Filter interviews by
I applied via Company Website and was interviewed before Nov 2021. There were 2 interview rounds.
The tool used for SAP Upgrade is Software Update Manager (SUM).
Software Update Manager (SUM) is the standard tool provided by SAP for performing system upgrades.
It is used to upgrade SAP systems to higher versions or apply support packages and patches.
SUM provides a guided procedure with step-by-step instructions for the upgrade process.
It performs various tasks such as system checks, pre-upgrade activities, database m...
We use SAP Migration Cockpit for SAP Migration.
SAP Migration Cockpit is a tool used for migrating data from legacy systems to SAP systems.
It supports various migration objects like master data, transaction data, and customizing data.
It provides a user-friendly interface for mapping and transferring data.
It also allows for data validation and error handling during the migration process.
Example: Migrating customer data f...
SUM DMO is a single step migration tool while SWPM is a multi-step migration tool.
SUM DMO is used for homogeneous system migrations while SWPM is used for heterogeneous system migrations.
SUM DMO is faster and more efficient than SWPM.
SUM DMO requires less manual intervention compared to SWPM.
SUM DMO is recommended for SAP HANA migrations while SWPM is recommended for non-HANA migrations.
SUM DMO performs the migration a...
SYSTEM user is important in SAP HANA for performing administrative tasks and managing the system.
SYSTEM user has unrestricted access to all system objects and can perform any operation on them.
It is used for performing administrative tasks such as creating users, managing roles, and granting privileges.
It is also used for managing the system, such as starting and stopping the database, and performing backups and restor...
SUM has 5 stages: PREPARE, DOWNLOAD, PREPROCESS, MAIN IMPORT, POSTPROCESS.
PREPARE stage checks system prerequisites and creates a configuration file.
DOWNLOAD stage downloads the required software components.
PREPROCESS stage performs system checks and prepares the system for the main import.
MAIN IMPORT stage imports the software components into the system.
POSTPROCESS stage performs post-import activities like database u
The SUM can be reset until the start of the execution phase.
SUM (Software Update Manager) can be reset until the execution phase starts.
Once the execution phase starts, the SUM cannot be reset.
Resetting the SUM deletes all the logs and data collected during the previous run.
Resetting the SUM is useful when there are errors during the pre-processing phase.
After resetting the SUM, the pre-processing phase needs to be exe
SPDD and SPAU are tools used in SAP to manage modifications made to standard objects.
SPDD is used to manage modifications made to the ABAP Dictionary objects during a system upgrade.
SPAU is used to manage modifications made to the Repository objects during a system upgrade.
Both tools are necessary to ensure that modifications made to standard objects do not conflict with the upgrade process.
SPDD and SPAU help to identi...
Shadow system is a replica of the production system used for testing and validation purposes.
Shadow system helps in identifying and fixing issues before they occur in the production system.
It is necessary to ensure the smooth functioning of the production system.
It also helps in testing new functionalities and upgrades before implementing them in the production system.
Shadow system can be used for training purposes as ...
Optimizations for OS/DB migration
Perform a thorough analysis of the current system
Ensure compatibility of the new OS/DB with the SAP system
Perform necessary upgrades and patches
Optimize the system parameters and configurations
Perform thorough testing before and after migration
Yes, the SUM tool can be reset during an error faced in the Downtime.
The SUM tool can be reset during an error faced in the Downtime by using the 'Reset' button in the tool.
This will reset the tool to its initial state and allow you to start the process again.
However, it is important to note that resetting the tool may result in data loss or inconsistencies.
Therefore, it is recommended to only reset the tool as a last ...
I have performed various activities in SAP HANA including installation, configuration, monitoring, and troubleshooting.
Installed and configured SAP HANA database and client software
Performed system monitoring and performance tuning
Troubleshot issues related to SAP HANA database and applications
Implemented backup and recovery strategies
Created and managed database users and roles
Implemented security measures to protect ...
