Filter interviews by
I applied via Referral and was interviewed in Jan 2023. There were 3 interview rounds.
Production control:
Dispatching (parts)
Following up
Inspection
Corrective
Quality assurance:
Managing tool,and process oriented, prevention of defects
Quality control:
Qc tools are used in problem solving
Qc _ product oriented
Detection of defects
Production planning
Planning, routing, scheduling, leading
1.Tpm-Total Productive maintenance
There are 4 steps ,
Tpm aims_BAD
zero Breakdown
zero Defects
Zero Accidents
Quality circle project
Cost Reduction
Zero defects
Cycle Time Reduction
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The selection of a pump for xyz requirement depends on various factors such as flow rate, head, viscosity, and type of fluid.
Determine the required flow rate and head for the application
Consider the viscosity and type of fluid being pumped
Select a pump type that is suitable for the application, such as centrifugal, positive displacement, or diaphragm pumps
Check the pump's performance curve to ensure it meets the requir...
Top trending discussions
I appeared for an interview in Sep 2021.
I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.
The questions cover topics related to turbochargers, IC engines, engine parts, manufacturing processes, management skills, and interpersonal communication.
Turbocharger is a device that increases the efficiency and power output of an engine by forcing extra air into the combustion chamber.
IC engine works on the principle of internal combustion where fuel is burned inside the engine to produce power.
CI engine stands for ...
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
posted on 11 Sep 2020
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
based on 3 interviews
Interview experience
based on 44 reviews
Rating in categories
Assistant Manager
274
salaries
| ₹4.8 L/yr - ₹13 L/yr |
Deputy Manager
141
salaries
| ₹6.7 L/yr - ₹21 L/yr |
Senior Executive
107
salaries
| ₹4 L/yr - ₹8 L/yr |
Executive
69
salaries
| ₹3.8 L/yr - ₹7.2 L/yr |
Manager
39
salaries
| ₹10 L/yr - ₹25 L/yr |
John Deere
Cummins
ABB
KONE