I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.
GST was implemented in India on July 1, 2017.
GST was implemented in India on July 1, 2017, replacing multiple indirect taxes.
It aimed to simplify the tax structure and create a unified market across the country.
GST has different slabs for different goods and services, ranging from 0% to 28%.
It has helped in reducing tax evasion and increasing tax compliance.
Top trending discussions
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
ASME codes are widely used in the oil and gas industry to ensure safety and quality standards are met.
ASME B31.3 is the code for process piping in oil and gas facilities
ASME Section VIII is used for pressure vessels in oil and gas industry
ASME B31.4 is for liquid pipelines in oil and gas industry
posted on 13 Aug 2022
I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
My strength is my ability to lead and motivate a team towards achieving goals.
Effective communication skills
Strong decision-making abilities
Ability to delegate tasks efficiently
Positive attitude towards challenges
Experience in managing teams
Motivational skills
Goal-oriented mindset
posted on 29 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
posted on 21 Feb 2022
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu
posted on 22 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
posted on 3 Jun 2020
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
In my last organization, the working process involved cross-functional collaboration, data analysis, and regular reporting to management.
Regular team meetings to discuss project progress
Collaboration with different departments to gather data and insights
Utilization of data analysis tools to identify trends and patterns
Creation of detailed reports for management review
Implementation of feedback and adjustments based on
Seeking new challenges and growth opportunities
Looking to expand my skill set and knowledge
Interested in taking on more responsibility
Seeking a more dynamic work environment
Want to work with a diverse team and learn from different perspectives
based on 1 interview
Interview experience
Quality Engineer
67
salaries
| ₹1.5 L/yr - ₹4.1 L/yr |
Production Engineer
53
salaries
| ₹1.2 L/yr - ₹4.8 L/yr |
Assistant Manager
33
salaries
| ₹4.8 L/yr - ₹9 L/yr |
Graduate Engineer Trainee (Get)
17
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Safety Officer
16
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Ramky Infrastructure
L & W Constructions