The command to check profile consistency in Linux is 'saproot.sh'.
The 'saproot.sh' command checks the consistency of SAP profiles in Linux.
It can be run as the 'root' user or with 'sudo'.
The output of the command shows any inconsistencies in the profiles.
The command can be used to troubleshoot issues related to SAP profiles.
Check user credentials and system status, analyze logs and diagnose the issue.
Verify user ID and password
Check if the system is up and running
Analyze system logs for any errors or warnings
Diagnose the issue and take necessary actions
Restart the system if required
Homogeneous system copy is copying SAP system to the same OS/DB platform, while heterogeneous system copy is copying to a different platform.
Homogeneous system copy is done within the same OS/DB platform.
Heterogeneous system copy is done between different OS/DB platforms.
Homogeneous system copy is faster and easier than heterogeneous system copy.
Examples of homogeneous system copy include copying from SAP HANA to SAP H...
Yes, I have experience in refreshing database platforms.
I have refreshed SAP HANA databases for clients during system upgrades.
I have also refreshed Oracle databases for clients during system migrations.
I am familiar with the process of backing up and restoring databases to refresh them.
To check active processes in Linux, use the 'ps' command.
Open the terminal and type 'ps' followed by any options you want to use.
Use 'ps aux' to see all processes running on the system.
Use 'ps -ef' to see a full list of processes with their parent process ID (PPID).
Use 'ps -eLf' to see a tree-like structure of processes and their child processes.
Use 'top' command to see real-time information about processes and system ...
JCO connection is used to establish communication between SAP systems and non-SAP systems.
JCO stands for Java Connector
It is used to connect SAP systems with non-SAP systems
It enables communication between SAP systems and external systems using Java applications
JCO connection is established through a set of Java classes provided by SAP
It is used for data exchange, remote function calls, and business process management
To troubleshoot a hanging JAVA portal for ESS and MSS portal, check system logs, restart services, and analyze system performance.
Check system logs for any errors or warnings related to the portal
Restart the services related to the portal
Analyze system performance to identify any bottlenecks or resource constraints
Check if there are any recent changes made to the system that could have caused the issue
Verify if the iss...
Memory allocation in SAP ABAP refers to the process of assigning memory to different components of the system.
Memory allocation is a critical aspect of SAP ABAP system performance.
It involves allocating memory to different components such as work processes, buffers, and shared memory.
The amount of memory allocated to each component is determined by system parameters and can be adjusted as needed.
Proper memory allocatio...
Homogenous system copy can be done using SAPinst tool and Heterogenous system copy can be done using SWPM tool.
Homogenous system copy involves copying the SAP system from one host to another with the same operating system and database.
SAPinst tool is used for Homogenous system copy.
Heterogenous system copy involves copying the SAP system from one host to another with a different operating system or database.
SWPM tool i...
Yes, I have set up HA architecture in SAP.
I have experience setting up high availability (HA) architecture in SAP using technologies such as SAP HANA System Replication (HSR) and SAP HANA Shared Disk (HSD).
I have configured HA for SAP systems such as SAP ERP, SAP BW, and SAP CRM.
I have also implemented disaster recovery (DR) solutions for SAP systems using technologies such as SAP HANA System Replication (HSR) and SAP
Top trending discussions
I applied via Company Website and was interviewed in Sep 2024. There was 1 interview round.
Average time should be considered during performance analysis with ST03 transaction.
Average time gives a more accurate representation of overall performance compared to total time.
Total time can be skewed by outliers or extreme values, while average time provides a more balanced view.
For example, if there are a few long-running processes that significantly impact total time, focusing on average time can help identify o
Minimize downtime during SAP upgrade with SUM by using parallel processing, proper planning, and testing.
Utilize parallel processing to speed up the upgrade process
Properly plan and schedule the upgrade during off-peak hours to minimize impact on users
Perform thorough testing in a non-production environment before the actual upgrade
Use SAP EarlyWatch Alert to identify potential issues before the upgrade
Implement SAP Sy...
