Purpose relay is used to protect the equipment from damage due to abnormal conditions in the power system.
Purpose relay is a protective relay that operates when the power system experiences abnormal conditions.
It is used to protect equipment such as transformers, generators, and transmission lines from damage.
Purpose relay can detect faults such as overvoltage, undervoltage, overcurrent, and underfrequency.
When a fault...
Transformers are used in electrical systems to change the voltage level of electricity.
Transformers are used to step up or step down the voltage in an electrical system.
They are essential for transmitting electricity over long distances.
Transformers help in reducing energy losses during transmission.
They are used in power distribution systems to match the voltage levels of different devices.
Transformers are also used i...
I applied via Company Website and was interviewed in Aug 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Jul 2023. There were 2 interview rounds.
Kerala State Electricity Board interview questions for popular designations
Get interview-ready with Top Kerala State Electricity Board Interview Questions
I applied via Referral and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed before Aug 2023. There was 1 interview round.
Top trending discussions
Some of the top questions asked at the Kerala State Electricity Board interview -
The duration of Kerala State Electricity Board interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 15 interviews
Interview experience
based on 297 reviews
Rating in categories
Sub Engineer
152
salaries
| ₹0 L/yr - ₹0 L/yr |
Substation Operator
137
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
110
salaries
| ₹0 L/yr - ₹0 L/yr |
Operator
100
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Power
Adani Power
NTPC
Power Grid Corporation of India