i
Lumax Industries
Filter interviews by
I come from a supportive family and am passionate about process engineering. I left my previous organization for career growth opportunities.
Family details: Supportive family that encouraged my education and career choices
Reason for joining: Passion for process engineering and desire to contribute to innovative projects
Reason for leaving previous organization: Limited growth opportunities and desire for career advancem...
I applied via Referral and was interviewed in May 2021. There was 1 interview round.
The 3.5 core tools for quality are FMEA, Control Plan, SPC, and MSA.
FMEA (Failure Mode and Effects Analysis) helps identify and prevent potential failures in a process or product.
Control Plan outlines the steps to maintain quality during production.
SPC (Statistical Process Control) monitors and controls a process to ensure it stays within acceptable limits.
MSA (Measurement System Analysis) evaluates the measurement sys
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Jan 2024. There was 1 interview round.
Series circuits have one path for current flow, while parallel circuits have multiple paths.
Series circuits have the same current flowing through all components.
Parallel circuits have different currents flowing through each branch.
In series circuits, if one component fails, the entire circuit fails.
In parallel circuits, if one component fails, the other branches can still function.
Examples: Christmas lights are often c...
An inverter is a device that converts direct current (DC) to alternating current (AC) for use in electrical systems.
Converts DC to AC power
Used in solar power systems to convert DC power from solar panels to AC power for use in homes
Commonly used in uninterruptible power supplies (UPS) to provide backup power during outages
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 6 interview rounds.
Introduction and few case study intraction with MD sir
I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.
based on 3 interviews
Interview experience
based on 4 reviews
Rating in categories
Assistant Engineer
387
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Assistant Manager
330
salaries
| ₹4.6 L/yr - ₹12.5 L/yr |
Engineer
313
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Senior Engineer
222
salaries
| ₹3.4 L/yr - ₹9 L/yr |
Deputy Manager
163
salaries
| ₹6 L/yr - ₹17 L/yr |
Ceat Tyres
UNO Minda
Apollo Tyres
Exide Industries