Upload Button Icon Add office photos

Filter interviews by

L&T Buildings & Factories Engineering Manager Interview Questions and Answers

Updated 13 Feb 2025

L&T Buildings & Factories Engineering Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response
Round 1 - Technical 

(2 Questions)

  • Q1. What is the process involved in structure erection?
  • Q2. Team size
Round 2 - HR 

(1 Question)

  • Q1. Ready to relocate

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Why do you want leave your current Job
  • Q2. When can you join
Round 3 - One-on-one 

(1 Question)

  • Q1. Expected Salary
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Why do you want leave your current Job
  • Q2. When can you join
Round 3 - One-on-one 

(1 Question)

  • Q1. Expected Salary
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before May 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic of Transmission Tower Design.
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - The interviewers concentrate more on your technical knowledge.

I applied via Company Website and was interviewed in Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to take steel measurement
  • Ans. 

    Steel measurement can be taken using various methods depending on the type of steel and the purpose of measurement.

    • Use a micrometer or caliper to measure the thickness of steel plates or sheets.

    • Use a tape measure or ruler to measure the length and width of steel bars or pipes.

    • Use ultrasonic testing to measure the thickness of steel pipes or tanks.

    • Use X-ray fluorescence (XRF) to measure the chemical composition of steel...

  • Answered by AI
  • Q2. How will u calculate cost
  • Ans. 

    Cost can be calculated by considering all the expenses incurred in the production process.

    • Identify all the expenses incurred in the production process

    • Determine the quantity of materials required for production

    • Calculate the cost of each material

    • Add the cost of labor and overhead expenses

    • Determine the profit margin and add it to the total cost

    • Divide the total cost by the number of units produced to get the cost per unit

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Self confidence is much more important than anything

L&T Buildings & Factories Interview FAQs

How many rounds are there in L&T Buildings & Factories Engineering Manager interview?
L&T Buildings & Factories interview process usually has 2 rounds. The most common rounds in the L&T Buildings & Factories interview process are Technical and HR.
What are the top questions asked in L&T Buildings & Factories Engineering Manager interview?

Some of the top questions asked at the L&T Buildings & Factories Engineering Manager interview -

  1. What is the process involved in structure erecti...read more
  2. Ready to reloc...read more

Tell us how to improve this page.

L&T Buildings & Factories Engineering Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
KEC International Interview Questions
4.0
 • 297 Interviews
TCE Interview Questions
3.8
 • 247 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
Worley Interview Questions
4.1
 • 109 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all

L&T Buildings & Factories Engineering Manager Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

2.0

Skill development

2.0

Work-life balance

2.0

Salary

3.0

Job security

2.0

Company culture

4.0

Promotions

2.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
8 salaries
unlock blur

₹3.3 L/yr - ₹6.1 L/yr

Assistant Manager
7 salaries
unlock blur

₹7.2 L/yr - ₹10.4 L/yr

Senior Engineer
6 salaries
unlock blur

₹6 L/yr - ₹6.9 L/yr

Civil Engineer
4 salaries
unlock blur

₹2.6 L/yr - ₹4.5 L/yr

Assistant Manager Civil
4 salaries
unlock blur

₹13 L/yr - ₹13 L/yr

Explore more salaries
Compare L&T Buildings & Factories with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.8
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview