Project approaches are the methods or strategies used to plan, execute, and complete a project.
Project management methodologies such as Agile, Waterfall, and Scrum
Risk management approaches to identify and mitigate potential project risks
Change management strategies to handle changes during the project
Communication plans to ensure effective communication among project stakeholders
Project Life Cycle is the series of phases that a project goes through from initiation to completion.
Initiation: Define the project at a broad level.
Planning: Develop a detailed project plan.
Execution: Carry out the project plan.
Monitoring and Controlling: Track and manage project performance.
Closing: Finalize all activities and formally close the project.
Example: In construction, project life cycle includes design, co
Top trending discussions
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Sep 2020. There were 3 interview rounds.
I plan to continue developing my technical skills and taking on leadership roles within the company.
Pursue advanced technical certifications
Lead cross-functional teams on complex projects
Mentor junior engineers
Explore opportunities for innovation and process improvement
Collaborate with senior management to set strategic goals
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 3 interview rounds.
Unit testing for adding two numbers
Create a test case with two numbers and expected sum
Call the function that adds two numbers
Assert that the result matches the expected sum
I applied via Naukri.com and was interviewed in Jun 2024. There were 3 interview rounds.
Solving questions paper
CAD &Solid work test
General work related assignment
QA stands for Quality Assurance and involves processes to prevent defects, while QC stands for Quality Control and involves processes to identify defects.
QA focuses on preventing defects in the product or service being delivered
QC focuses on identifying defects in the product or service being delivered
QA involves processes such as reviews, audits, and process improvements
QC involves processes such as testing, inspectio...
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
I am a Senior Engineer with 10+ years of experience in software development, specializing in backend systems and database management.
10+ years of experience in software development
Specialize in backend systems and database management
Strong problem-solving skills
Experience with various programming languages such as Java, Python, and SQL
Achievements in previous experience
I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.
Equipment used in steam turbine include turbine blades, nozzles, casing, rotor, bearings, and governor.
Turbine blades: convert steam energy into mechanical energy
Nozzles: control the flow of steam into the turbine
Casing: contains and directs the steam flow through the turbine
Rotor: connected to the turbine blades and rotates to generate power
Bearings: support the rotor and reduce friction
Governor: regulates the speed o
Woodward 505 is a versatile control system used in industrial applications.
The Woodward 505 is a widely used control system in industries such as power generation, oil and gas, and marine.
It offers advanced features like PID control, sequencing, and communication capabilities.
The Woodward 505 is known for its reliability and robustness in harsh operating environments.
It can be easily integrated with various types of se
The Honeywell DCS (Distributed Control System) is a modular system consisting of controllers, I/O modules, and operator stations.
Consists of controllers, I/O modules, and operator stations
Uses a network to communicate between components
Allows for centralized control and monitoring of processes
Supports various communication protocols such as Modbus, OPC, etc.
Example: Honeywell Experion PKS
PID stands for Proportional-Integral-Derivative, a control loop feedback mechanism used in engineering.
PID is a control algorithm that calculates an error value as the difference between a desired setpoint and a measured process variable.
Proportional (P) control responds to the current error value.
Integral (I) control accumulates past errors to correct the present error.
Derivative (D) control predicts future errors bas...
To assign a new channel in Honeywell DCS, you need to access the configuration software and follow the steps to add the channel.
Access the Honeywell DCS configuration software
Navigate to the channel configuration section
Add a new channel by specifying the channel number, type, and other relevant parameters
Save the changes and verify the new channel is successfully assigned
Interlocks and permissives are safety mechanisms in place to prevent unsafe operation of boiler and turbine systems.
Interlocks prevent certain actions from taking place unless specific conditions are met
Permissives allow certain actions to take place only if specific conditions are met
Example of interlock: Boiler feed pump interlock prevents the boiler from starting unless the feed pump is running
Example of permissive:...
based on 1 interview
Interview experience
Assistant Manager
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Manager
12
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Alfa Laval
Thermax Limited
GEA Group
Danfoss Industries