R3trans and R3load processes are used during SAP upgrade using SUM for data migration and transport.
R3trans is used for transporting data between systems during the upgrade process.
R3load is used for loading data into the upgraded system.
R3trans and R3load are part of the Software Update Manager (SUM) tool used for SAP upgrades.
SUM 2.0 is an updated version of SUM 1.0 with improved features. SUM 2.0 cannot be used for SAP JAVA systems due to compatibility issues.
SUM 2.0 has enhanced functionalities and better performance compared to SUM 1.0
SUM 2.0 is not compatible with SAP JAVA systems because it lacks support for certain Java-specific components and processes
Using SUM 2.0 for SAP JAVA systems can lead to errors and issues during the upgrade
Check prerequisites, resolve issues, update software components, check system status, and re-run maintenance planner.
Check if all prerequisites are met before running maintenance planner
Resolve any issues or errors that are causing the maintenance planner to not be green
Update software components if necessary
Check the system status to ensure it is stable and running properly
Re-run the maintenance planner after addressi
Delta Merge in SAP HANA is a process where data from delta storage is merged into main storage to optimize performance.
Delta merge is a process in SAP HANA where data from delta storage is merged into main storage to optimize performance.
It helps in reducing the size of delta storage and improving query performance.
Delta merge is triggered automatically by SAP HANA based on certain conditions like memory consumption or...
Delta merge may not run properly due to incorrect configuration, insufficient resources, or system errors.
Check the configuration settings for delta merge to ensure they are correct
Ensure that there are enough resources (memory, CPU, disk space) available for delta merge to run smoothly
Monitor system logs for any errors or issues that may be preventing delta merge from running properly
Restart the system or the relevant...
Pre-requisites for manual delta merge include proper system backup, sufficient disk space, and no active users.
Ensure system backup is taken before performing manual delta merge.
Make sure there is enough disk space available for the merge process.
Ensure there are no active users or critical processes running during the merge.
Check for any pending updates or patches that may interfere with the merge.
Verify that all nece...
Strust is a transaction code used in SAP for managing SSL server PSEs. Different PSEs are used for different purposes.
Strust is used to manage SSL server PSEs in SAP systems
Different PSEs are used for different purposes such as encryption, authentication, etc.
Examples of PSEs include SSL server PSE, SSL client PSE, SNC PSE, etc.
To connect a 3rd party system with SAP, steps include creating RFC destination, configuring communication user, setting up authorizations, and exchanging certificates.
Create RFC destination in SAP system
Configure communication user in SAP system
Set up necessary authorizations for the RFC user
Exchange certificates between the 3rd party system and SAP system
Trusted RFC connections are secure connections between SAP systems for communication.
Trusted RFC connections are used to establish secure communication between SAP systems.
These connections are needed to ensure data integrity and confidentiality during data exchange.
To create trusted RFC connections, you need to configure the RFC destination in both sending and receiving systems.
You also need to maintain the trusted re...
Yes, it is possible to automate TR movement from DEV to QA.
Use transport management system (TMS) in SAP to automate TR movement
Set up transport routes and configure TMS to automatically release and import transports
Schedule background jobs to move transports at specific times
Use transport of copies (TOC) functionality to copy transports between systems
Label printers are specialized printers used to print labels for various purposes.
Label printers are designed specifically for printing labels, tags, and stickers.
They are commonly used in industries like manufacturing, retail, logistics, and healthcare.
Label printers use different types of printing technologies such as direct thermal or thermal transfer.
Unlike usual printers, label printers are more durable and can ha...
Possible reasons for performance issue between 1 to 2 PM everyday and how to resolve it
Check for any scheduled jobs or backups running during that time causing high system load
Monitor system resources like CPU, memory, and disk usage during that time
Review system logs for any errors or warnings occurring at that specific time
Consider implementing performance tuning measures such as optimizing database queries or increa...
