Filter interviews by
I applied via campus placement at Crescent Engineering College, Chennai
Top trending discussions
I applied via Referral and was interviewed in Sep 2024. There were 3 interview rounds.
Cement is tested for its quality and strength. Types include Portland cement, rapid hardening cement, and white cement.
Cement is tested for compressive strength, fineness, setting time, soundness, and consistency.
Types of cement include Portland cement, rapid hardening cement, white cement, etc.
Example: Portland cement is commonly used in construction for its versatility and durability.
Slump cone test is used to measure the workability of concrete. The size of the slump cone is standardized.
Slump cone test is a common test used in construction to determine the consistency of concrete mix.
The size of the slump cone is typically 12 inches in height, 8 inches in diameter at the base, and 4 inches in diameter at the top.
During the test, the slump cone is filled with concrete, compacted, and then lifted o...
Whose cement is best, Complaint Handling experience?
Seeking new challenges and opportunities for growth.
Looking for a new challenge to expand my skills and knowledge.
Seeking opportunities for career advancement and growth.
Wanting to work in a more dynamic and fast-paced environment.
Interested in exploring different industries or sectors.
Desire for a better work-life balance or location change.
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
I am currently located in New York City.
Living in a bustling urban environment
Close proximity to various amenities and attractions
Access to public transportation
Diverse cultural experiences
Examples: Times Square, Central Park, Broadway shows
As an Assistant Manager, my job role involves supporting the manager in overseeing daily operations, managing staff, and ensuring the smooth running of the business.
Supporting the manager in daily operations
Managing and supervising staff
Ensuring compliance with company policies and procedures
Assisting in developing and implementing strategies to improve business performance
Handling customer complaints and resolving iss...
I am a dedicated and organized individual with strong leadership skills and a passion for helping others succeed.
Dedicated and hardworking
Strong leadership skills
Passionate about helping others succeed
An erection plan is a detailed document outlining the steps and timeline for constructing a building or structure.
Includes detailed schedule of tasks and milestones
Specifies materials and equipment needed for each phase
Outlines safety measures and quality control procedures
May include diagrams or blueprints for reference
Handling complexity involves breaking down tasks, prioritizing, delegating, and staying organized.
Break down complex tasks into smaller, manageable steps
Prioritize tasks based on importance and deadlines
Delegate tasks to team members when necessary
Stay organized with to-do lists, calendars, and project management tools
I applied via Approached by Company and was interviewed in May 2024. There were 2 interview rounds.
Discuss About Network Expansion, Product Growth, Target Achivement, Market Competitor Information, Market Opportunity, Sale Volume Growth, Warehouse Stock Management, Dispatch Process, Invoicing, Product Category, Market Price.
My CTC expectations are in line with industry standards for an Assistant Manager role.
Research industry standards for Assistant Manager CTC
Consider my experience, skills, and qualifications
Negotiate based on job responsibilities and company size
Provide a range rather than a specific number
I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.
Improving the reliability of HEMM involves regular maintenance, training for operators, and implementing advanced monitoring systems.
Regular maintenance schedules to prevent breakdowns
Training programs for operators to ensure proper usage and care of equipment
Implementing advanced monitoring systems to detect issues early
Using high-quality spare parts for replacements
Implementing a predictive maintenance program to ant
I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
I have 5 years of experience as an Assistant Manager at XYZ Company.
Managed a team of 10 employees to achieve sales targets
Implemented new training programs to improve employee performance
Developed and executed marketing strategies to increase customer base
Plant load factor is a measure of the actual output of a power plant compared to its maximum possible output.
Plant load factor is calculated by dividing the actual energy generated by the plant over a specific period by the maximum possible energy that could have been generated during the same period.
It is expressed as a percentage and indicates how efficiently a power plant is being utilized.
A high plant load factor i...
To reduce routine maintenance and increase planned maintenance, focus on preventive maintenance strategies, implement predictive maintenance technologies, prioritize critical assets, and improve scheduling and resource allocation.
Implement a preventive maintenance program to address issues before they become costly breakdowns.
Utilize predictive maintenance technologies such as sensors and data analytics to anticipate e...
Turbine overhauling activities involve disassembling, inspecting, repairing, and reassembling turbine components to ensure optimal performance.
Turbine overhauling is a critical maintenance activity to ensure the efficient operation of turbines.
It involves disassembling the turbine to inspect and assess the condition of components.
Repairs or replacements are made as necessary to address any issues found during inspectio...
Reasoning with math's
based on 1 review
Rating in categories
Executive Production
15
salaries
| ₹4.2 L/yr - ₹7.5 L/yr |
Senior Executive
9
salaries
| ₹4.1 L/yr - ₹7.5 L/yr |
Executive
7
salaries
| ₹4.2 L/yr - ₹6.7 L/yr |
Executive Quality Assurance
6
salaries
| ₹3.1 L/yr - ₹6 L/yr |
Assistant Manager
5
salaries
| ₹7 L/yr - ₹11.9 L/yr |
Supreme Industries
Finolex Industries
Prince Pipes & Fittings
Ashirvad Pipes