I applied via campus placement at SVPM's College Pune University, Pune and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

First round is of aptitude test in which There are four parts Quant , Verbal , Reasoning

Round 2 - Technical 

(3 Questions)

  • Q1. In Technical interview 1- Introduce yourself 2- What is MEP 3- Which skills you have 4- Basic of electrical engineering like Transformer and circuit Breaker 5- Building Codes 6- AutoCAD commands
  • Q2. About MEP And the basic about Transformer and circuit breaker
  • Q3. BUILDING codes and basic commands in AutoCAD
  • Ans. 

    Building codes and basic commands in AutoCAD are essential for MEP Engineers.

    • Building codes ensure compliance with safety and structural standards

    • Basic commands in AutoCAD include line, circle, trim, and extend

    • Understanding building codes helps in designing MEP systems efficiently

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. In Hr round again Introduce yourself
  • Q2. Strength and Week ness How was the interview process Which prodcast you have watched recently And again about family and terms and conditions about the company and that's all. Be confident about your an...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your answer if you clear the technical interview then the 90% You are selected so just be confident and motivated and the time of interview

civil site technical supervisor Interview Questions & Answers

KPC Projects user image Anonymous

posted on 19 Apr 2022

I applied via Walk-in and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(7 Questions)

  • Q1. What about of the civil engineers rules
  • Q2. What meaning of DPR and DLR
  • Q3. You have any idea to compress testing
  • Q4. You telling about to weathering course
  • Q5. Making brickwork what type of bonding using the India
  • Q6. Daily progress report Daily labor report
  • Q7. Sorry that's all

Interview Preparation Tips

Interview preparation tips for other job seekers - Please you bold speak only

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All about material test? Concrete tests? Finishing activities Structure activities
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion
Round 4 - Case Study 

Documentation cerification

Interview Preparation Tips

Interview preparation tips for other job seekers - Do well prepare before attend. They will ask about quality inspection of activities
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Basics about Piping
Round 2 - HR 

(1 Question)

  • Q1. Salary Discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't fear about interview and Stay strong basics
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Base plate size, thickness ,tube size, thickness o.d.,id. Weight/meter Ans 150 m.m, thickness 6m.m., tube size max. 6 merer, thickness 4.0 m.m., o.d 48.3 m.m. ,i.d. 40.3 m.m. , weight/ meter 4.4 k.g
  • Q2. Type of scaffold Ans. (1) mobile tower (2) indipendent tower (3) suspended tower (4) candilever (5) racker tower (6) basket (7) febricate and frame scaffold
  • Ans. 

    There are various types of scaffolds such as mobile tower, independent tower, suspended tower, cantilever, racker tower, basket, and fabricated and frame scaffold.

    • Mobile tower scaffold is a type of scaffold that can be easily moved from one place to another.

    • Independent tower scaffold is a free-standing scaffold that does not require support from the building or structure.

    • Suspended tower scaffold is a type of scaffold t...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Gin wheel capacity Ans. 25 k.g.
  • Ans. 

    The gin wheel capacity is 25 kg.

    • The gin wheel is a pulley system used to lift and lower materials on a scaffold.

    • The capacity of the gin wheel refers to the maximum weight it can safely lift.

    • It is important to ensure that the weight of the load being lifted does not exceed the capacity of the gin wheel.

    • Exceeding the capacity can result in accidents and injuries.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good archirodon very nice company
And good management
Everything is very good

I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Planning for execution and laying of bituminous
  • Ans. 

    Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.

    • Develop a detailed project plan outlining tasks, timelines, and resources required

    • Coordinate with suppliers for timely delivery of materials

    • Ensure proper equipment and manpower are available for the execution

    • Implement quality control measures to ensure the final product meets specifications

    • Regularly monitor p...

  • Answered by AI
  • Q2. About bituminous laying

Interview Preparation Tips

Interview preparation tips for other job seekers - Production and asphalt laying
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Ask about ur last job,last salary,work culture
  • Q2. Ask about technical basic question by HR, also site related question
  • Q3. Ur personal details like where r u from and ur work history
Round 3 - Technical 

(4 Questions)

  • Q1. Ur all experiences of job
  • Ans. 

    I have extensive experience in highway engineering, including project management and design.

    • Managed multiple highway construction projects, ensuring adherence to budget and timeline

    • Designed and implemented traffic control plans for major road construction projects

    • Conducted traffic impact studies to assess the effects of proposed developments on existing road networks

    • Collaborated with multidisciplinary teams to develop ...

