i
Konecranes
Filter interviews by
Clear (1)
I applied via Company Website and was interviewed in Aug 2022. There were 3 interview rounds.
Technical parameters with respect to electrical like standards, parameters, basic calculations and knowledge about plc and drives wrt material handling systems
Top trending discussions
To design a swimming diving board, I will consider the material, dimensions, weight capacity, and safety features.
Choose a durable and non-slip material like fiberglass or aluminum
Determine the appropriate length, width, and thickness based on the intended use and user demographics
Calculate the weight capacity and ensure it can support the maximum weight of a user
Incorporate safety features like a non-slip surface, rou...
I applied via Campus Placement
posted on 12 Nov 2015
I applied via Campus Placement
posted on 1 Feb 2023
To change the connector in an inline wiring harness, follow these steps:
Identify the type of connector needed for the replacement
Disconnect the existing connector from the wiring harness
Cut off the old connector, leaving enough wire length for the new connector
Strip the insulation from the wire ends
Crimp or solder the wires to the new connector
Secure the new connector to the wiring harness
Test the connection for proper
To draw a connection line, start by identifying the two points you want to connect. Then, use a ruler or straight edge to draw a straight line between the two points.
Identify the two points you want to connect
Use a ruler or straight edge to draw a straight line between the two points
Ensure the line is clear and well-defined
I applied via Referral and was interviewed before Sep 2023. There were 2 interview rounds.
Questions on logical and quants
Bernoulli principle states that an increase in the speed of a fluid occurs simultaneously with a decrease in pressure or a decrease in the fluid's potential energy.
States that as the speed of a fluid increases, its pressure decreases
Used to explain lift in airplane wings
Applies to various fluid dynamics situations such as flow through pipes
Stress is a force acting on a material that causes deformation. It can be measured using techniques like strain gauges and load cells.
Stress is a measure of the internal forces within a material resisting deformation.
It is typically measured in units of force per unit area, such as Pascals or pounds per square inch.
Common methods of measuring stress include strain gauges, load cells, and extensometers.
Stress can be cat...
I applied via Campus Placement and was interviewed in Sep 2023. There were 4 interview rounds.
The test will be quite easy. They asked question about LCM&HCF,Train and pipe problems which is very important.
The topic is about EV and their evolutions in India.
Casting solidification time is the duration it takes for molten metal to solidify in a casting process.
Casting solidification time depends on factors like material type, mold temperature, and casting geometry.
Higher pouring temperatures generally result in shorter solidification times.
Thicker sections of the casting will take longer to solidify compared to thinner sections.
Aluminum alloys typically have shorter solidif
Casting design considerations include material selection, part geometry, draft angles, surface finish, and shrinkage.
Material selection is crucial for the desired properties and performance of the final part.
Part geometry should be designed to minimize stress concentrations and ensure proper flow of molten metal.
Draft angles are necessary for easy removal of the part from the mold.
Surface finish requirements should be ...
CAD test-Housing model
I applied via Naukri.com and was interviewed in Jan 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Design Engineer
161
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
80
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Specialist
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Design Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
TIL
Sany Heavy Industry
Action Construction Equipment
L&T Construction