Different tcodes for traces in SAP BASIS and specific information to look for in STAD
ST01 - System Trace: Monitor user activities and authorization checks
ST05 - Performance Trace: Analyze performance issues
ST11 - Display Developer Traces: View developer traces for debugging
ST12 - SAP System Trace Configuration: Configure trace settings
ST22 - ABAP Dump Analysis: Check for ABAP dumps and errors
TMS in SAP HANA manages transport requests for system changes, similar to SAP JAVA. It ensures controlled deployment of changes.
TMS in SAP HANA is used to manage transport requests for system changes, ensuring controlled deployment.
It allows for organizing changes into packages, moving them between systems, and tracking changes.
TMS in SAP JAVA also serves a similar purpose, managing transport requests for Java-based sy...
Domain link in SAP is a logical link between a domain and a data element.
Domain link is used to assign a domain to a data element in SAP.
It helps in defining the characteristics and constraints of the data element.
Domain link ensures consistency and reusability of domain definitions.
Example: Linking a domain 'Material Number' to a data element 'MATNR' in SAP.
Yes, it is possible to add another transport layer between QA and Prod systems.
Yes, you can add an additional transport layer between QA and Prod systems in SAP by creating a new transport route.
This can be achieved by configuring a new transport layer in the landscape configuration.
The new transport layer can be used to control the flow of transports between QA and Prod systems separately.
This setup allows for better ...
A single HANA node can have a maximum memory of 24 TB.
A single HANA node can have a maximum memory of 24 TB.
The memory capacity of a HANA node can vary depending on the hardware configuration.
For example, a HANA node with 2 TB RAM per socket can have up to 12 sockets, resulting in a total memory capacity of 24 TB.
Yes, ECC on HANA can have scaleout scenario.
ECC on HANA can be scaled out by adding additional application servers to distribute workload.
Scaleout scenario helps in improving performance and handling increased workload.
It allows for horizontal scaling by adding more servers to the existing landscape.
Example: Adding more application servers to an ECC on HANA system to handle increased user load.
SAP Software Update Manager (SUM) offers various strategies for system updates and upgrades.
Downtime-minimized strategy: Reduces system downtime during updates by performing most of the activities online.
Standard strategy: Follows the traditional update process with downtime for the system.
Maintenance planner strategy: Uses SAP Maintenance Planner tool to plan updates and upgrades.
Stack XML strategy: Allows importing s...
Sizing of SAP and HANA involves determining the hardware requirements based on the workload and usage patterns.
Sizing involves analyzing the current and future workload of the SAP system.
Factors such as number of users, transactions, data volume, and growth projections are considered.
Tools like SAP Quick Sizer and SAP HANA Sizing reports are used to estimate hardware requirements.
Proper sizing ensures optimal performan
Approximately 1.5 TB of memory is needed for a HANA system with 1TB of database.
HANA systems typically require 1.5 times the size of the database in memory for optimal performance
In this case, with a 1TB database, approximately 1.5 TB of memory would be needed
Memory requirements may vary based on specific configurations and usage patterns
HANA Cockpit is a web-based tool for administration and monitoring, while HANA Studio is a desktop application for development and modeling.
HANA Cockpit is web-based, accessible via a browser, while HANA Studio is a desktop application.
HANA Cockpit is used for administration, monitoring, and performance tuning, while HANA Studio is used for development, modeling, and data provisioning.
HANA Cockpit provides a centralize...
Yes, in SAP HANA it is possible to create multiple files for backup instead of one big file.
Yes, in SAP HANA, you can split the backup into multiple files for easier management and storage.
This can be achieved by specifying the number of backup files and their sizes during the backup process.
For example, you can create 10 files of 100 GB each for a total backup size of 1 TB.
SAP HANA 2.0 SPS 05 is the latest version available on SAP Marketplace.