  • Answered by AI
  • Q2. Ur all expericences details , nature of work
  • Q3. Site related question as per morth,
  • Q4. Test required for site as per morth related to ur job profile

Interview Preparation Tips

Interview preparation tips for other job seekers - If u r engineers,
I suggest u to must follow the morth, irc code related to ur work, lab test required for ur site...

It's may be some difficulty bt explore u like a sun in between star...
Round 1 - Technical 

(5 Questions)

  • Q1. What is the store operation
  • Ans. 

    Store operation refers to the process of managing and maintaining inventory in a retail store.

    • Receiving and inspecting incoming shipments

    • Organizing and storing products in the appropriate location

    • Maintaining accurate inventory records

    • Issuing products to customers or other departments

    • Performing regular stock checks and audits

  • Answered by AI
  • Q2. Which basis material received
  • Q3. What is the meaning of FIFO
  • Ans. 

    FIFO stands for First In First Out. It is a method of inventory management where the oldest stock is sold first.

    • FIFO ensures that the oldest stock is sold first

    • It is commonly used in industries with perishable goods such as food and pharmaceuticals

    • It helps prevent spoilage and waste of products

    • FIFO is also used in accounting to calculate the cost of goods sold

    • Example: A grocery store uses FIFO to ensure that the oldest

  • Answered by AI
  • Q4. How to purchase material
  • Ans. 

    To purchase material, one must follow a systematic process that involves identifying the need, selecting a supplier, negotiating terms, and placing an order.

    • Identify the need for the material

    • Select a supplier based on quality, price, and delivery time

    • Negotiate terms such as payment, delivery, and returns

    • Place an order and follow up on delivery

    • Maintain records of purchases for future reference

  • Answered by AI
  • Q5. How to chuck transferems
  • Ans. 

    To chuck transferems, ensure proper labeling and packaging, and follow established protocols for disposal.

    • Label transferems with appropriate information such as date, contents, and destination.

    • Package transferems securely to prevent leaks or spills during transport.

    • Follow established protocols for disposal, which may include incineration or chemical treatment.

    • Ensure compliance with all relevant regulations and guidelin...

  • Answered by AI
Round 2 - Assignment 

Why your resigned previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - Gaja engineering is good company .and interview also asking knowledge questions .

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Item rate based questions
Round 3 - HR 

(2 Questions)

  • Q1. Salary expectation and documents
  • Q2. If you how many salary expectation

Interview Preparation Tips

Topics to prepare for Amara Raja Infra Deputy Executive Engineer interview:
  • Each and every
Interview preparation tips for other job seekers - Be well prepared and all documents are required like
Salary payslip and previous company offer letter or experience letter
Round 1 - Technical 

(5 Questions)

  • Q1. Riggeng work refinery oil plant power plant raging work my good experience
  • Q2. Rigging work loading unloading election
  • Q3. My experience 12 years
  • Q4. My good experience working in Rigging
  • Q5. BEC is good company PC is all member stop very good working

Interview Preparation Tips

Interview preparation tips for other job seekers - BEC good company all member staff very good working

Kla Construction Technologies Interview FAQs

How to prepare for Kla Construction Technologies interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Kla Construction Technologies. The most common topics and skills that interviewers at Kla Construction Technologies expect are Billing, Billing Engineering, Boq, Business Development and Civil.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 691 Interviews
Tata Projects Interview Questions
4.3
 • 398 Interviews
GMR Group Interview Questions
4.1
 • 74 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Kla Construction Technologies Reviews and Ratings

based on 34 reviews

4.3/5

Rating in categories

3.6

Skill development

3.4

Work-Life balance

3.6

Salary & Benefits

3.6

Job Security

3.7

Company culture

3.2

Promotions/Appraisal

3.5

Work Satisfaction

Explore 34 Reviews and Ratings
Senior Civil Engineer
5 salaries
unlock blur

₹4.2 L/yr - ₹5.5 L/yr

Civil Engineer
5 salaries
unlock blur

₹2.2 L/yr - ₹4.3 L/yr

Senior Project Engineer
5 salaries
unlock blur

₹3.6 L/yr - ₹4.3 L/yr

Senior Project Manager
5 salaries
unlock blur

₹9.6 L/yr - ₹11.4 L/yr

Assistant Manager
4 salaries
unlock blur

₹3 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Kla Construction Technologies with

L&T Construction

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview