Upload Button Icon Add office photos

Filter interviews by

Clear (1)

Kml Mouldings Injection Moulding Operator Interview Questions, Process, and Tips

Updated 22 Apr 2022

Kml Mouldings Injection Moulding Operator Interview Experiences

1 interview found

I applied via Company Website

Round 1 - One-on-one 

(5 Questions)

  • Q1. What is this ?. injection molding.and what is processe
  • Ans. 

    Injection molding is a manufacturing process used to produce parts by injecting molten material into a mold.

    • Molten material is injected into a mold cavity

    • The material cools and solidifies, taking the shape of the mold

    • Commonly used for producing plastic parts

    • Can also be used for producing metal, glass, and ceramic parts

  • Answered by AI
  • Q2. What is the back pressure
  • Ans. 

    Back pressure is the resistance to the flow of molten plastic in the injection moulding machine.

    • It is the pressure exerted by the machine's screw on the molten plastic.

    • It helps to ensure that the plastic is properly melted and mixed.

    • Too much back pressure can cause the plastic to degrade or burn.

    • It is measured in pounds per square inch (PSI).

  • Answered by AI
  • Q3. What is the. suck buck
  • Ans. 

    There is no such term as 'suck buck' in injection moulding. It may be a mispronunciation or a term used in a different industry.

    • There is no known term in injection moulding called 'suck buck'

    • It may be a mispronunciation of a different term

    • It could be a term used in a different industry altogether

  • Answered by AI
  • Q4. What is the .short molding
  • Ans. 

    Short molding is a process where the plastic material is injected into the mold cavity for a shorter duration than usual.

    • Short molding is used to produce smaller parts with faster cycle times.

    • It requires precise control of the injection speed and pressure.

    • Short molding can result in lower part quality if not done correctly.

    • Examples of short molding applications include electronic components and medical devices.

  • Answered by AI
  • Q5. What is the full form PP.materil and melting point lower and uppar
  • Ans. 

    PP material stands for Polypropylene. Its melting point ranges from 130°C to 171°C.

    • PP is a thermoplastic polymer widely used in injection moulding.

    • It has a low density and high stiffness, making it ideal for packaging and automotive industries.

    • The melting point of PP varies depending on the grade and can range from 130°C to 171°C.

    • PP is resistant to chemicals and has good electrical insulation properties.

    • Examples of PP ...

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. What is the .ABS Full forme and melting point lower than uppar
  • Ans. 

    ABS stands for Acrylonitrile Butadiene Styrene. Its melting point is lower than its upper limit.

    • ABS is a thermoplastic polymer commonly used in injection moulding.

    • It is known for its toughness, rigidity, and resistance to impact.

    • The melting point of ABS is typically around 105-110°C, which is lower than its upper limit of around 220°C.

    • ABS is commonly used in the production of automotive parts, toys, and electronic hous

  • Answered by AI
  • Q2. What is this senck Mark and cute mark
  • Ans. 

    Sink mark and gate mark are common defects in injection moulding.

    • Sink mark is a depression on the surface of the moulded part caused by uneven cooling or insufficient packing pressure.

    • Gate mark is a small protrusion or indentation at the point where the plastic enters the mould, caused by the gate being removed from the part.

    • Both defects can be minimized by adjusting the moulding parameters, such as cooling time and pa...

  • Answered by AI
  • Q3. What is.5s and 6s Shop floor used
  • Ans. 

    5S and 6S are lean manufacturing methodologies used to organize and maintain a clean and efficient workplace.

    • 5S focuses on workplace organization and standardization of processes to improve efficiency and reduce waste.

    • 6S adds safety as a sixth element to 5S, emphasizing the importance of a safe work environment.

    • Both methodologies involve regular audits and continuous improvement to maintain a high level of organization...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Fully we'll conference and mind fresh.

Skills evaluated in this interview

Interview questions from similar companies

I applied via Approached by Company and was interviewed before Jan 2017. There were 6 interview rounds.

Interview Preparation Tips

Round: Resume Shortlist
Experience: Experience with Service criteria

Round: Test
Experience: Aptitude, technical details,how many compliments attend on per day,One given the recommendation and then asked how to do it.

Round: Company website
Experience: How to proceed,how to complaints registration process,etc

Round: Training
Experience: Product training in plants

Round: Field activity
Experience: Field training, customer interaction, product training, customer service, customer interaction etc

General Tips: Collect all market information regarding company, customer reviews, customer interaction, technical details, and four wheeler product training, warranty policy details with experience.
Thanks
Dheeraj Kumar
Skills: Communication, Body Language, Analytical Skills, Time Management
Duration: <1 week

Interview Questionnaire 

1 Question

  • Q1. Technical questions
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Walk-in and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Start with Introduce Yourself?
Round 3 - HR 

(1 Question)

  • Q1. Ask about college curriculam
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(6 Questions)

  • Q1. Polymerization process
  • Q2. Heat exchangers design
  • Ans. 

    Heat exchangers are devices used to transfer heat between two or more fluids.

    • Heat exchangers are designed to maximize heat transfer efficiency.

    • Factors to consider in design include fluid flow rates, temperature differentials, and material selection.

    • Common types of heat exchangers include shell and tube, plate, and finned tube.

    • Design considerations may also include pressure drop, fouling, and maintenance requirements.