SAP HANA 2.0 SPS 05 was released in May 2020.
It includes new features and enhancements for improved performance and usability.
Customers can download the latest version from the SAP Marketplace.
To install SAP HANA license for Tenant DB, use HDBLCM tool and apply the licenses in a specific sequence.
Use HDBLCM tool to install SAP HANA license for Tenant DB
Apply the licenses in the following sequence: System DB, Tenant DB, and then XS Advanced
Ensure that the license key is valid and matches the hardware key of the system
System copy involves duplicating an entire system, while system refresh involves updating an existing system with new data.
System copy creates an exact replica of a system, including all data and configurations.
System refresh updates an existing system with new data, without changing the system's configuration.
System copy is typically used for creating a test system or for disaster recovery purposes.
System refresh is u...
I applied via Company Website and was interviewed in Oct 2024. There was 1 interview round.
A scale up system refers to increasing the capacity of a single server by adding more resources such as CPU, memory, or storage.
Involves adding more resources to a single server to increase its capacity
Common resources added include CPU, memory, and storage
Used to improve performance and handle increased workload
Examples include upgrading a server with additional RAM or adding more CPU cores
SQL db upgrade and migration in SAP Basis involves planning, testing, and executing the upgrade process to ensure data integrity and system stability.
Plan the upgrade process including backup and restore procedures
Test the upgrade in a non-production environment to identify and resolve any issues
Execute the upgrade during a scheduled downtime to minimize impact on users
Monitor the upgrade process and performance post-u...
Salman alert issues can occur if the alerts are not configured correctly in SAP Basis system.
Ensure that the alert configuration is properly set up in SAP Solution Manager
Check the alert rules and thresholds to make sure they are appropriate
Verify that the alert notifications are being sent to the correct recipients
Monitor the alerting system regularly to catch any issues early on
Situation and Technical questions
Bubble sort is a simple sorting algorithm that repeatedly steps through the list, compares adjacent elements, and swaps them if they are in the wrong order.
Iterate through the array and compare adjacent elements
Swap elements if they are in the wrong order
Repeat the process until the array is sorted
Example: ['3', '1', '4', '1', '5', '9', '2'] -> ['1', '1', '2', '3', '4', '5', '9']
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
STMS configuration steps involve setting up transport routes, systems, and groups in SAP system landscape.
Create transport domain using STMS transaction
Define transport routes between systems
Assign systems to transport groups
Configure transport layers for systems
Set up transport directory and buffer directories
I was interviewed in Jul 2023.
I applied via Company Website and was interviewed before Dec 2023. There were 2 interview rounds.
Polymorphism is the ability of a single function or method to operate on different types of data.
Polymorphism allows objects of different classes to be treated as objects of a common superclass.
It enables a single interface to represent multiple underlying forms.
Examples include method overloading and method overriding in object-oriented programming languages like Java.
Local variables are variables declared within a specific function or block of code, while global variables are declared outside of any function and can be accessed throughout the program.
Local variables are only accessible within the function or block where they are declared.
Global variables can be accessed from any part of the program.
Local variables have limited scope, while global variables have a wider scope.
Exampl...
I have faced challenges in my life that have helped me grow and develop resilience.
Overcoming personal health issues
Navigating through difficult family situations
Adapting to new environments and cultures
Handling work-related stress and deadlines
based on 1 review
Rating in categories
Senior SAP Basis Consultant
6
salaries
| ₹23 L/yr - ₹46 L/yr |
Infrastructure Engineer
4
salaries
| ₹22.8 L/yr - ₹30.2 L/yr |
Critical Incident Manager
4
salaries
| ₹13 L/yr - ₹20 L/yr |
SAP Basis Consultant
3
salaries
| ₹12 L/yr - ₹32 L/yr |
Service Delivery Manager
3
salaries
| ₹20 L/yr - ₹32 L/yr |
Accenture
Deloitte
KPMG India
PwC