Upload Button Icon Add office photos

Filter interviews by

Ludhiana Beverages Maintenance Engineer Interview Questions and Answers

Updated 23 Nov 2024

Ludhiana Beverages Maintenance Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Introduced yourself
  • Q2. Family background
Round 2 - Technical 

(2 Questions)

  • Q1. Basic knowledge
  • Q2. Previous company knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Best industry for freshers to increase technical knowledge

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Electrical questions
  • Q2. Diagrams and basics

Interview Preparation Tips

Interview preparation tips for other job seekers - Good luck

Interview Questionnaire 

1 Question

  • Q1. Experience

Interview Preparation Tips

Interview preparation tips for other job seekers - interview in gurgao
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the tpm
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing breakdowns and improving overall equipment efficiency

    • Involves regular maintenance, cleaning, and inspection of equipment

    • Encourages employee involvement and ownership of equipment maintenance

    • Uses tools like 5S, autonomous maintenance, and planned maintenance to achieve

  • Answered by AI
  • Q2. What is the schedule maintenance
  • Ans. 

    Scheduled maintenance is planned maintenance activities performed on a regular basis to prevent equipment failure and ensure optimal performance.

    • Scheduled maintenance involves creating a maintenance schedule based on manufacturer recommendations or industry best practices.

    • It includes tasks such as equipment inspections, lubrication, calibration, and replacement of worn parts.

    • Scheduled maintenance helps in identifying p...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is the tpm
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing breakdowns and improving overall equipment efficiency

    • Involves regular maintenance, cleaning, and inspection of equipment

    • Encourages employee involvement and ownership of equipment maintenance

    • Uses tools like 5S, autonomous maintenance, and planned maintenance

    • Goal is to e...

  • Answered by AI
  • Q2. The full meaning of CLITE
  • Ans. 

    CLITE stands for Closed Loop Interactive Training Environment.

    • CLITE is a system used for interactive training in various fields.

    • It provides a closed loop environment for users to practice and improve their skills.

    • Examples of CLITE systems include flight simulators for pilots and virtual reality training for medical professionals.

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. What is the tpm
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing breakdowns and improving overall equipment efficiency

    • Involves regular maintenance, cleaning, and inspection of equipment

    • Encourages employee involvement and ownership of equipment maintenance

    • Uses tools like 5S, autonomous maintenance, and planned maintenance to achieve

  • Answered by AI
  • Q2. The meaning of CLITE
  • Ans. 

    CLITE stands for Closed Loop Interactive Training Environment.

    • CLITE is a type of training environment used in maintenance engineering.

    • It provides interactive simulations for hands-on learning.

    • Examples of CLITE systems include virtual reality training modules for equipment maintenance.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Any company very important machine maintenance time to time schedule maintain everyday every week maintenance machine

I was interviewed before Sep 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related as per cv technical as per my experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Regarding utility. Like air compressor, power generator and packaging machine or printer machine

I applied via Campus Placement

Interview Preparation Tips

Round: Resume Shortlist
Experience: It was based on CGPA and Tech projects
Tips: Ensure you have explained your tech projects well

Round: Group Discussion
Experience: A very good panel. A lot of good points were raised.
Tips: Make sure you raise your points well
Duration: 20 minutes

Round: Technical Interview
Experience: Tried to test the basics of almost everything that we have studied.

General Tips: Be confident throughout the process. That helps a lot.
Skill Tips: Brush up your courses
Skills: Engineering Knowledge
Duration: 2
College Name: IIT Madras
Motivation: The fact that the role is going to be techno-managerial. Also, the compensation.

I applied via Walk-in and was interviewed before Sep 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Transformers, brakers ,Drives, genarator, cables and glands, previously working experience and types of machines handling,
  • Q2. Transformer working and its parts working, genarator parts and maintenance a, b, c, d, checks, braker principal and parts working, drives, etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn skills gaining knowledge about our core subject and experians and learn new skills
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Question paper for solve 50 questions

Round 2 - Technical 

(3 Questions)

  • Q1. About utility boiler chiller
  • Q2. Electrical safety
  • Q3. Line maintenance
Round 3 - HR 

(1 Question)

  • Q1. Man power handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Selected

I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Reasoning and simple calculation based question with some departmental questions.

