Filter interviews by
I applied via WorkIndia and was interviewed in Nov 2024. There were 2 interview rounds.
I have 5 years of experience working as a Site Engineer in construction projects.
Managed construction projects from start to finish
Coordinated with architects, contractors, and subcontractors
Ensured compliance with building codes and safety regulations
Performed site inspections and quality control checks
Resolved any issues or conflicts that arose during construction
HVAC systems control the temperature, humidity, and air quality in a building by circulating air through heating and cooling units.
HVAC systems work by controlling the temperature, humidity, and air quality in a building.
They use a combination of heating, ventilation, and air conditioning units to achieve this.
Heating units like furnaces or boilers provide warmth during cold weather.
Ventilation systems circulate fresh ...
Responsibilities and safety considerations in HVAC system installation
Ensuring proper sizing and placement of HVAC equipment
Following manufacturer's instructions and building codes
Testing for leaks and proper airflow
Implementing safety measures for electrical connections and refrigerant handling
Providing proper ventilation during installation
Training personnel on safe operation and maintenance of HVAC systems
Air conditioning vapor is used to cool and dehumidify the air in a space.
Air conditioning vapor absorbs heat from the air to cool it down
It also removes moisture from the air to reduce humidity levels
The cooled and dehumidified air is then circulated back into the space
Commonly used in residential, commercial, and industrial buildings
Top trending discussions
I applied via Company Website and was interviewed before Oct 2021. There were 3 interview rounds.
Concrete temperature refers to the temperature of freshly mixed concrete.
Concrete temperature affects the setting time and strength development of concrete.
It is important to control the temperature of concrete during mixing, transportation, and placement.
High temperatures can accelerate the setting time and reduce workability, while low temperatures can slow down setting and strength gain.
Concrete temperature is typic...
Precocious of water structure joint refers to the ability of a joint to withstand water pressure and prevent leakage.
Water structure joints should be designed and constructed to be watertight.
Various types of joints can be used in water structures, such as expansion joints, construction joints, and control joints.
Proper sealing materials and techniques should be employed to ensure the integrity of the joints.
Regular in...
Cube test results are used to determine the compressive strength of concrete at 7 and 28 days.
Cube test involves casting cubes of concrete and testing them under compression
Results are reported in terms of compressive strength in MPa or psi
7-day results are used to determine early strength and 28-day results are used to determine ultimate strength
Concrete with a compressive strength of at least 20 MPa is considered sui
I applied via LinkedIn and was interviewed in Jul 2024. There were 7 interview rounds.
If vinay is 6 months old, how much old is his younger brother, 6 years different
About civil engineering, structure engineering, construction, bill of materials
About concrete, pro and cons
About Design Concrete
Case study leaning tower of pissa
My name is John Smith.
My first name is John
My last name is Smith
I go by the name John Smith
My name is John Smith.
Full name is John Smith
Common name
No middle name or initial
I am 28 years old.
I am currently 28 years old.
My age is 28.
I was born in 1993.
I applied via Job Portal and was interviewed in Jul 2022. There was 1 interview round.
Aptitude n reasoning
Basic DSA questions, like prime numbers
posted on 3 Apr 2021
I applied via Referral and was interviewed in Oct 2020. There were 5 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.
posted on 15 Jan 2024
Some of the top questions asked at the Magneto CleanTech Site Engineer interview for experienced candidates -
based on 1 interview
Interview experience
Senior Business Development Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Business Development Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Sales Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Technical Analyst
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Marketing Associate
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Ather Energy
Thermax Limited
Suzlon Group
Kirloskar Electric Company