Filter interviews by
Be the first one to contribute and help others!
I applied via LinkedIn and was interviewed in Nov 2024. There were 3 interview rounds.
Logic test and personality test
I am a sustainability consultant with a background in environmental science and experience in implementing sustainable practices.
Background in environmental science
Experience in implementing sustainable practices
Passionate about promoting sustainability in various industries
Passionate about promoting sustainable practices and making a positive impact on the environment.
Passionate about environmental conservation and sustainability
Believe in the importance of implementing sustainable practices in businesses
Excited about the opportunity to help organizations reduce their carbon footprint
Previous experience in sustainability projects or initiatives
I faced a challenge in my previous role when implementing a sustainability program for a large corporation.
Resistance from upper management to allocate resources for sustainability initiatives
Difficulty in engaging employees at all levels to participate in sustainability efforts
Lack of buy-in from stakeholders outside of the organization
Balancing short-term financial goals with long-term sustainability objectives
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 13 Jan 2025
A firewall is a network security system that monitors and controls incoming and outgoing network traffic based on predetermined security rules.
Acts as a barrier between a trusted internal network and untrusted external network
Filters network traffic based on rules set by the administrator
Can be hardware-based or software-based
Examples include Cisco ASA, Palo Alto Networks, and Windows Firewall
posted on 12 Nov 2024
I applied via Recruitment Consulltant
Python program python
I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.
ARUP is a global firm known for innovative and sustainable tunnel design solutions.
ARUP has a strong reputation for delivering high-quality and innovative tunnel projects.
The company has a diverse team of experts with extensive experience in tunnel design.
ARUP prioritizes sustainability and environmental considerations in their designs.
The firm has a global presence, allowing for collaboration on projects worldwide.
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.
Excavation process in the oil and gas industry involves several steps to ensure safe and efficient operations.
The first step in the excavation process is to conduct a thorough site survey to identify potential hazards and determine the best approach for excavation.
Before excavation begins, proper permits and approvals must be obtained from relevant authorities.
Excavation equipment such as excavators, bulldozers, and ba...
posted on 23 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
Electrical Draughtsman
4
salaries
| ₹1.8 L/yr - ₹10.2 L/yr |
Salesforce Developer
4
salaries
| ₹7 L/yr - ₹13.5 L/yr |
Manager
3
salaries
| ₹12.1 L/yr - ₹16.5 L/yr |
Product Development Engineer
3
salaries
| ₹10 L/yr - ₹12.7 L/yr |
SAP Project Manager
3
salaries
| ₹15 L/yr - ₹29 L/yr |
Asian Paints
Pidilite Industries
Berger Paints
Kansai Nerolac Paints