Filter interviews by
I was interviewed in Jan 2024.
I was interviewed before Jan 2021.
Diploma
posted on 29 Jan 2022
I applied via Naukri.com and was interviewed in Jul 2021. There were 2 interview rounds.
I am looking for a change to further develop my skills and take on new challenges in my career as a Project Site Engineer.
Seeking opportunities for professional growth
Wanting to work on larger and more complex projects
Desire to expand knowledge and skills in different areas of engineering
Looking for a company with a strong team culture and supportive work environment
My strengths include strong problem-solving skills, attention to detail, and effective communication. My weaknesses include a tendency to be overly critical of my own work and a desire for perfection.
Strength: Strong problem-solving skills - I am able to analyze complex problems and come up with effective solutions.
Strength: Attention to detail - I pay close attention to the small details to ensure accuracy and quality...
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Planning for production involves creating a detailed schedule, coordinating resources, and optimizing efficiency.
Develop a production schedule to ensure timely delivery of products
Coordinate with different departments to allocate resources effectively
Optimize production processes to increase efficiency and reduce costs
posted on 18 May 2020
I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.
Control valve calibration involves adjusting the valve to ensure it operates within specified parameters.
Determine the valve's operating range and desired set points
Use a calibration bench or in-line calibration equipment to adjust the valve's position and response time
Verify the valve's performance using a flow meter or pressure gauge
Document the calibration process and results for future reference
posted on 23 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
I have 8 years of experience in field surveying.
I have 8 years of experience in conducting field surveys for various projects.
I am proficient in using surveying equipment such as total stations and GPS devices.
I have experience in analyzing survey data and creating detailed reports.
I have worked on projects ranging from land development to infrastructure construction.
Yes, I have knowledge in DGPS and Total Station.
I have experience using DGPS for precise positioning in surveying and mapping.
I am familiar with Total Station equipment for measuring angles and distances in surveying.
I have used both DGPS and Total Station in various engineering projects.
I am proficient in data collection and analysis using DGPS and Total Station technology.
My current CTC per month is $10,000 and per year is $120,000.
Current CTC per month: $10,000
Current CTC per year: $120,000
Topography survey is a detailed mapping of the natural and man-made features of a piece of land.
Topography survey involves measuring and mapping the elevation, contours, and features of a land area.
It helps in understanding the terrain, drainage patterns, and existing structures on the land.
Topography surveys are essential for construction projects, land development, and environmental assessments.
Surveyors use speciali...
RL stands for Reinforcement Learning, a type of machine learning where an agent learns to make decisions by interacting with an environment.
RL involves an agent learning to take actions in an environment to maximize some notion of cumulative reward.
It is based on the idea of trial and error learning, where the agent learns from the consequences of its actions.
Examples of RL algorithms include Q-Learning, Deep Q Network
A KMZ file is a compressed version of a KML file used for displaying geographic data in Google Earth.
Create or download a KML file with geographic data
Compress the KML file using a tool like 7-Zip or WinZip
Change the file extension from .zip to .kmz
Open the KMZ file in Google Earth to view the geographic data
The Traverse is a method used in surveying and navigation to move through an area by taking a series of connected measurements and directions.
Traverse involves measuring distances and angles between points to create a connected path.
It is commonly used in land surveying, construction, and navigation.
Traverse can be closed or open depending on whether it returns to the starting point.
Example: A land surveyor uses a trav
Error distribution in a point can be achieved by considering the uncertainty in measurements and applying statistical methods.
Consider the uncertainty in measurements to determine the range of possible values for the point.
Apply statistical methods such as standard deviation to distribute the error around the point.
Use error propagation techniques to calculate the overall error in the point based on the errors in indiv
Total Station is a surveying instrument used for measuring angles and distances to accurately layout areas.
Set up the Total Station at a known point with a clear line of sight to the area to be surveyed.
Calibrate the instrument by leveling it and inputting the necessary parameters such as height and angle.
Measure distances and angles to various points in the area to create a detailed map or layout.
Use the data collecte...
I have 8 years of experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.
8 years experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.
Proficient in using all mentioned surveying instruments.
Experience in conducting precise measurements for various projects.
Skilled in data collection and analysis using these instruments.
Dumpy level, auto level, and digital level are all types of surveying instruments used for measuring horizontal and vertical levels.
Dumpy level is a basic surveying instrument with a telescope and bubble level for measuring horizontal and vertical angles.
Auto level is a more advanced version of a dumpy level that automatically adjusts the line of sight to be horizontal.
Digital level is a modern surveying instrument tha...
based on 1 interview
Interview experience
Assistant Manager
77
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata BlueScope Steel
Jindal Steel and Power
Everest Industries
Pennar Industries