Upload Button Icon Add office photos

Filter interviews by

Kota Super Thermal Power Plant ITI Electrician Interview Questions and Answers

Updated 9 Sep 2023

Kota Super Thermal Power Plant ITI Electrician Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Multimeter kya hai
  • Q2. Megar kya kaam karta hai

Interview Preparation Tips

Interview preparation tips for other job seekers - I am interested electrician job

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is transformer
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers are used to increase or decrease voltage levels in electrical circuits.

    • They consist of two coils of wire, known as the primary and secondary coils, wrapped around a core.

    • Step-up transformers increase voltage levels, while step-down transformers decrease voltage levels.

    • Transf...

  • Answered by AI
  • Q2. Electrical safety rule
Round 2 - HR 

(2 Questions)

  • Q1. Qualification is
  • Q2. Daital and place

Interview Preparation Tips

Interview preparation tips for other job seekers - What is advice electrical job is most important

ITI Electrician Interview Questions & Answers

Tata Power user image Saurav golu Singh chauhan

posted on 8 Jul 2022

I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All electrical equpement knowlage
Round 3 - One-on-one 

(1 Question)

  • Q1. Find best ans and good knowlage

Interview Preparation Tips

Interview preparation tips for other job seekers - Struggle any field and good knowlage or hard labour
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Solar project electrical work
  • Q2. Operation and maintenance
  • Q3. Electrical engineer solar project work field in complete AC DC wirk
  • Q4. All PM activities daily basis and electrical engineer working in site
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. Solar energy module replacement
  • Q2. Module replacement, transmission lines
  • Q3. Transmission lines
  • Q4. Invester change
  • Q5. Robot repairing
  • Q6. Inverter replacement
  • Q7. Robot replacement

Interview Preparation Tips

Interview preparation tips for other job seekers - Hello renew power team
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Job Fair and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tum is company main q kam karna chahta ho
  • Q2. Tum is company kye liye kay kar sakte ho
  • Q3. Kay tum is company ko or aage le ja sakte ho
Round 3 - Technical 

(2 Questions)

  • Q1. Aap adani group ko kaha tak pohca sakte ho?
  • Q2. Jaha tak pohce jaye

Interview Preparation Tips

Interview preparation tips for other job seekers - You are tha best for is company and you are resume more important for job

I applied via Walk-in

Round 1 - Technical 

(1 Question)

  • Q1. 1. basic knowledge of electrical ? 2. control and power wiring knowledge ? 3. AC motor and DC motor differences ? 4. Star delta power and control wiring ? 5. PLC and HMI knowledge ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be a possitiv attitude ,dont confused in there questions

I applied via Company Website and was interviewed in Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Work experience and skills
  • Q2. Work experience and skills development

Interview Preparation Tips

Interview preparation tips for other job seekers - I'm so happy what I hoped for your company skille dovlepmaent
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Why do want to join
  • Q2. Your long term goals

ITI Electrician Interview Questions & Answers

Tata Power user image Saurav golu Singh chauhan

posted on 8 Jul 2022

I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All electrical equpement knowlage
Round 3 - One-on-one 

(1 Question)

  • Q1. Find best ans and good knowlage

Interview Preparation Tips

Interview preparation tips for other job seekers - Struggle any field and good knowlage or hard labour

Kota Super Thermal Power Plant Interview FAQs

How many rounds are there in Kota Super Thermal Power Plant ITI Electrician interview?
Kota Super Thermal Power Plant interview process usually has 2 rounds. The most common rounds in the Kota Super Thermal Power Plant interview process are Resume Shortlist and Technical.
What are the top questions asked in Kota Super Thermal Power Plant ITI Electrician interview?

Some of the top questions asked at the Kota Super Thermal Power Plant ITI Electrician interview -

  1. Megar kya kaam karta ...read more
  2. Multimeter kya ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 198 Interviews
Adani Group Interview Questions
3.9
 • 173 Interviews
NTPC Interview Questions
4.2
 • 156 Interviews
Tata Power Interview Questions
4.0
 • 156 Interviews
Suzlon Group Interview Questions
4.1
 • 121 Interviews
Torrent Power Interview Questions
3.8
 • 117 Interviews
Eaton Corporation Interview Questions
4.0
 • 112 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
Vestas Interview Questions
4.3
 • 81 Interviews
View all

Kota Super Thermal Power Plant ITI Electrician Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 2 Reviews and Ratings
Operator
4 salaries
unlock blur

₹1 L/yr - ₹3 L/yr

Graduate Engineer Trainee (Get)
4 salaries
unlock blur

₹1 L/yr - ₹4 L/yr

System Administrator
3 salaries
unlock blur

₹3.6 L/yr - ₹3.6 L/yr

Junior Engineer
3 salaries
unlock blur

₹6 L/yr - ₹6 L/yr

Supervisor
3 salaries
unlock blur

₹1 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Kota Super Thermal Power Plant with

RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM

3.2
Compare

NTPC

4.2
Compare

Adani Power

3.9
Compare

Tata Power

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview