Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Apr 2022. There were 4 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
CFMEA stands for Control Failure Mode and Effects Analysis.
CFMEA is a systematic approach used to identify and mitigate potential failures in a process or system.
It involves analyzing failure modes, their causes, and the potential effects on the process or system.
CFMEA helps in prioritizing and implementing control measures to prevent or minimize failures.
It is commonly used in industries such as manufacturing, automot...
System level DFMEA is given main preference.
System level DFMEA considers the entire system and its interactions.
Component level DFMEA focuses on individual components.
System level DFMEA is more comprehensive and effective in identifying potential failures.
Example: In automotive industry, system level DFMEA would consider the entire vehicle and its subsystems.
Example: In medical devices, system level DFMEA would conside...
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Project Management related What is Your Previous Experience .
I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jul 2023. There were 2 interview rounds.
15 Questions on maths quant and di.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Takt time is calculated by dividing the available production time by the customer demand.
Calculate the total available production time in a specified period (e.g. 1 day)
Determine the customer demand for the same period
Divide the total available production time by the customer demand to get the takt time
Takt Time = Total Production Time / Customer Demand
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Identify the tasks required to complete a process
Determine the cycle time for each task
Assign tasks to workstations based on cycle time and workload
Ensure that workstations are balanced to avoid bottlenecks
Regularly review and adjust the line balancing to optimize efficiency
Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.
Identify the key components of the system or process that contribute to its capacity
Collect data on the current workload or demand placed on the system
Use mathematical models or simulations to predict how the system will perform under different levels of workload
Consider factors such as resource ava...
I applied via Naukri.com and was interviewed before Jul 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.
Senior Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Quality Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Motors
Mahindra & Mahindra
Ashok Leyland
Maruti Suzuki