The major hazard faced during plant start up, commissioning and bringing back to operation is equipment failure.
Equipment failure due to improper installation or maintenance
Electrical hazards during commissioning
Chemical leaks or spills during start up
Fire hazards due to ignition sources
Safety hazards due to lack of proper training or procedures
Environmental hazards due to improper waste disposal
Human error during star
Top trending discussions
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
I applied via Company Website and was interviewed before Nov 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
I was interviewed before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
I applied via Recruitment Consultant
I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.
based on 1 review
Rating in categories
Assistant Manager
67
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Thermax Limited
BHEL
Siemens