Filter interviews by
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
posted on 5 Jul 2021
I applied via LinkedIn and was interviewed in Jan 2021. There were 3 interview rounds.
posted on 30 Aug 2023
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
posted on 9 May 2024
I applied via Apna Jobs and was interviewed in Apr 2024. There was 1 interview round.
I applied via Company Website and was interviewed in May 2021. There were 5 interview rounds.
I am very confident in meeting deadlines and ensuring timely output.
I prioritize tasks and create a schedule to ensure timely completion.
I regularly communicate with team members to ensure everyone is on track.
I am proactive in identifying potential delays and finding solutions to avoid them.
I have a track record of meeting deadlines in my previous roles.
There are various types of engines used in construction equipment.
Diesel engines are commonly used in construction equipment due to their high torque and fuel efficiency.
Gasoline engines are also used in smaller construction equipment.
Electric engines are becoming more popular for their low noise and zero emissions.
Hybrid engines combine the benefits of both diesel and electric engines.
Some construction equipment may a...
I appeared for an interview before May 2016.
I have strong leadership and communication skills that are better suited for a non-technical role.
I excel in managing teams and resolving conflicts
I have a knack for strategic planning and decision-making
I enjoy interacting with customers and providing excellent service
posted on 25 Oct 2017
I appeared for an interview before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
based on 1 interview
Interview experience
Purchase Manager
6
salaries
| ₹10.1 L/yr - ₹11 L/yr |
Senior Executive
6
salaries
| ₹3.8 L/yr - ₹6.5 L/yr |
Senior Accounts Executive
5
salaries
| ₹4 L/yr - ₹4.7 L/yr |
Executive Assistant
5
salaries
| ₹3.5 L/yr - ₹9.5 L/yr |
Consultant Physician
4
salaries
| ₹10.8 L/yr - ₹15.6 L/yr |
Marpu Foundation
The Akshaya Patra Foundation
CARE
Magic Bus India Foundation