Filter interviews by
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
We have to solve two big coding question problems
Top trending discussions
posted on 24 Feb 2022
I appeared for an interview in Sep 2021.
About me
posted on 22 Feb 2023
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 3 interview rounds.
Populations forcasting in detail
Tipcall question mostly available to in ner
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 6 interview rounds.
A well foundation is a type of foundation used for heavy structures like bridges and buildings in waterlogged areas.
It is a type of deep foundation
It is used in areas with waterlogged soil
It consists of a large diameter well or caisson sunk into the ground
The well is filled with concrete and reinforced steel
The foundation is suitable for heavy structures like bridges and buildings
Examples include the foundation of the
posted on 20 Sep 2022
I applied via Referral and was interviewed before Sep 2021. There was 1 interview round.
posted on 3 Mar 2021
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
The bund height of my previous job was 3 meters.
The bund height refers to the height of an embankment or barrier constructed to contain or control the flow of liquids, such as water or chemicals.
In my previous job, I was responsible for designing and constructing a bund to contain hazardous materials.
The bund height of 3 meters was determined based on the volume and characteristics of the materials being stored.
I ensur...
Bottom width of the dam is the width of the base of the dam at its lowest point.
Bottom width is an important factor in determining the stability of the dam.
It is usually wider than the top width to provide a stable foundation.
The width varies depending on the height and type of dam.
For example, a concrete gravity dam may have a bottom width of 1/4 to 1/3 of its height.
A rockfill dam may have a bottom width of 1/2 to 2/
The procedure to start an earthen dam involves site selection, design, construction, and maintenance.
Site selection involves identifying a suitable location with adequate soil and water resources.
Design involves determining the dam's height, width, and slope, as well as spillway and outlet structures.
Construction involves excavating the foundation, building the embankment, and installing spillway and outlet structures.
...
I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Fe500 is a type of high-strength reinforcement steel used in construction.
Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).
It is commonly used in construction for its high strength and durability.
Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.
It is also known as TMT (Thermo-Mechanically Treated) s...
based on 1 interview
Interview experience
Graduate Engineer Trainee (Get)
48
salaries
| ₹5 L/yr - ₹7 L/yr |
Senior Software Engineer
28
salaries
| ₹9 L/yr - ₹25.1 L/yr |
Assistant Manager
25
salaries
| ₹7.1 L/yr - ₹15.4 L/yr |
Senior Engineer
25
salaries
| ₹5.6 L/yr - ₹14.5 L/yr |
Software Engineer
20
salaries
| ₹4.8 L/yr - ₹24 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures