allowing for parallel development and testing.
Branch Versioning allows multiple teams to work on different features simultaneously without conflicts.
For example, in a GIS project, one team can work on updating the road network while another focuses on land use changes.
Branching helps in maintaining a stable main version while new features are dev...
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
Compressor is used to increase the pressure of gas while booster is used to increase the pressure of already compressed gas.
Compressor is used to compress gas from low pressure to high pressure.
Booster is used to increase the pressure of already compressed gas.
Compressor is used in various applications like air conditioning, refrigeration, and gas turbines.
Booster is used in applications like pipeline transportation of...
Power consumption can be calculated using the formula P = VI, where P is power, V is voltage and I is current.
Determine the voltage and current of the device or system
Multiply the voltage and current to get the power consumption
Consider any efficiency losses in the calculation
Use appropriate units such as watts or kilowatts
Example: A device with a voltage of 120V and current of 2A has a power consumption of 240W
I applied via Company Website and was interviewed in Jul 2022. There were 4 interview rounds.
I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
Lockout/tagout (LOTO) is a safety procedure used to ensure that dangerous machines are properly shut off and not able to be started up again prior to the completion of maintenance or servicing work.
Notify all affected employees that a lockout/tagout system is going to be utilized.
Shut down the equipment using normal stopping procedures.
Isolate the equipment from its energy source(s).
Apply the lockout/tagout device(s) t...
Fire extinguishing methods include water, foam, CO2, dry chemical, and fire blankets. Safety sign boards use color codes like red for fire hazards and yellow for caution.
Fire extinguishing methods: water, foam, CO2, dry chemical, fire blankets
Color codes of Safety sign boards: red for fire hazards, yellow for caution
Top trending discussions
The duration of Megha Gas interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 19 interview experiences
Difficulty level
Duration
based on 108 reviews
Rating in categories
Engineer
56
salaries
| ₹2.9 L/yr - ₹6.5 L/yr |
Store Executive
25
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Senior Engineer
16
salaries
| ₹4 L/yr - ₹8.4 L/yr |
Associate Manager
12
salaries
| ₹7 L/yr - ₹12.3 L/yr |
Safety Engineer
10
salaries
| ₹3.6 L/yr - ₹4.8 L/yr |
TCS
Accenture
Wipro
Cognizant