Round 3 - Technical 

(2 Questions)

  • Q1. Explain basic refrigeration cycle.
  • Ans. 

    The refrigeration cycle is a process of removing heat from a space or substance and transferring it to another location.

    • The cycle consists of four main components: compressor, condenser, expansion valve, and evaporator.

    • The refrigerant is compressed by the compressor and then sent to the condenser where it releases heat and condenses into a liquid.

    • The liquid refrigerant then passes through the expansion valve, where it ...

  • Answered by AI
  • Q2. Explain about the project u have done in your college

Interview Preparation Tips

Topics to prepare for Varun Beverages Service Engineer interview:
  • Refrigeration
Interview preparation tips for other job seekers - Know your worth and don't hesitate to ask salary structure and negotiation.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Bearing and how to put bearing inside the shaft
  • Ans. 

    To put a bearing inside a shaft, follow these steps: measure the shaft and bearing dimensions, clean the shaft and bearing, apply lubrication, align the bearing with the shaft, and press or slide the bearing into the shaft.

    • Measure the dimensions of the shaft and bearing to ensure compatibility.

    • Clean the shaft and bearing surfaces to remove any dirt or debris.

    • Apply lubrication to the shaft and bearing to reduce friction...

  • Answered by AI
  • Q2. Manufacturing process in your plant
  • Ans. 

    Our manufacturing process involves several stages including raw material procurement, production, quality control, and packaging.

    • We source raw materials from trusted suppliers to ensure quality.

    • The production process includes various steps such as mixing, molding, and assembly.

    • We have a dedicated quality control team that conducts inspections and tests at different stages.

    • Packaging is done using automated machines to e...

  • Answered by AI
  • Q3. When and what u doin plant inventory whole process
  • Ans. 

    Plant inventory is conducted periodically to assess the stock of equipment, supplies, and materials.

    • Plant inventory is typically done on a regular basis, such as annually or quarterly.

    • The process involves physically counting and documenting all items in the plant, including machinery, tools, spare parts, and consumables.

    • Inventory records are updated to reflect the current stock levels and identify any discrepancies.

    • The...

  • Answered by AI

Ludhiana Beverages Interview FAQs

How many rounds are there in Ludhiana Beverages Maintenance Engineer interview?
Ludhiana Beverages interview process usually has 2 rounds. The most common rounds in the Ludhiana Beverages interview process are HR and Technical.
How to prepare for Ludhiana Beverages Maintenance Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ludhiana Beverages. The most common topics and skills that interviewers at Ludhiana Beverages expect are Breakdown Maintenance, Capacity Enhancement, Engineering Projects, FMCG and Maintenance Planning.

Tell us how to improve this page.

Ludhiana Beverages Maintenance Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Dabur Interview Questions
4.0
 • 271 Interviews
Nestle Interview Questions
3.9
 • 233 Interviews
Varun Beverages Interview Questions
4.0
 • 224 Interviews
PepsiCo Interview Questions
4.0
 • 197 Interviews
Britannia Interview Questions
4.0
 • 164 Interviews
Parle Agro Interview Questions
4.1
 • 103 Interviews
Bisleri Interview Questions
4.1
 • 81 Interviews
View all
Ludhiana Beverages Maintenance Engineer Salary
based on 4 salaries
₹1.8 L/yr - ₹2.8 L/yr
39% less than the average Maintenance Engineer Salary in India
View more details
Area Sales Manager
34 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Quality Chemist
30 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Executive
29 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Field Executive
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Quality Assurance Chemist
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Ludhiana Beverages with

Parle Agro

4.1
Compare

Dabur

4.0
Compare

Coca-Cola Company

4.1
Compare

PepsiCo

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview