i
Manikaran Power Limited
Filter interviews by
I applied via Campus Placement
Top trending discussions
posted on 7 Feb 2017
I was interviewed before Feb 2016.
I am actively involved in community service and sports.
Volunteer at local food bank
Coach youth soccer team
Participate in charity runs
Attend fitness classes at gym
I want to join NTPC because of its reputation as a leading power company and its commitment to sustainable development.
NTPC is a well-established and respected company in the power sector
I am impressed by NTPC's focus on sustainable development and renewable energy
I believe that working at NTPC will provide me with opportunities for professional growth and development
I am excited about the prospect of contributing to N...
Private companies may prioritize profit over public health and safety.
Private companies may cut corners to save costs
Private companies may not have the same level of accountability as public entities
Public entities are responsible for protecting the health and safety of all citizens, not just those who can afford it
Our company focuses on other industries with higher growth potential.
IT sector is highly competitive and saturated
Other industries have higher growth potential
Our company has expertise in other industries
Diversifying our portfolio reduces risk
posted on 10 Feb 2015
posted on 12 Feb 2021
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
A single line diagram is a simplified representation of a power system.
A single line diagram shows the electrical components of a power system in a simplified manner.
It is used to understand the flow of power and to identify potential problems.
It includes generators, transformers, transmission lines, distribution lines, and loads.
Each component is represented by a symbol and connected by lines to show the flow of power...
Voltage compensation at load centre
Voltage drop occurs in the distribution system due to the resistance of the conductors
Voltage compensation is done to maintain the voltage level at the load center
Methods of voltage compensation include tap changing transformers, voltage regulators, and shunt capacitors
To increase voltage for running tubewell when voltage is low, use a voltage booster or stabilizer.
Use a voltage booster or stabilizer to increase voltage
Check for any loose connections or damaged wires
Ensure the tubewell motor is not overloaded
Consider installing a capacitor bank to improve power factor
Consult with an electrician if necessary
posted on 13 Dec 2020
I applied via Campus Placement and was interviewed before Dec 2019. There were 5 interview rounds.
posted on 20 Jun 2023
I applied via Campus Placement and was interviewed before Jun 2022. There were 3 interview rounds.
Easy to moderate questions . Its generally like 1 question per minute.
posted on 21 Dec 2023
I applied via Campus Placement and was interviewed in Nov 2023. There were 3 interview rounds.
The internship taught me about power systems, including the diagram from GS to consumers, interconnected systems, underground cables, corona discharge, smart power strips, and MCBs.
Learned about the power system diagram from the generation source (GS) to consumers
Understood the concept of interconnected systems and how different power systems are connected
Explored the advantages of underground cables over overhead cabl...
I plan to pursue higher studies in the future to enhance my skills and knowledge. I am open to challenging job opportunities and eager to learn and apply new concepts in the field.
Plan to pursue higher studies to enhance skills and knowledge
Open to challenging job opportunities
Eager to learn and apply new concepts in the field
posted on 1 Feb 2023
I applied via Campus Placement and was interviewed in Jan 2023. There were 3 interview rounds.
Easy . Anybody can answer . Bbjk ghjj ghjjjjkkkk ghjj hhhh ghjj ghhh
posted on 22 Feb 2023
Easy and basic range of questions easly solved.
To increase power generation in India, focus on renewable energy sources, improve transmission infrastructure, promote energy efficiency, and encourage private sector participation.
Invest in renewable energy sources like solar, wind, and hydro power
Upgrade and expand transmission infrastructure to minimize transmission losses
Promote energy efficiency measures in industries, buildings, and appliances
Encourage private se...
Junior Manager
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Business Development Manager
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Business Developer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Power
Tata Power
NTPC
Reliance Power