Filter interviews by
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
MBA opretion and packaging manegement
I applied via Campus Placement
I applied via Recruitment Consulltant and was interviewed before Sep 2022. There were 2 interview rounds.
Lupin interview questions for designations
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
An HVAC flow diagram shows the path of air through a heating, ventilation, and air conditioning system.
The diagram typically includes components such as air handlers, ductwork, filters, and fans.
It shows the direction of airflow and the location of temperature and humidity sensors.
The diagram may also include information about the type of HVAC system, such as a split system or a packaged unit.
The flow diagram is import...
A water system flow diagram illustrates the movement of water through various components of a system.
The diagram typically includes sources of water, such as reservoirs or wells.
It shows the pathways through which water flows, such as pipes or channels.
Components like pumps, valves, and filters are depicted to indicate their role in the system.
The diagram may also include water treatment processes, such as filtration o...
QMS documentation procedure is a process of creating, maintaining, and updating documents related to quality management system.
Identify the documents required for QMS
Create and review the documents
Ensure the documents are accessible and controlled
Maintain and update the documents as necessary
Train employees on the QMS documentation procedure
I have handled various machines including printers, scanners, and copiers.
Printers: HP LaserJet, Canon Inkjet
Scanners: Epson, Fujitsu
Copiers: Xerox, Ricoh
Top trending discussions
G.S.R.T.C apprenticeship Puri Thai gai che
posted on 26 Mar 2023
RMG end point is the final destination or target of a Resource Management Group (RMG) process.
RMG end point refers to the ultimate goal or outcome of a Resource Management Group process.
It is the desired result or objective that the RMG process aims to achieve.
For example, in a project management context, the RMG end point could be the successful completion of a project within the allocated resources and timeline.
Drying is done when the material is completely free of moisture and has reached the desired level of dryness.
Check the moisture content of the material using a moisture meter.
Observe the physical characteristics of the material, such as color, texture, and weight. If the material appears dry and feels lightweight, it may be fully dried.
Monitor the drying time. If the material has been drying for the recommended duratio...
RMG principle stands for Risk Management Group principle.
RMG principle is a risk management approach used in various industries.
It involves identifying, assessing, and mitigating risks to achieve organizational objectives.
The principle emphasizes proactive risk management rather than reactive measures.
RMG principle helps in minimizing potential losses and maximizing opportunities.
It involves creating risk management st...
FBP principles refer to the principles of Function-Behavior-Purpose, which are used in systems engineering to analyze and design systems.
FBP principles are used in systems engineering to analyze and design systems.
Function refers to the purpose or role of a component or system.
Behavior refers to the actions or operations performed by the component or system.
Purpose refers to the overall objective or goal of the compone...
Sifter principles are a set of guidelines or criteria used to filter or sort information or data.
Sifter principles are used to separate relevant information from irrelevant information.
They help in organizing and prioritizing data based on specific criteria.
Examples of sifter principles include relevance, accuracy, timeliness, and credibility.
For instance, when conducting research, one may use sifter principles to dete...
Multimill is a set of principles for managing multiple projects simultaneously.
Multimill emphasizes on prioritizing projects based on their importance and urgency.
It also focuses on effective communication and collaboration among team members.
Multimill encourages the use of project management tools and techniques to streamline processes.
Examples of such tools include Gantt charts, Kanban boards, and agile methodologies...
posted on 14 Nov 2023
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There was 1 interview round.
I was interviewed before Feb 2024.
I was interviewed before May 2023.
Types of reactors include batch reactors, continuous stirred-tank reactors, and plug flow reactors.
Batch reactors operate in a closed system with a fixed amount of reactants.
Continuous stirred-tank reactors have continuous flow of reactants and products.
Plug flow reactors have a continuous flow with no mixing of reactants along the length of the reactor.
Distillation is a process used to separate components of a liquid mixture based on their boiling points.
Heat is applied to the mixture, causing the component with the lowest boiling point to vaporize first.
The vapor is then cooled and condensed back into liquid form, resulting in separate fractions.
This process is commonly used in the production of alcoholic beverages, petroleum refining, and water purification.
based on 7 interviews
1 Interview rounds
based on 116 reviews
Rating in categories
Officer
1.8k
salaries
| ₹1.5 L/yr - ₹8.4 L/yr |
Executive
1.8k
salaries
| ₹3.3 L/yr - ₹11.6 L/yr |
Research Associate
862
salaries
| ₹3 L/yr - ₹8 L/yr |
Senior Executive
729
salaries
| ₹5 L/yr - ₹17 L/yr |
Production Officer
671
salaries
| ₹2 L/yr - ₹7 L/yr |
Sun Pharmaceutical Industries
DRJ & CO
Cipla
Biocon Limited