I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
Operating over load time requires strict adherence to safety protocols and proper communication.
Ensure that the crane is rated for the weight being lifted.
Use load charts to determine the maximum weight capacity for the crane.
Communicate with the signal person to ensure that the load is within safe limits.
Monitor the load and crane movements at all times.
Stop operations immediately if any safety concerns arise.
Checking the first working place involves inspecting the area for potential hazards and ensuring equipment is in proper working order.
Inspect the area for any potential hazards such as power lines, unstable ground, or obstacles
Ensure all equipment is in proper working order before beginning work
Check the weather conditions to ensure safe working conditions
Verify that all necessary safety equipment is available and in g...
Load chart is checked by matching crane configuration with load weight and radius.
Identify crane configuration (boom length, jib length, counterweight, etc.)
Determine load weight and radius
Match crane configuration with load weight and radius on load chart
Ensure crane is within safe working limits
Adjust crane configuration or choose different crane if necessary
The crane loadchart can be set in the display by following these steps:
Identify the crane model and its load chart capacity
Enter the load chart data into the crane's computer system
Verify that the load chart data is accurate and matches the crane's capabilities
Display the load chart on the crane's monitor for easy reference
Update the load chart as necessary based on changes in crane configuration or job requirements