Upload Button Icon Add office photos

Filter interviews by

Clear (1)

Kalpataru Projects International Deputy Electrical Project Manager Interview Questions and Answers

Updated 17 Feb 2024

Kalpataru Projects International Deputy Electrical Project Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Why you're switching the company
Round 2 - Technical 

(2 Questions)

  • Q1. What's tan delta,and values
  • Ans. 

    Tan delta is a measure of the dissipation factor in electrical insulation materials.

    • Tan delta is the ratio of the resistive component to the reactive component of a material's impedance.

    • It is used to assess the quality of insulation in electrical equipment.

    • Lower tan delta values indicate better insulation performance.

    • For example, a tan delta value of 0.001 means that only 0.1% of the energy is lost as heat.

  • Answered by AI
  • Q2. Buchholz operated,what will you do further

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions based on maintenance of Substations

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on your previous jobs

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Piping code and welder qualifications test
  • Ans. 

    Piping code and welder qualifications test

    • Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.

    • Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.

    • Both piping code and welder qualifications test are important in ensu...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just specific to your answer.
WQT/wps required in detail

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basics of fabrication and Erection methods
  • Q2. Regarding Safety
  • Q3. Resources management
  • Q4. Project planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Cool and prepared for all technical

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

Mathematics, English, Reasoning

Round 2 - Technical 

(2 Questions)

  • Q1. They asked Technical questions
  • Q2. What is antenna What is satcom
  • Ans. 

    An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.

    • Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.

    • Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...

  • Answered by AI
Round 3 - Group Discussion 

Clean India
Corruption

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and believe in yourself

Interview Questionnaire 

1 Question

  • Q1. What is your role in previous company

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.
Contribute & help others!
anonymous
You can choose to be anonymous

Kalpataru Projects International Interview FAQs

How many rounds are there in Kalpataru Projects International Deputy Electrical Project Manager interview?
Kalpataru Projects International interview process usually has 2 rounds. The most common rounds in the Kalpataru Projects International interview process are HR and Technical.

Recently Viewed

REVIEWS

Atos

No Reviews

REVIEWS

Kalpataru Projects International

No Reviews

SALARIES

Atos

INTERVIEWS

Kalpataru Projects International

No Interviews

SALARIES

Atos

SALARIES

Atos

REVIEWS

Atos

No Reviews

SALARIES

Atos

SALARIES

Atos

SALARIES

Atos

Tell us how to improve this page.

Kalpataru Projects International Deputy Electrical Project Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 744 Interviews
Tata Projects Interview Questions
4.2
 • 426 Interviews
Siemens Interview Questions
4.1
 • 418 Interviews
KEC International Interview Questions
4.0
 • 299 Interviews
Tata Technologies Interview Questions
3.6
 • 257 Interviews
ABB Interview Questions
4.1
 • 235 Interviews
View all

Kalpataru Projects International Deputy Electrical Project Manager Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Deputy Manager
576 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
552 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
523 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
277 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
242 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Sterlite Power

4.0
Compare

Adani Transmission

3.7
Compare

Power Grid Corporation of India

4.4
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview