Filter interviews by
I applied via Company Website and was interviewed in Mar 2023. There were 4 interview rounds.
In the GD we are facing the topic solar energy
I applied via Walk-in and was interviewed in Jun 2020. There were 3 interview rounds.
posted on 2 May 2022
I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio affects the strength and durability of concrete.
Lower water cement ratio results in stronger concrete but may be difficult to work with.
Typical water cement ratio ranges from 0.4 to 0.6 for normal strength concrete.
Excess water can lead to lower strength and durability of concrete.
I applied via Walk-in
Sample interview questions for Site Engineer position
BBS calculation of slab involves calculating the number of steel bars required for the slab based on the design specifications
Staircase riser and tread dimensions are determined based on the height of the floor and the desired slope of the staircase
Types of cement include Ordinary Portland Cement, Rapid Hardening Cement, and Sulphate Resisting Cement
Full form of TMT ...
I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.
Drainage contraction knowledge is essential for a Site Engineer to ensure proper water flow and prevent flooding.
Understanding of drainage systems and their components
Knowledge of local regulations and standards for drainage design
Ability to calculate drainage capacity and slope requirements
Experience in designing and implementing drainage solutions
Familiarity with different types of drainage materials and their proper
posted on 20 Jul 2024
The size of steel used for columns depends on the load it needs to support and the height of the column.
The size of steel columns is typically specified by their dimensions in terms of width, depth, and thickness.
The size of steel columns can also be determined based on the structural design calculations and building codes.
Common sizes for steel columns include W6x9, W8x10, and W10x12, where the first number represents...
Development bars length refers to the length of reinforcement bars used in construction to provide strength and stability.
Development bars length is determined based on structural design requirements.
It is important to follow the specifications provided by the structural engineer.
The length of development bars can vary depending on the type of structure and load requirements.
Proper placement and anchoring of developmen
I applied via Naukri.com and was interviewed in Nov 2021. There were 5 interview rounds.
Working in a tunnel involves various tasks such as planning, excavation, ventilation, and safety measures.
Planning and designing the tunnel layout
Excavating the tunnel using appropriate methods and equipment
Ensuring proper ventilation to maintain air quality
Implementing safety measures to prevent accidents
Monitoring and maintaining the tunnel's structural integrity
Coordinating with other professionals involved in the p...
IS Code refers to Indian Standards Code, which are specifications and guidelines for various engineering practices in India.
IS Code stands for Indian Standards Code.
It is a set of specifications and guidelines for various engineering practices in India.
IS Codes cover a wide range of topics such as construction materials, design criteria, testing methods, safety standards, etc.
These codes are developed and maintained by...
posted on 18 Apr 2022
I applied via Company Website
I have 5 years of experience as a Site Engineer.
I have worked on various construction projects, overseeing the site operations and ensuring adherence to plans and specifications.
During my tenure, I have successfully managed teams, coordinated with subcontractors, and resolved on-site issues.
I am well-versed in interpreting blueprints, conducting quality inspections, and ensuring compliance with safety regulations.
One n...
I applied via Walk-in and was interviewed in Jul 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Accountant
7
salaries
| ₹1.2 L/yr - ₹4.1 L/yr |
Account Assistant
5
salaries
| ₹2.4 L/yr - ₹3 L/yr |
SAP Basis and Solution Manager Consultant
4
salaries
| ₹17 L/yr - ₹21.5 L/yr |
Senior Manager Recruitment
4
salaries
| ₹7.8 L/yr - ₹15 L/yr |
HR Executive
4
salaries
| ₹1.5 L/yr - ₹2.1 L/yr |
Ramky Infrastructure
McNally Bharat Engineering
Consolidated Construction Consortium
SPML Infra