Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Planning Engineer and Billing Engineer Interview Questions and Answers

Updated 10 Mar 2024

KEC International Planning Engineer and Billing Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Cube testing , bricks test and quality work
  • Q2. Site layout , and bar binding
  • Q3. Quality and quantity as per drawing
  • Ans. 

    Quality and quantity as per drawing refers to ensuring that the materials and workmanship meet the specifications outlined in the project drawings.

    • Ensure that all materials used in construction match the specifications provided in the drawings

    • Verify that the workmanship meets the quality standards set forth in the drawings

    • Quantify the materials required for the project based on the drawings to ensure accurate billing

    • Co...

  • Answered by AI
  • Q4. Bricks size.Cement test
  • Q5. Bar weight factor

Interview Preparation Tips

Interview preparation tips for other job seekers - Good quality work

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

Interview Questionnaire 

1 Question

  • Q1. Preparation basic of pipeline and job procedures.

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About site handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be good technical knowledge

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Question about material reconciliation, allowable wastage question based on previous work experience
  • Q2. It's not easy to describe it in a few words because of the interview time is more

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare point base answer what u have done in ur present service and what u r going to offer them by considering a technical aspects

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

KEC International Interview FAQs

How many rounds are there in KEC International Planning Engineer and Billing Engineer interview?
KEC International interview process usually has 1 rounds. The most common rounds in the KEC International interview process are Technical.
What are the top questions asked in KEC International Planning Engineer and Billing Engineer interview?

Some of the top questions asked at the KEC International Planning Engineer and Billing Engineer interview -

  1. Quality and quantity as per draw...read more
  2. Cube testing , bricks test and quality w...read more
  3. Site layout , and bar bind...read more

Tell us how to improve this page.

KEC International Planning Engineer and Billing Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 768 Interviews
Tata Projects Interview Questions
4.2
 • 459 Interviews
Dilip Buildcon Interview Questions
4.0
 • 148 Interviews
G R Infraprojects Interview Questions
4.1
 • 137 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all
Assistant Manager
659 salaries
unlock blur

₹5.2 L/yr - ₹20 L/yr

Senior Engineer
453 salaries
unlock blur

₹4.3 L/yr - ₹14 L/yr

Civil Engineer
220 salaries
unlock blur

₹2.4 L/yr - ₹9 L/yr

Safety Officer
191 salaries
unlock blur

₹1.8 L/yr - ₹8 L/yr

Engineer
187 salaries
unlock blur

₹2.5 L/yr - ₹10 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write