Filter interviews by
I applied via Walk-in and was interviewed before Oct 2020. There were 3 interview rounds.
ECN plays a crucial role in PPAP by ensuring that any changes made to the product or process are properly documented and approved.
ECN stands for Engineering Change Notice
PPAP stands for Production Part Approval Process
ECN is used to document any changes made to the product or process
ECN ensures that all changes are properly reviewed and approved before implementation
ECN helps to maintain consistency and quality in the ...
PSW stands for Production Part Approval Process. It is a process used in manufacturing to ensure that a product meets the required specifications.
The first stage is planning and preparation.
The second stage is design and development.
The third stage is validation and testing.
The fourth stage is production and monitoring.
The final stage is analysis and improvement.
Examples of PSW documents include control plans, process
D5 & D6 are critical steps in 8D report for identifying root cause and implementing corrective actions.
D5 involves identifying the root cause of the problem using tools like Fishbone diagram, 5 Whys, etc.
D6 involves implementing corrective actions to prevent recurrence of the problem.
Both D5 and D6 are crucial for ensuring long-term effectiveness of the corrective actions.
Without proper identification of root cause (D5...
PFD stands for Process Flow Diagram while PFC stands for Process Flow Chart.
PFD is a schematic representation of a process system showing the equipment, piping, and instrumentation.
PFC is a graphical representation of a process system showing the sequence of steps involved in a process.
PFD is used to understand the overall process flow and identify potential hazards.
PFC is used to identify the steps involved in a proce...
Scatter diagram is a graphical tool used to display the relationship between two variables.
It shows the correlation between two variables on a graph.
It helps in identifying patterns and trends in data.
It is useful in identifying the cause and effect relationship between two variables.
It is commonly used in quality control to identify the relationship between two process variables.
Example: A scatter diagram can be used ...
MSA stands for Measurement System Analysis, which is a statistical method used to determine the variation in measurement processes.
MSA is used to evaluate the accuracy and precision of a measurement system.
It helps to identify the sources of variation in the measurement process.
MSA is commonly used in manufacturing and quality control processes.
Examples of MSA tools include Gage R&R, ANOVA, and Attribute Agreement Anal
DMAIC is a problem-solving methodology used in Six Sigma to improve processes and reduce defects.
DMAIC stands for Define, Measure, Analyze, Improve, and Control.
It is a structured approach to problem-solving that helps identify and eliminate root causes of defects.
DMAIC is used to improve processes, reduce costs, and increase customer satisfaction.
Example: A company uses DMAIC to reduce defects in their manufacturing p...
Top trending discussions
Seeking new challenges and growth opportunities in a more innovative and collaborative environment.
Desire for professional growth and development
Looking for new challenges and opportunities to learn
Seeking a more innovative and collaborative work environment
I have a strong background in QA engineering with a proven track record of improving product quality and efficiency.
I have X years of experience in QA engineering, including experience with automated testing tools such as Selenium.
I have a strong attention to detail and a passion for ensuring products meet high quality standards.
I have a track record of identifying and resolving bugs quickly, leading to improved produc
My salary requirements are negotiable and dependent on the overall compensation package offered.
Salary is negotiable based on the overall compensation package
Open to discussing benefits, bonuses, and other incentives
Seeking fair market value for my skills and experience
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 3 interview rounds.
In my previous company, I was responsible for designing and executing test cases, identifying and reporting bugs, and collaborating with developers to resolve issues.
Designed and executed test cases to ensure software quality
Identified and reported bugs using bug tracking tools
Collaborated with developers to resolve issues and retest fixes
QA Engineers handle various equipment for testing and quality assurance purposes.
Testing tools and frameworks like Selenium, JUnit, TestNG
Bug tracking and test management tools like JIRA, TestRail
Virtual machines and emulators for testing on different platforms
Hardware devices like smartphones, tablets, and computers
Network testing equipment like routers, switches, and load balancers
Performance testing tools like Apach...
Documents handled by QA Engineers include test plans, test cases, bug reports, and user manuals.
Test plans: Documents outlining the overall testing strategy and approach for a software project.
Test cases: Documents specifying the steps to be executed and the expected results for testing different aspects of the software.
Bug reports: Documents detailing the issues or defects found during testing, including steps to repr...
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Understand what they have want to know about you,then say
I applied via Campus Placement and was interviewed in Aug 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2021. There were 2 interview rounds.
Costing for different types of BOPP involves various factors such as raw material cost, production cost, and overhead expenses.
Raw material cost includes the cost of polypropylene resin, additives, and other materials used in the production process.
Production cost includes expenses related to labor, energy, and maintenance of machinery.
Overhead expenses include costs related to administration, marketing, and distributi...
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
1 hour online test for the same
I have a background in statistics and data analysis with a focus on healthcare data.
Bachelor's degree in Statistics
Experience with data cleaning and manipulation
Proficient in statistical software such as R and Python
Worked on projects analyzing healthcare data
Quality Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Engineer Trainee (Get)
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Supreme Industries
Nilkamal
Time Technoplast
Jain Irrigation Systems