Filter interviews by
Batch preparation in mixing involves combining raw materials in specific quantities to create a homogeneous mixture.
Ensure accurate measurements of raw materials
Follow a standardized mixing procedure
Monitor mixing time and speed
Check for consistency and uniformity of the mixture
Adjust mixing parameters as needed
Good packing and labeling are essential for efficient production and customer satisfaction.
Ensure proper packaging materials are used to protect products during shipping
Label each package clearly with product information, quantity, and any special instructions
Implement quality control measures to check for accuracy in packing and labeling
Train employees on proper packing and labeling procedures to avoid errors
Maintain ...
Managing manpower in the shift involves assigning tasks, monitoring performance, providing support, and ensuring productivity.
Create a clear schedule and assign tasks based on skills and workload
Monitor performance and provide feedback to improve efficiency
Provide support and guidance to employees to help them succeed
Ensure proper training and resources are available for the team
Address any conflicts or issues that ari...
I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.
ABC Analysis is a method used in inventory management to categorize items based on their importance.
Items are classified into three categories: A (most important), B (moderately important), and C (least important).
The classification is based on criteria such as sales volume, value, or frequency of use.
ABC Analysis helps in prioritizing inventory management efforts and resources.
Example: A items may include high-value p...
Packing standard refers to the guidelines and regulations set for packaging materials and methods to ensure safe and efficient transportation of goods.
Packing standards may include specifications for materials, dimensions, weight limits, labeling, and handling instructions.
Examples of packing standards include ISTA (International Safe Transit Association) standards and ASTM (American Society for Testing and Materials) ...
Capacity planning is the process of determining the amount of resources needed to support a system's current and future demands.
Involves analyzing current usage patterns and predicting future growth
Helps in ensuring that the system can handle expected loads without performance issues
Factors in variables like traffic spikes, seasonal trends, and future expansion plans
Involves allocating resources efficiently to meet dem...
I applied via Referral and was interviewed before Apr 2022. There were 2 interview rounds.
Yes, I am familiar with costing in marketing.
I have experience in creating and managing marketing budgets.
I am skilled in analyzing costs and ROI for marketing campaigns.
I understand the importance of cost control and maximizing marketing spend efficiency.
posted on 15 Feb 2022
I applied via Referral and was interviewed before Feb 2021. There were 3 interview rounds.
Interview questions for Software Engineer position
Project explanation should include details on the project's purpose, scope, and technologies used
SDLC (Software Development Life Cycle) and STLC (Software Testing Life Cycle) are methodologies used in software development and testing respectively
Smoke testing is a type of testing that checks if the basic functionalities of the software are working fine, while Sanity tes...
I appeared for an interview in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes, which is 2 fishes.
To make the red fishes 98%, subtract 1% (2 fishes) from 99% (198 fishes).
To find the number of fishes to be removed, divide the difference by 1% (2 fishes).
Therefore, 50 fishes have to be removed to make the red fishes 98%.
I appeared for an interview in Feb 2017.
I appeared for an interview in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes to find the number of red fishes.
Subtract the number of red fishes from 200 to find the number of non-red fishes.
Calculate 2% of the total number of fishes to find the desired number of red fishes.
Subtract the desired number of red fishes from the current number of red fishes to find the number of fishes to be removed.
posted on 3 May 2017
I appeared for an interview before May 2016.
posted on 28 Jun 2017
I appeared for an interview in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes to find out how many fishes represent 1%.
Multiply the result by 2 to find out how many fishes represent 2%.
Subtract the result from 200 to find out how many fishes represent 98%.
based on 4 interviews
Interview experience
based on 42 reviews
Rating in categories
Production Supervisor
9
salaries
| â‚ą2.5 L/yr - â‚ą3.8 L/yr |
Junior Quality Engineer
7
salaries
| â‚ą1.8 L/yr - â‚ą2.7 L/yr |
Production Manager
7
salaries
| â‚ą8 L/yr - â‚ą14 L/yr |
Quality Engineer
7
salaries
| â‚ą2 L/yr - â‚ą2.9 L/yr |
Purchase Executive
6
salaries
| â‚ą3.6 L/yr - â‚ą4.6 L/yr |
Huawei Technologies
Z X Learning
Cogoport
Lea Associates South Asia