Filter interviews by
Be the first one to contribute and help others!
I applied via campus placement at SVPM's College Pune University, Pune and was interviewed in Mar 2024. There were 3 interview rounds.
First round is of aptitude test in which There are four parts Quant , Verbal , Reasoning
Building codes and basic commands in AutoCAD are essential for MEP Engineers.
Building codes ensure compliance with safety and structural standards
Basic commands in AutoCAD include line, circle, trim, and extend
Understanding building codes helps in designing MEP systems efficiently
posted on 19 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2023. There were 4 interview rounds.
Documentation cerification
posted on 1 Feb 2024
There are various types of scaffolds such as mobile tower, independent tower, suspended tower, cantilever, racker tower, basket, and fabricated and frame scaffold.
Mobile tower scaffold is a type of scaffold that can be easily moved from one place to another.
Independent tower scaffold is a free-standing scaffold that does not require support from the building or structure.
Suspended tower scaffold is a type of scaffold t...
The gin wheel capacity is 25 kg.
The gin wheel is a pulley system used to lift and lower materials on a scaffold.
The capacity of the gin wheel refers to the maximum weight it can safely lift.
It is important to ensure that the weight of the load being lifted does not exceed the capacity of the gin wheel.
Exceeding the capacity can result in accidents and injuries.
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.
Develop a detailed project plan outlining tasks, timelines, and resources required
Coordinate with suppliers for timely delivery of materials
Ensure proper equipment and manpower are available for the execution
Implement quality control measures to ensure the final product meets specifications
Regularly monitor p...
posted on 14 Feb 2023
I applied via Company Website and was interviewed in Aug 2022. There were 3 interview rounds.
I have extensive experience in highway engineering, including project management and design.
Managed multiple highway construction projects, ensuring adherence to budget and timeline
Designed and implemented traffic control plans for major road construction projects
Conducted traffic impact studies to assess the effects of proposed developments on existing road networks
Collaborated with multidisciplinary teams to develop ...
Store operation refers to the process of managing and maintaining inventory in a retail store.
Receiving and inspecting incoming shipments
Organizing and storing products in the appropriate location
Maintaining accurate inventory records
Issuing products to customers or other departments
Performing regular stock checks and audits
FIFO stands for First In First Out. It is a method of inventory management where the oldest stock is sold first.
FIFO ensures that the oldest stock is sold first
It is commonly used in industries with perishable goods such as food and pharmaceuticals
It helps prevent spoilage and waste of products
FIFO is also used in accounting to calculate the cost of goods sold
Example: A grocery store uses FIFO to ensure that the oldest
To purchase material, one must follow a systematic process that involves identifying the need, selecting a supplier, negotiating terms, and placing an order.
Identify the need for the material
Select a supplier based on quality, price, and delivery time
Negotiate terms such as payment, delivery, and returns
Place an order and follow up on delivery
Maintain records of purchases for future reference
To chuck transferems, ensure proper labeling and packaging, and follow established protocols for disposal.
Label transferems with appropriate information such as date, contents, and destination.
Package transferems securely to prevent leaks or spills during transport.
Follow established protocols for disposal, which may include incineration or chemical treatment.
Ensure compliance with all relevant regulations and guidelin...
Why your resigned previous company
posted on 21 Feb 2023
I applied via Naukri.com and was interviewed in Aug 2022. There were 3 interview rounds.
based on 34 reviews
Rating in categories
Senior Civil Engineer
5
salaries
| ₹4.2 L/yr - ₹5.5 L/yr |
Civil Engineer
5
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Senior Project Engineer
5
salaries
| ₹3.6 L/yr - ₹4.3 L/yr |
Senior Project Manager
5
salaries
| ₹9.6 L/yr - ₹11.4 L/yr |
Assistant Manager
4
salaries
| ₹3 L/yr - ₹4.8 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company