Operating over load time requires strict adherence to safety protocols and proper communication.
Ensure that the crane is rated for the weight being lifted.
Use load charts to determine the maximum weight capacity for the crane.
Communicate with the signal person to ensure that the load is within safe limits.
Monitor the load and crane movements at all times.
Stop operations immediately if any safety concerns arise.
Checking the first working place involves inspecting the area for potential hazards and ensuring equipment is in proper working order.
Inspect the area for any potential hazards such as power lines, unstable ground, or obstacles
Ensure all equipment is in proper working order before beginning work
Check the weather conditions to ensure safe working conditions
Verify that all necessary safety equipment is available and in g...
Load chart is checked by matching crane configuration with load weight and radius.
Identify crane configuration (boom length, jib length, counterweight, etc.)
Determine load weight and radius
Match crane configuration with load weight and radius on load chart
Ensure crane is within safe working limits
Adjust crane configuration or choose different crane if necessary
The crane loadchart can be set in the display by following these steps:
Identify the crane model and its load chart capacity
Enter the load chart data into the crane's computer system
Verify that the load chart data is accurate and matches the crane's capabilities
Display the load chart on the crane's monitor for easy reference
Update the load chart as necessary based on changes in crane configuration or job requirements
Top trending discussions
posted on 31 Mar 2016
I applied via Campus Placement and was interviewed in Mar 2016. There were 2 interview rounds.
posted on 31 May 2022
I applied via Job Fair and was interviewed before May 2021. There were 2 interview rounds.
QUant, aptitude, english all in one hour
It was about the road curves and what kind of material we can use for the long durability of road
posted on 30 May 2024
posted on 28 Mar 2024
posted on 28 Mar 2024
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.
SDLC consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables to ensure the software meets the requirements and quality standards.
Examples of SDLC models include...
CAN protocol is a communication standard used in automotive and industrial applications.
CAN protocol stands for Controller Area Network
It is a message-based protocol used for communication between electronic control units (ECUs)
CAN protocol allows for high-speed communication and real-time data transmission
It is commonly used in automotive applications for functions such as engine control, transmission control, and bod...
I appeared for an interview before Jan 2023.
I appeared for an interview before Mar 2024.
Dsa round was conducted
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Bombardier Transportation
Indira Gandhi International Airport
Indian Railway Catering and Tourism
Hyva