I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.
Rate analysis for plaster involves calculating the cost of materials, labor, and equipment required for plastering a specific area.
Determine the area to be plastered
Calculate the quantity of materials required (cement, sand, water)
Determine the cost of materials per unit
Calculate the cost of labor per unit area
Include the cost of equipment and tools used
Add all costs to get the total cost of plastering
Example: For plas...
BBS is Bar Bending Schedule used for steel reinforcement and BOQ is Bill of Quantities used for building items.
BBS provides details of reinforcement steel required for construction.
BOQ lists all the materials and quantities required for construction.
BBS is used for steel reinforcement in structures like columns, beams, slabs, etc.
BOQ is used for building items like bricks, cement, sand, etc.
Both BBS and BOQ are importa...
I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.
Top trending discussions
The duration of Majestique Landmarks interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 12 interviews
Interview experience
based on 94 reviews
Rating in categories
Senior Engineer
43
salaries
| ₹6 L/yr - ₹11.1 L/yr |
Senior Civil Engineer
21
salaries
| ₹4.2 L/yr - ₹9.5 L/yr |
Project Manager
20
salaries
| ₹9.1 L/yr - ₹13.8 L/yr |
Junior Engineer Civil
17
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Junior Engineer
16
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Lea Associates South Asia
ABCI Infrastructures
VIKRAN Engineering & Exim
The Louis Berger Group