Filter interviews by
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
Injection molding machine cycle refers to the process of injecting molten material into a mold, cooling and solidifying it, and then ejecting the finished product.
Injection: Molten material is injected into the mold under high pressure
Cooling: The mold is cooled to solidify the material
Ejection: The finished product is ejected from the mold
Cycle time: The time taken for one complete cycle of injection, cooling, and eje...
The Injection molding machine hydraulic circuit is a system that controls the flow of hydraulic fluid to operate the machine's components.
The hydraulic circuit consists of a hydraulic pump, hydraulic fluid reservoir, hydraulic valves, and hydraulic cylinders.
The pump generates hydraulic pressure to move the fluid through the circuit.
The valves control the direction and flow of the hydraulic fluid to different component...
Top trending discussions
I applied via Naukri.com
Cpk and cpk are statistical measures used to assess the capability of a process to meet specifications.
Cpk measures how well a process can produce output within specification limits.
Cpk takes into account both the mean and the variation of the process.
Cpk is calculated as the minimum of (USL - mean) / (3 * standard deviation) and (mean - LSL) / (3 * standard deviation).
Cpk should be at least 1.33 to indicate a capable ...
I applied via Naukri.com and was interviewed in Aug 2021. There were 4 interview rounds.
I applied via AmbitionBox and was interviewed in Nov 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2021. There were 2 interview rounds.
Hi there good luck to you
Material management involves planning, organizing, and controlling the flow of materials from acquisition to use or disposal.
Involves planning, organizing, and controlling materials
Ensures materials are available when needed
Optimizes inventory levels to minimize costs
Tracks and monitors material usage and waste
Coordinates with suppliers for timely delivery
I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Aug 2023. There was 1 interview round.
I have the experience, skills, and dedication to effectively lead and support a team towards success.
Proven track record of successfully supervising teams in previous roles
Strong communication and problem-solving skills
Ability to motivate and inspire team members to achieve goals
Experience in creating and implementing effective strategies for team performance improvement
My vision is to create a positive and productive work environment where employees feel valued and motivated to achieve their full potential.
Foster a culture of open communication and collaboration
Provide opportunities for professional development and growth
Set clear goals and expectations for team members
Recognize and reward hard work and dedication
My mission as a Supervisor is to lead by example, empower my team, and drive continuous improvement in operations.
Lead by example by demonstrating strong work ethic and professionalism
Empower team members by providing support, guidance, and opportunities for growth
Drive continuous improvement by implementing efficient processes and fostering a culture of innovation
I am a Supervisor with strengths in leadership, communication, problem-solving, and organization.
Strong leadership skills demonstrated through successfully leading teams to achieve goals
Effective communication abilities in providing clear instructions and feedback to team members
Proven problem-solving skills in resolving conflicts and addressing challenges in the workplace
Excellent organizational skills in managing tas
I am currently residing in XYZ city, ABC country.
Currently residing in XYZ city
Living in ABC country
Address is 123 Main Street, XYZ city, ABC country
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.
based on 1 interview
Interview experience
Quality Engineer
25
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
Engineer
24
salaries
| ₹2.7 L/yr - ₹5.8 L/yr |
Production Engineer
22
salaries
| ₹2.9 L/yr - ₹5.5 L/yr |
Team Lead
15
salaries
| ₹2.7 L/yr - ₹4 L/yr |
Graduate Engineer Trainee (Get)
14
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Nayara Energy
HPCL-Mittal Energy Limited
Ongc Petro Additions
PCBL Chemical Limited