  • Answered by AI
  • Q3. Pump affinity laws
  • Q4. Process safety management
  • Q5. Permit to work system
  • Q6. Safety in hydrocarbon area
  • Ans. 

    Safety in hydrocarbon area is crucial to prevent accidents and protect workers from potential hazards.

    • Implementing proper safety protocols and procedures

    • Regular safety inspections and audits

    • Providing adequate training for employees on handling hazardous materials

    • Using personal protective equipment (PPE) at all times

    • Emergency response plans in place in case of accidents

    • Strict adherence to regulations and guidelines set ...

  • Answered by AI

I applied via Referral and was interviewed in Oct 2019. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. All process related problems
  • Q2. Die and tools name and design
  • Q3. Machin specification
  • Ans. 

    Machin specification refers to the detailed information about the machine's capabilities and features.

    • Machin specification includes information about the machine's size, power, speed, and accuracy.

    • It also includes details about the machine's software and hardware components.

    • For example, a CNC machine's specification may include the number of axes, spindle speed, and tool changer capacity.

    • Machin specification is importa...

  • Answered by AI
  • Q4. Previous company experience
  • Ans. 

    Worked as a Production Engineer at XYZ Company for 3 years

    • Managed production schedules and ensured timely delivery of products

    • Implemented process improvements to increase efficiency and reduce waste

    • Collaborated with cross-functional teams to troubleshoot issues and optimize production

    • Trained new employees on equipment operation and safety protocols

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Its good .. Suggest to all prepare yourself with all pvc related troubleshooting.

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Production article process
  • Q2. Plastic material properties
  • Ans. 

    Plastic material properties are important for production engineers to understand.

    • Plastics can be classified as thermoplastics or thermosetting plastics.

    • Thermoplastics can be melted and reformed multiple times, while thermosetting plastics cannot.

    • Plastics have different properties such as strength, flexibility, and resistance to heat and chemicals.

    • The properties of plastics can be altered by adding fillers or additives.

    • ...

  • Answered by AI
  • Q3. How many sizes used production in machine
  • Ans. 

    The number of sizes used in production depends on the machine and the product being manufactured.

    • The number of sizes used in production varies depending on the machine and product

    • Different machines may require different sizes for production

    • The number of sizes used can be determined by analyzing the production process and the machine specifications

  • Answered by AI
  • Q4. Cutting size maintain proper

Interview Preparation Tips

Interview preparation tips for other job seekers - Machine die change also injection molding machine mould change and startup.and good quality and more Quantity production.good manpower control.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. About previous experience related
  • Q2. About skill and Qualifications
Round 3 - Technical 

(2 Questions)

  • Q1. Electrical Technical Questions
  • Q2. Utility and Extruder related Questions
Round 4 - HR 

(2 Questions)

  • Q1. Previous experience
  • Q2. Previous experience ..

Interview Questionnaire 

1 Question

  • Q1. What is DC current
  • Ans. 

    DC current is the flow of electric charge in a constant direction.

    • DC stands for Direct Current.

    • It is the opposite of AC (Alternating Current).

    • DC current flows continuously in one direction.

    • It is commonly used in batteries and electronic devices.

    • Examples of DC current include the current from a solar panel or the current from a car battery.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Battery current in active direct current
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Good and some communication questions were asked

Round 2 - Coding Test 

It was very good and asking dsa answers

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Contribute & help others!
anonymous
You can choose to be anonymous

Kml Mouldings Interview FAQs

How many rounds are there in Kml Mouldings Injection Moulding Operator interview?
Kml Mouldings interview process usually has 2 rounds. The most common rounds in the Kml Mouldings interview process are One-on-one Round and Technical.
What are the top questions asked in Kml Mouldings Injection Moulding Operator interview?

Some of the top questions asked at the Kml Mouldings Injection Moulding Operator interview -

  1. What is the full form PP.materil and melting point lower and up...read more
  2. What is the .ABS Full forme and melting point lower than up...read more
  3. What is this ?. injection molding.and what is proce...read more

Recently Viewed

INTERVIEWS

Grantley Edutech

No Interviews

INTERVIEWS

Copperpod Digital

No Interviews

INTERVIEWS

Talend Data Integration Services

No Interviews

INTERVIEWS

Reltio

No Interviews

INTERVIEWS

VAYUZ Technologies

No Interviews

INTERVIEWS

Roots Analysis

No Interviews

INTERVIEWS

Alpha Edge Infratech

No Interviews

INTERVIEWS

Reltio

No Interviews

INTERVIEWS

Reltio

No Interviews

INTERVIEWS

Kml Mouldings

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

Astral Pipe Interview Questions
4.1
 • 63 Interviews
Nilkamal Interview Questions
3.8
 • 54 Interviews
Knorr-Bremse Interview Questions
3.9
 • 54 Interviews
Goodyear Interview Questions
3.7
 • 54 Interviews
Sanden Vikas Interview Questions
4.0
 • 45 Interviews
FCC Clutch Interview Questions
4.0
 • 35 Interviews
View all

Fast track your campus placements

View all
Kml Mouldings Injection Moulding Operator Salary
based on 4 salaries
₹2 L/yr - ₹3 L/yr
18% more than the average Injection Moulding Operator Salary in India
View more details
OET
17 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Trainee Operating Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Diploma Trainee Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Kml Mouldings with

Supreme Industries

4.1
Compare

Nilkamal

3.8
Compare

Finolex Industries

3.7
Compare

Wim Plast

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview