I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
I have extensive knowledge and experience in Q/C and safety control.
I have a thorough understanding of quality control processes and procedures.
I am familiar with safety regulations and protocols.
I have experience implementing safety measures and ensuring compliance.
I have worked with teams to develop and implement quality control plans.
I have conducted safety audits and inspections to identify potential hazards.
I have...
I believe in treating all employees and contractors with respect, fairness, and professionalism.
I communicate clearly and effectively with all team members.
I listen actively to their concerns and ideas.
I provide constructive feedback and recognition for their work.
I ensure that everyone is treated fairly and equally.
I lead by example and maintain a positive attitude.
I encourage collaboration and teamwork.
I address any ...
Yes, I believe in total planning of the project and break it down into daily, weekly, fortnightly, and monthly tasks.
I create a detailed project plan with timelines and milestones
I regularly review and update the plan to ensure it stays on track
I communicate the plan and progress to stakeholders
I prioritize tasks based on their importance and urgency
I have implemented a system of checks and balances to ensure proper control of materials, equipment, and labor provided by contractors.
Established a detailed inventory system to track all materials and equipment provided by contractors
Implemented regular inspections to ensure equipment is in good working condition and being used properly
Conducted regular meetings with contractors to discuss labor allocation and progres...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
The project involves managing the development of a new mobile application for a retail company.
Coordinating with the development team to ensure timely delivery of the app
Creating and managing project timelines and milestones
Collaborating with stakeholders to gather requirements and feedback
Monitoring and controlling project budget and resources
posted on 8 Feb 2024
I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.
posted on 20 Oct 2023
I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.
Negotiate a fair CTC and discuss retention deductions based on company policy.
Negotiate a CTC that aligns with your skills, experience, and market standards.
Discuss the company's retention policy and understand the reasons behind the deduction.
Consider the overall benefits package, growth opportunities, and work-life balance offered by the company.
Ensure transparency and clarity in the negotiation process to reach a mu
posted on 30 Jul 2022
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
The project life cycle is the series of phases a project goes through from initiation to closure.
Initiation: Define the project, identify stakeholders, and create a business case.
Planning: Develop a project plan, schedule, budget, and resource plan.
Execution: Implement the project plan, manage resources, and deliver the project.
Monitoring and Control: Track progress, manage changes, and ensure quality.
Closure: Close ou...
I interact with virtual teams on a daily basis and can join immediately.
I have experience working with virtual teams and understand the challenges and dynamics involved.
I use various communication tools and platforms to interact with virtual team members.
I prioritize regular check-ins and meetings to ensure effective collaboration and progress tracking.
I am comfortable with remote work and can adapt quickly to differen...
I applied via Naukri.com and was interviewed before Nov 2022. There were 4 interview rounds.
Civil Site Engineer
7
salaries
| ₹2 L/yr - ₹3.4 L/yr |
Senior Engineer
4
salaries
| ₹4.6 L/yr - ₹6.1 L/yr |
QC Engineer
4
salaries
| ₹1.5 L/yr - ₹5.4 L/yr |
Assistant Manager Civil
3
salaries
| ₹6.5 L/yr - ₹7.6 L/yr |
DGM-Projects
3
salaries
| ₹14.8 L/yr - ₹18 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group