I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
Calculate the Quantity of a I girder as per provided drawing.
Identify the dimensions of the I girder from the drawing.
Calculate the volume of the I girder using the formula: Volume = Area of cross-section x Length.
Consider any additional factors such as material density or wastage percentage.
Use appropriate unit conversions if necessary.
Check for any specific requirements or variations mentioned in the drawing.
A drawing was provided for steel calculations
posted on 21 Aug 2024
Steel margin refers to the difference between the cost of producing steel and the selling price.
Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.
It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.
Factors that can impact the steel margin include fluctuations in ...
The percentage of aggregate in gradation test varies depending on the specific requirements of the project.
The percentage of aggregate in gradation test is typically determined by the specifications provided for the project
It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix
For example, in a concrete mix design, the percentage of coarse aggregate ma...
The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.
Responsible for planning, organizing, and directing project activities
Ensuring project goals are met within budget and timeline
Managing resources and stakeholders effectively
Problem-solving and decision-making skills are essential
Strong communication and leadership skills are necessary
The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.
Calculate the cost of materials such as cement, aggregates, and reinforcement bars.
Consider the cost of labor for construction and installation of RCC components.
Include any additional costs such as equipment rental, transportation, and overhead expenses.
Factor in the cost of quality control me...
posted on 26 Jan 2024
I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.
The question asks about the code for mode of measurement, types of joints in flooring, and previous projects and estimation preparation.
The code for mode of measurement refers to the standard method used to measure quantities in construction projects.
Types of joints in flooring include butt joints, tongue and groove joints, and expansion joints.
Previous projects can include residential buildings, commercial complexes, ...
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is the current annual salary of the candidate.
Expected CTC is the annual salary the candidate is expecting from the new job.
It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.
For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.
Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.
I prepare detailed estimates based on quantities of materials and labor required for a project.
I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.
I use software tools...
Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.
Check quantities mentioned in the bill against the actual work done on site.
Verify rates and unit prices for each item in the bill with the contract agreement.
Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.
Conduct site measurements to confirm the work completed matches the
Evidential documents required for scrutinizing the RA Bill
Contract documents
Measurement sheets
Bills of quantities
Variation orders
Payment certificates
Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.
Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.
Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...
Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.
Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.
Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.
Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
IS code for BBS is IS 1786:2008
IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction
Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects
posted on 16 Apr 2022
My further most career goal is to become a director of project management.
To gain experience in managing large-scale projects
To develop leadership and communication skills
To build a strong network of industry professionals
To continuously learn and stay updated with industry trends
To achieve PMP certification
To work towards becoming a subject matter expert in project management
To mentor and train junior project managers
...
posted on 7 Dec 2021
I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
posted on 19 Jan 2021
I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.
posted on 15 Jan 2021
I applied via Naukri.com and was interviewed before Jan 2020. There were 5 interview rounds.
The load taken by adjustable props for shuttering works depends on various factors.
The load capacity of adjustable props depends on their size and material.
The type of shuttering work being done also affects the load taken by adjustable props.
The load can vary from a few hundred kilograms to several tons.
Adjustable props are commonly used in construction to support formwork during concrete pouring.
The load taken by adj...
There are various types of shuttering methods used in construction, each with its own advantages.
Types of shuttering methods include timber, steel, aluminum, plastic, and fabric.
Timber shuttering is cost-effective and easy to work with, while steel shuttering is durable and reusable.
Aluminum shuttering is lightweight and easy to handle, while plastic shuttering is waterproof and easy to clean.
Fabric shuttering is flexi...
The methodology for finishing activities involves planning, coordination, and attention to detail.
Create a detailed schedule for finishing activities
Coordinate with subcontractors and suppliers to ensure timely delivery of materials
Ensure quality control measures are in place and followed
Conduct regular inspections to identify and address any issues
Communicate regularly with the project team to ensure everyone is on th...
Experienced construction professional with strong leadership and project management skills.
Over 5 years of experience in the construction industry.
Managed multiple construction projects from start to finish, ensuring timely completion and within budget.
Strong knowledge of construction methods, materials, and safety regulations.
Proven ability to lead and motivate teams to achieve project goals.
Excellent communication an...
based on 1 review
Rating in categories
Assistant Manager
45
salaries
| ₹4.6 L/yr - ₹8.4 L/yr |
Highway Engineer
34
salaries
| ₹2.4 L/yr - ₹5.6 L/yr |
Accountant
27
salaries
| ₹2.6 L/yr - ₹7.8 L/yr |
Senior Engineer
25
salaries
| ₹4.5 L/yr - ₹7.9 L/yr |
Site Engineer
23
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd